SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549



FORM 6-K

Report of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16 of the
Securities Exchange Act of 1934

For the month of April, 2015

Commission File Number 1-34129



CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
(Exact name of registrant as specified in its charter)



BRAZILIAN ELECTRIC POWER COMPANY
(Translation of Registrant's name into English)



Avenida Presidente Vargas, 409 - 13th floor,
Edifício Herm. Stoltz - Centro, CEP 20071-003,
Rio de Janeiro, RJ, Brazil
(Address of principal executive office)

Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F. 

Form 20-F ___X___ Form 40-F _______

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934.

Yes _______ No___X____


 

 

 

 

 

 
 
 

 

INDEX

Introduction

 























 

English Conference Call

March 31st, 2015

2:00 p.m. (Brasília)

1:00 p.m. (US EST)

5:00 p.m. (UK)

 

Webcast in English

http://webcast.conferenciacorp.com.br/view/131

 

Phone:

(+1 786) 837 9597 (US)

(+44) 20 3318 3776 (UK)

Password: 9532

 

IR Contact:

[email protected]

www.eletrobras.com /elb/ri

Tel.: (+55) (21) 2514-6333

I – Analysis of the Results of the Consolidated Companies

4

II – Analysis of the Results of the Parent Company

14

III – Eletrobras Information

17

IV –Attachment: Subsidiary Companies Information

32

IV.1 - Generation and Transmission Companies

33

Itaipu

34

Furnas

42

Chesf

74

Eletronorte

105

Eletronuclear

 

125

Eletrosul

133

CGTEE

157

IV.2 Distribution Companies

167

Amazonas Energia

168

CELG D

184

Distribuição Acre

192

Distribuição Alagoas

201

Distribuição Piauí

210

Distribuição Rondônia

219

Distribuição Roraima

228

IV.3 Participation Company

237

Eletropar

237

 

 

 

 

 
 

 
 
 

 

1.Generation and Transmission Companies

 

Company

Net Operating

Revenue

Service

Result

Income/Loss

of the Period

EBITDA

(R$ million)

Margin

EBITDA

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

Furnas

6.316

4.298

1.345

-130

-406

-654

680

207

10.8

4.8

Chesf

3.563

4.098

179

-1.210

-1.118

-466

116

-1.040

3.2

-25.4

Eletronorte

6.046

4.856

879

1.735

2.033

1.221

1.255

2.240

20.8

46.1

Eletrosul

1.119

1.084

708

495

39

267

514

566

46.0

52.2

Eletronuclear

1.927

1.718

-894

-591

-1.001

-689

-534

-246

-27.7

-14.3

CGTEE

474

298

-216

-381

-480

-472

-142

-310

-30.0

-104.0

 

Installed Capacity

 

Company

Full Ownership

(a)

SPE

(b)

Physical Aggregation 2014

Total

(a+b)

Furnas

8,830

2,029

521

10,859

Chesf

10,615

408

285

11,023

Eletronorte*

9,476

121

60

9,597

Itaipu

7,000

-

-

7,000

Eletronuclear

1,990

-

-

1,990

CGTEE

840

-

-

840

Eletrosul

428

320

303

748

Eletrobras

-

13

-

13

Distribution companies

2,083

-

-

2,083

Total

41,624

2,891

1,169

44,156

(b) The company's participation in the project

* TPU Electron, 121 MW, considered in the installed  capacity of  Eletronorte,is being used by Amazonas Energia.

 

 

Extension of Transmission Lines - Km

 

Company

Full Ownership

(a)

SPE

(b)

Physical Aggregation 2014

Total

(a+b)

Furnas

19,907

1,361

165

21,267

Chesf

19,692

1,086

393

20,778

Eletronorte

10,703

1,472

814

12,174

Eletrosul

11,140

1,531

1,827

12,671

Distribution companies

701

-

28

701

Total

62,142

5,449

3,227

67,591

(b) The company's participation in the project

 

Energy Sold – MWh

 

 

2014

2013

Itaipu

76,521,579

88,467,305

Furnas

40,560,604

42,231,758

Chesf

55,585,505

57,861,823

Eletronorte

51,260,891

52,472,887

Eletronuclear

14,113,782

13,456,230

Eletrosul

1,993,055

1,985,585

CGTEE

4,149,876

3,798,244

Total

243,544,548

260,247,831

*The data related to energy sold do not consider the sell in the short term market.

 

 

33

 


 
 
 

                                                                                                                                       

Balance Sheet

(In US$)

 

Assets

12.31.14

12.31.13

Current Assets

 

 

Cash and cash equivalents

313,950,465

387,365,027

Accounts receivable from clients

990,830,029

1,007,320,522

Stored materials

6,492,486

6,656,848

Obligation to receive

3,286,498

3,288,033

Legal deposits

34,520,767

21,106,491

Other accounts receivable

39,451,250

63,452,965

Current Assets Total

1,388,531,495

1,489,189,886

 

 

 

Non-Current Assets

 

 

Obligations to receive

218,384,799

200,840,198

Legal deposits

23,890,705

43,953,374

 

242,275,504

244,793,572

Results to compensate

 

 

From previous periods

-2,131,418,858

-942,516,046

Result for the period

-1,103,817,173

-1,188,902,812

 

-3,235,236,031

-2,131,418,858

Property, unit and equipment

17,469,614,239

17,488,882,033

Intangible

24,874,267

22,288,878

Total Non-Current Assets

14,501,527,979

15,624,545,625

Total Assets

15,890,059,474

17,113,735,511

 

34


 
 

 

 

 

Liabilities and Stockholders’ Equity

12.31.14

12.31.13

Current Liabilities

 

 

Loans and Financing

1,246,826,696

1,168,918,872

Remuneration and reimbursement

684,611,147

713,493,716

Suppliers

57,448,803

59,514,157

Pay roll and social obligations

62,920,743

58,919,188

Labor Indemnities

23,386,410

27,505,259

Provision for lawsuits

96,097,905

134,774,746

Other obligations

3,101,176

3,357,166

Total Current Liabilities

2,174,392,880

2,166,483,104

 

 

 

Non-Current Liabilities

 

 

Loans and financing

11,436,343,586

12,675,882,137

Labor Indemnities

346,449,977

345,044,078

Post-Emplyment benefits

1,759,412,051

1,696,400,179

Provision for lawsuits

70,099,686

126,411,007

Other obligations

3,361,294

3,515,006

Total Liabilities

13,615,666,594

14,847,252,407

 

 

 

 

 

 

Stockholders’ Equity

 

 

Capital

 

 

Centrais Elétricas Brasileiras SA

50,000,000

50,000,000

Administración Nacional de Electricidad

50,000,000

50,000,000

Total Stockholders’ Equity

100,000,000

10,000,000

Total Liabilities and Net Stockholders’ Equity

15,890,059,474

17,113,735,511

 

 

35

 
                                                                                                                 

 
 

 

 

Statement of Income

(US$)

 

 

 

12.31.14

12.31.13

Operating Revenues

 

 

Power supply

3,291,012,000

3,291,012,000

Remuneration on power assignment

318,374,804

377,020,357

Reimbursement of charges – non assured Energy

70,975,712

132,328,557

Operating Revenue Total

3,680,362,516

3,800,360,914

 

 

 

Operating Expenses

 

 

Remunerations and reimbursements

 

 

Capital income

-48,784,814

-48,139,048

Remuneration on power assignment

-318,374,804

-377,020,357

Assured Energy

 

 

Royalties

-411,298,648

-405,933,777

Reimbursement of charges – administration and supervision

-31,638,358

-31,225,674

Non assured Energy

 

 

Royalties

-65,906,018

-122,876,517

Reimbursement of charges – administration and supervision

-5,069,694

-9,452,040

 

-881,072,336

-994,647,413

Operating expenses

 

 

Administrative and general expenses

 

 

Personnel

-557,502,289

-558,875,869

Actuarial Provisions

-123,996,093

-43,921,855

Materials

-17,901,251

-16,429,962

Third-part related services

-101,961,380

-106,702,421

Expenses with lawsuits

-50,646,983

-41,387,322

Provision for lawsuits

74,473,567

58,759,955

Other operating expenses

-98,738,803

-98,286,170

 

-876,273,232

-806,843,644

Total of operating expenses

-1,757,345,568

-1,801,491,057

Result of Service

 

 

Other revenues / expenses

 

 

Sundry Revenues

8,881,552

9,628,450

Sundry Expenses

-58,584,531

-24,627,084

 

-49,702,979

-14,998,634

Financial Revenues

 

 

Income from financial applications

56,764,473

21,033,597

Moratory increase on Energy invoices

2,259,258

3,453

Other financial revenues

3,628,014

4,203,307

 

62,651,745

25,240,357

Financial Expenses

 

 

Debt charges

-

-2,322,697

Non-debt charges

-885,738,220

-958,676,180

Charges on remunerations and reimbursements

-2,108,825

-2,071

Monetary Variations

55,735,306

140,797,875

Other financial expenses

-36,803

-5,695

 

-832,148,541

-820,208,768

 

 

 

Financial Result

-769,496,796

-794,968,411

Net income for the period

1,103,817,172

1,188,902,812

 

36


 
 

 

 

Cash Flow

(US$)

 

 

12.31.14

12.31.13

Operating Activities

 

 

Net income for the period

1,103,817,173

1,188,902,812

Adjustments

 

 

Disposal of Fixed Assets - sales

58,155,422

23,936,521

Monetary Variation on Financing and loans

-1,927,269

-3,116,416

Monetary Variation on Estimated Obligations

-70,503,142

-177,003,049

Liability provisions

 

 

Financial charges to be capitalized

885,768,845

960,998,877

Estimated Obligations

69,969,179

-9,053,366

Adjusted Income

2,045,280,208

1,984,665,379

Variations in Assets and Liabilities

 

 

Accounts Receivable variation – Rendering of Services

16,490,493

-40,282,168

Stored Material variation

164,362

-185,536

Other Credits variation

14,326,704

15,948,262

Remuneration and reimbursement variation

-28,882,569

44,529,884

Suppliers and other variations

-2,475,056

-25,019,820

Payment-roll and social obligation variation

4,001,555

685,465

Payment of the Estimated Obligation

-34,155,277

-60,448,989

 

-30,529,788

-64,772,902

Net Operating Cash Flow

2,014,750,420

1,919,892,477

Investment Activities

 

 

Property, unit and equipment and intangible

-41,455,814

-36,646,144

Balance of the Investment Activities

-41,455,814

-36,646,144

Financing Activities

 

 

Loans and financing obtained

8,660,000

26,049,560

Amortization of the Loans and Financing

-1,168,196,548

-1,092,539,729

Payment of interest on Loans and Financing

-887,172,620

-963,654,859

Balance of the Financing Activities

-2,046,709,168

-2,030,145,028

Total of Cash Effects

-73,414,562

-146,898,695

Cash and cash equivalent – beginning of period

387,365,027

534,263,722

Cash and cash equivalent – end of period

313,950,465

387,365,027

Total of Cash Effects

-73,414,562

-146,898,695

 

37


 
 

 

 

Market Data

1.Generation Assets and Energy generated

Own assets

Unit

Installed Capacity (MW)

Guaranteed Energy (MW Average)

Energy generated – MWh

1Q14

2Q14

3Q14

4Q14

2014

Itaipu Binacional

14,000

8,577

23,251,103

22,061,975

20,848,730

21,633,585

87,795,393

 

Unit

Participation %

Location (State)

Beginning of Operation

End of Operation

Itaipu Binacional

50%

Brazil (Paraná) and Paraguay (Alto Paraná)

03/1985

-

 

2.Electric energy purchased for resale  - N/A

 

3.Energy sold

 

Own assets

 

Buyer

Sales model

1Q13

2Q13

3Q13

4Q13

2014

US$ Million1

MWh

US$ Million

MWh

US$ Million

MWh

US$ Million

MWh

US$ Million

MWh

Eletrobras System

A

-

-

-

-

-

-

 

 

 

 

B

741.4

20,103,482

759.2

19,767,360

761.9

18,351,153

732.2

18,299,584

2,994.7

76,521,579

Others

A

-

-

-

-

-

-

-

-

-

-

B

81.4

2,983,783

63.6

2,135,060

60.8

2,359,017

90.5

3,165,748

296.3

10,643,608

Total

A

-

-

-

-

-

-

-

-

-

-

B

822.8

23,087,265

822.8

21,902,420

822.7

20,710,170

822.7

21,465,332

3,291.0

87,165,187

A - Through auction

B - Through free market agreements or bilateral contracts

1Considered only the billing of assured energy  

 

4.CCEE settlement (Spot and MRE) – N/A

 

5.Fuel used to produce electricity– N/A

6.Losses in generation - %

1Q14

2Q14

3Q14

4Q14

2014

0.70

0.72

0.66

0.78

0.72

 

7.Average price– US$/KW

 

Own assets

 

1Q14

2Q14

3Q14

4Q14

2014

22.60

22.60

22.60

22.60

22.60

 

 

38


 
 

 

 

8.Extension of transmission lines – Km – N/A

 

9. Losses in Transmission - % - N/A

 

10.Main investments– US$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

Budget

Generation

 

 

 

 

 

 

Permanent

0.9

1.7

0.4

6.0

9.0

-

Techinical Reserve

0.5

0.6

1.2

0.2

2.5

-

Softwares

0.3

1.0

0.1

1.2

2.6

-

Other investments

2.5

6.2

4.3

14.4

27.4

-

Total

4.2

9.5

6.0

21.8

41.5

-

 

11.New investments – N/A

 

12.Loans and financing – US$ million

Local currency - LC

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due

Index

FIBRA – Fundação Itaipu – BR

36.8

37.8

33.4

30.5

2023

6.0% + INPC

 

Foreign currency - FC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Currency

Eletrobras

4,912.1

4,740.2

4,565.7

4,388.5

2021/2023

US$

National Treasury

8,289.4

8,176.2

8,061.2

7,944.2

2023

US$

Restructuring of foreign debt

256.9

244.9

246.8

244.9

2023

US$

CAJUBI – Fundação Itaipu – PY

70.8

69.4

67.8

66.3

2021/2022

US$

Paraguayan Banks

-

-

2.2

8.7

2016/2018/2022

US$

TOTAL

13,529.2

13,230.7

12,943.7

12,652.6

 

 

 

13.Contracts – US$ million

 

13.1.Loans and financing

Loans and financing

2015

2016

2017

2018

2019

After

2019

Total (LC+FC)

By activity

Generation

1,246.8

1,326.8

1,413.2

1,507.2

1,607.6

5,581.5

12,683.1

By creditor

Eletrobras

596.6

485.2

516.7

550.7

587.1

1,652.2

4,388.5

Others

650.2

841.6

896.5

956.5

1,020.5

3,929.3

8,294.6

 

 

39


 
 

 

 

14.Number of employees

 

14.1.By tenure

Generation

Itaipu Binacional

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

948

906

878

804

6 to 10

589

633

665

780

11 to15

406

402

398

399

16 to 20

163

158

151

149

21 to 25

502

436

355

305

beyond 25

608

653

687

705

Total

3,216

3,188

3,134

3,142

 

Brazilian Margin

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

369

355

356

353

6 to 10

380

393

403

415

11 to15

125

134

125

126

16 to 20

161

158

151

149

21 to 25

108

85

53

51

beyond 25

262

289

289

283

Total

1,405

1,414

1,377

1,377

 

Paraguayan Margin

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

579

551

522

451

6 to 10

209

240

262

365

11 to15

281

268

273

273

16 to 20

02

-

-

-

21 to 25

394

351

302

254

beyond 25

346

364

398

422

Total

1,811

1,774

1,757

1,765

 

14.2.By region

 

Itaipu Binacional

State

Number of employees

1Q14

2Q14

3Q14

4Q14

Usina Hidrelétrica de Itaipu*

2,162

2,138

2,115

2,082

Paraná – Brasil

313

311

301

315

São Paulo – Brasil

01

01

01

01

Brasília – Brasil

03

03

03

03

Paraguai

737

735

714

741

Total

3,216

3,188

3,134

3,142

*Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay.

 

40


 
 

 

 

Brazilian Margin

State

Number of employees

1Q14

2Q14

3Q14

4Q14

Usina Hidrelétrica de Itaipu*

1,100

1,111

1,084

1,072

Paraná – Brasil

301

299

289

301

São Paulo – Brasil

01

01

01

01

Brasília – Brasil

03

03

03

03

Paraguai

-

-

-

-

Total

1,405

1,414

1,377

1,377

*Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay.

 

Paraguayan Margin

State

Number of employees

1Q14

2Q14

3Q14

4Q14

Usina Hidrelétrica de Itaipu*

1,062

1,027

1,031

1,010

Paraná – Brasil

12

12

12

14

São Paulo – Brasil

-

-

-

-

Brasília – Brasil

-

-

-

-

Paraguai

737

735

714

741

Total

1,811

1,774

1,757

1,765

*Located in Foz do Iguaçu-Paraná-Brasil and Hernandárias-Alto Paraná-Paraguay.

14.3.By departments

Itaipu Binacional

Department

Number of employees

1Q14

2Q14

3Q14

4Q14

Field

747

727

715

690

Administrative

2,469

2,461

2,419

2,452

 

Brazilian Margin

Department

Number of employees

1Q14

2Q14

3Q14

4Q14

Field

380

377

375

374

Administrative

1,025

1,037

1,002

1,003

 

Paraguayan Margin

Department

Number of employees

1Q14

2Q14

3Q14

4Q14

Field

367

350

340

316

Administrative

1,444

1,424

1,417

1,449

 

15.Complementary work force – N/A

 

16.Turn-over - %

 

Itaipu Binacional

1Q14

2Q14

3Q14

4Q14

1.09

0.47

1.47

0.84

 

 

 

41


 
 

 

 

Brazilian Margin

1Q14

2Q14

3Q14

4Q14

1.12

0.64

1.44

0.80

 

Paraguayan Margin

1Q14

2Q14

3Q14

4Q14

1.13

1.24

1.50

2.02

 

42


 
 

 
 

Balance Sheet

(R$ thousand)

 

Assets

 

12.31.14

12.31.13

Current Assets

   

Availabilities

1,692

6,696

Clients (Consumers and resellers)

623,284

607,331

Loans and financing

3,138

3,353

Marketable Securities

667,750

715,812

Dividends to receive (Remuneration of equity participation)

113,186

82,536

Fiscal Assets deferred (Taxes and contributions)

7,770

19,338

Income Tax and Social Contribution

226,432

98,747

Reimbursement Rights – CCC (12,111 law)

238,381

263,127

Linked deposits

-

15,339

Stored materials

22,789

21,454

Financial Asset

-

-

Receivables - 12,783/13 Law

1,344,476

1,499,440

Others

199,168

97,495

Current Assets Total

3,448,066

3,430,668

.

   

Non-Current Assets

   

Clients (Consumers and resellers)

422,182

313,493

Loans and financing

3,095

6,152

Marketable Securities

-

-

Fiscal Assets deferred (Taxes and contributions)

-

-33,823

Income Tax and Social Contribution

-

491,732

Reimbursement Rights – CCC (12,111 law)

19,916

246,976

Linked deposits

477,926

503,057

Financial Asset

7,529,487

6,389,473

Receivables - 12,783/13 Law

-

630,912

Others

177,797

261,280

Advances for equity participation

18,075

-

 

8,648,478

8,809,252

INVESTMENTS

5,344,317

4,879,505

FIXED ASSETS

5,924,242

5,908,998

INTANGIBLE

107,581

111,388

Non-Current Assets Total

20,024,618

19,709,143

Assets Total

23,472,684

23,139,811

 

 

43


 
 

 

 

 

Liabilities and Stockholders’ Equity

 

12.31.14

12.31.13

Current Liabilities

   

Suppliers

750,285

411,869

Loans and financing

507,770

431,464

Taxes and social contribution

299,803

282,854

Income Tax and Social Contribution

5,002

5,002

Derivatives

-

-

Estimated obligations

134,871

286,273

Advances from consumers

-

-

Shareholders remuneration (dividends payable)

-

-

Provisions for contingencies

-

-

Post-employment benefit (complementary Pension Fund)

77,341

72,945

Leasing

-

-

Onerous Contracts

-

-

Concessions to pay - UBP

1,561

1,590

Sectorial charges (regulatory taxes)

138,094

128,265

Incentive to personnel retirement

-

-

Others

121,918

154,511

Current Liabilities Total

2,036,645

1,774,773

 

   

Non-Current Liabilities

   

Suppliers

-

-

Loans and financing - Principal

8,419,890

7,514,980

Taxes and social contribution

689,875

739,705

Income Tax and Social Contribution

-

-

Derivatives

-

-

Advances from consumers (energy sell in advance)

-

-

Estimated Obligations

61,653

20,454

Provisions for contingencies

509,291

555,309

Provision for onerous contract

969,935

1,001,219

Post-employment benefit (Complementary Pension Fund)

242,276

206,612

Concessions to pay - UBP

35,877

38,090

Sectorial charges (regulatory taxes)

95,147

76,601

Advance for future Capital Increase

38,530

34,740

Others

1

1

Non-Current Liabilities Total

11,062,475

10,187,711

 

   

Stockholders’ Equity

   

Social Capital

6,531,154

6,531,154

Capital reserves

5,528,986

5,528,986

Profit reserves

-

-

Additional dividends proposed

-

-

Accrued profit/losses

-405,654

-

Other comprehensive income

-1,280,922

-882,813

Non-controlling participation

-

-

 

   

Stockholders’ Equity Total

10,373,564

11,177,327

 

   

Non-Current Liabilities and Stockholders’ Equity Total

23,472,684

23,139,811

 

 

44

 
                                                                                                                 

 
 

 

 

Statement of Income by Activity

(R$ thousand)

 

   

12.31.14

12.31.13

Operating Revenue

 

 

Generation

   

Plant Supply

3,705,696

2,325,823

Energy Supply

14,896

75,809

Short term electric Energy (CCEE)

856,977

467,819

O&M Revenue of Renewed Plants

560,947

543,127

Construction Revenue

90,602

103,967

Return on Investment - G

-

-

 

   

Transmission

   

O&M Renewed Transmission Lines Revenue

0

712,288

O&M Revenue

856,738

14,591

Construction Revenue – Transmission

578,910

478,106

Return on Investment - T

212,283

172,204

Other Operating Revenue

181,291

75,621

 

   

Deductions to Operating Revenue

-742,295

-671,187

Net Operating Revenue

6,316,045

4,298,168

 

   

Operating Costs

   

Electric Energy purchased for resale

-1,519,260

-673,974

Charges on the use of electric grid

-423,634

-400,711

Fuel for production of electric Energy - CCC

-492,843

-278,997

Construction costs

-669,512

-582,073

.

   

Operating Expenses

   

Personnel, Material and Third-part related Service

-1,856,629

-2,151,721

Remuneration and reimbursement

-133,542

-164,000

Depreciation and amortization

-222,476

-185,816

Donations and Contributions

-27,436

-24,760

Provisions

555,206

101,115

Others

-181,056

-67,500

Operating Costs and Expenses

-4,971,182

-4,428,437

 

   

Result of equity participation

-887,111

151,780

Operating Result before Financial Result

457,752

21,511

 

   

Financial Result

-457,996

-524,079

Result before Income Tax / Social Contribution

-244

-502,568

 

   

Current Income Tax and and social contribution

-

-40,206

Deferred Income Tax and and social contribution

-405,410

-111,683

Net income for the period

-405,654

-654,457

 

 

 

45


 
 

 

 

Cash Flow

(R$ thousand)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Profit/Loss before income tax and social contribution

-244

-665,621

Depreciation and amortization

222,476

185,816

Net monetary and currency variations

139,876

81,246

Financial charges

819,278

524,555

Equity Equivalency Result

887,111

-151,780

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

34,893

24,734

Provision for contingencies

-46,018

-309,869

Provision for staff realignment

-11,848

222,043

Impairment – Provision for reduction of recoverable amount of asset (impairment)

-47,224

32,067

Provision for Onerous Contract

-31,284

-488,996

Provision for loss on financial asset

-496,195

496,195

Global reversal reserve charges

285,055

317,207

Adjustment to present value / market value

0

0

Minority Participation in the Results

0

0

Charges on shareholders funds

0

0

Financing assets Revenue - IRR

-212,283

-172,204

Derivative financial instruments

0

0

Others

-563,225

-467,148

Variation in operating assets / liabilities

331,971

464,313

Cash generated in operating activities

1,312,339

92,558

 

   

Financial charges paid

-754,836

-591,928

Payment of global reversal reserve charges

-306,623

-421,348

Financial charges received

857

5,834

Remuneration received from equity participation

62,566

156,933

Financial asset revenue by RAP

237,976

198,460

Receiving compensation for financial asset

1,154,767

1,914,774

Payment of income tax and social contribution

-275,639

-45,407

Payment of pension fund

0

0

Lawsuits payment

0

0

Legal deposits

54,002

-49,800

Net cash operating activities

1,485,409

1,260,076

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

1,178,401

1,609,368

Loans and financing payable – principal

-363,116

-534,909

Payment of Shareholders remuneration

0

0

Payment on refinancing of taxes and contributions - Principal

-64,232

-63,654

Receipt of Advance for future Capital Increase

0

0

Others

0

0

Net financing activities

751,053

1,010,805

 

   

INVESTMENT ACTIVITIES

   

Concession of Loans and Financing

0

0

Acquisition of fixed asset

-174,386

-361,020

Acquisition of intangible asset

-15,897

-34,182

Acquisition of Concession asset

-669,513

-582,073

Advance for future capital increase

0

0

Acquisition of equity participation

-1,505,928

-1,125,631

Others

124,258

-163,741

Net cash investment activities

-2,241,466

-2,266,647

 

   

Increase (decrease) in cash and cash equivalent

-5,004

4,234

 

   

Cash and cash equivalent – beginning of period – 12/31/13

6,696

2,462

Cash and cash equivalent – end of period – 12/31/14

1,692

6,696

 

-5,004

4,234

 

46


 
 

 

 

Analysis of the result

 

4Q14 x 3Q14

 

The Company presented a net profit in 4Q14 84.3 %, higher than the registered in the previous quarter, from a net loss of R$ 728.1 million in 3Q14 , for a net loss of R$ 114 million in 4Q14, mainly due to factors described below .

 

Operating Revenue

 

In generation:

 

The electric energy supply decreased by 2.5%, from R$ 1,132.4 million in 3Q14 , to R$ 1,104.1 million in 4Q14 , mainly due to the reduction in the auction of energy supply in the amount of R$ 93 million.

 

The operating revenue and maintenance of renewable power plants increased by 4.3%, from R$ 139.2 million in 3Q14 to R$ 145.2 million in 4Q14 , mainly due to the increase in Generation Annual Revenue (RAG) in the 4Q14 .

 

In transmission:

 

The revenues from transmission system (operation and maintenance) decreased by 4% , from R$ 240.9 million in 3Q14 to R$ 231.4 million in 4Q14 , mainly due to lower O&M revenues with 062.2001 contract ( R$ 9.2 million ) and in the other contracts ( R$ 0.3 million ).

 

 

The others operating income increased by 716.6 % , from R$ 18 million in 3Q14 to R$ 146.9 million in 4Q14 , mainly due to adjustment by actuarial gain , related to post-employment benefits.

 

Operating Expense

 

The electric energy purchased for resale increased by 26.2% from R$ 520.7 million in 3Q14 to R$ 657 million in 4Q14, mainly due to increased energy purchases due to the reflection of the negative determination in CCEE settlement resulting from exposure in the energy market, as of June 2014.

 

The personnel expenses, materials and third-part related services increased by 40.2% from R$ 429.1 million in 3Q14 to R$ 601.7 million in 4Q14, mainly due to increased personnel expenses in 4Q14 in function of 13th salary and vacation period the amount of R$ 66 million and third-part related services R$ 19 million.

 

The operational provisions decreased by 1,244.5%, from a provision of R$ 54.6 million in 3Q14, to a reversal of R$ 624.8 million in 4Q14, mainly due to the reversal of provision for loss on the financial asset R$ 496.2 million based on Normative Resolution ANEEL 643/14.

 

Financial Result

 

The debt charges increased by 14.2%, from R$ 179.8 million in 3Q14 to R$ 205.3 million in 4Q14, mainly due to the increased level of debt, related to a loan agreement with Eletrobras .

 

The others financial expenses increased by 103.7%, from R$ 19.3 million in 3Q14 to R$ 39.3 million in 4Q14, mainly due to IOF on loans and late payment fines.

 

The remuneration of the claims of 12,783/13 Law decreased by 51%, from R$ 152.9 million in 3Q14 to R$ 74.9 million in 4Q14, mainly due to the update relating to Interest and Monetary Variation.

 

Equity Participation

 

The result of investments on equity participations increased by 66.42%, from a gain of R$ 234.1 million in 3Q14 to a loss of R$ 697.2 million in 4Q14, mainly due to an increase in income of Furnas equivalence on their investments in SPSs.

 

 

 

 

47


 
 

 

 

Market Data

 

1.Generation Assets and Energy generated

1.1.Own assets

Unit

Installed Capacity

(MW)

Guaranteed Energy

(MW Average)

Energy Generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

HPU Furnas

1,216

598

1,294,259

210,867

384,912

639,650

2,529,688

HPU Luis Carlos Barreto (Estreito)

1,050

495

1,058,550

232,215

423,621

678,096

2,392,481

HPU Mascarenhas de Moraes

476

295

674,710

146,381

262,850

384,236

1,468,177

HPU Porto Colômbia

320

185

474,488

153,527

208,404

322,530

1,158,948

HPU Marimbondo

1,440

726

1,381,554

379,294

425,447

655,364

2,841,659

HPU Itumbiara

2,082

1,015

1,868,252

1,030,043

1,638,817

1,541,949

6,079,061

HPU Funil

216

121

196,127

217,655

151,422

116,070

681,275

HPU Corumbá I

375

209

528,348

601,538

384,947

340,656

1,855,488

HPU Simplício

306

192

234,156

721,343

37,071

29,868

473,062

HPU Batalha

52.50

48.8

-

62,858

66,409

48,117

177,384

HPU Serra da Mesa (48.46%)(1)

1,275

671

423,723

244,889

781,664

768,013

2,218,289

HPU Manso (70%) (1)

212

92

177,118

115,069

97,586

141,488

531,261

TPU Santa Cruz (2)

500

401.2

550,325

721,343

723,368

719,843

2,714,880

TPU Roberto Silveira (Campos)

30

21

-

3,004

-

9,387

12,391

HPU Neblina (3)

6,468

4.66

8,513

3,421

353

364

12,650

HPU Sinceridade (3)

1,416

0.37

724

683

687

348

2,442

HPU Dona Rita (3)

2.41

1.03

-

-

-

-

-

(1)Includes only the Furnas percentage. For the other assets corresponds to the energy generated total plant.
(2) The power of 500 MW excludes GU 3 and 4, whose commercial Operation is briefly suspended by Aneel, as Order No 3263 of 19 October 2012. It includes, however, the power of 150 MW not available due the delay in the plant expansion works at the end of which the GU 11 and 21 will operate in combined cycle with the GU 1 and 2. the assured (assured energy) of 401.2 MW is on the installed capacity of 500 MW.
(3) Disregarding the total consolidated installed capacity of  Eletrobras.

HPU refers to Hydroelectric Power Unit; TPU refers to Thermal Power Unit and WPU refers to Wind Power Unit.

 

 

Unit

Location

(State)

Beginning of Operation

End of Operation

Furnas

MG

03/1963

12/2042

Luis Carlos Barreto (Estreito)

SP/MG

01/1969

12/2042

Mascarenhas de Moraes

MG

04/1973

10/2023

Porto Colômbia

MG/SP

03/1973

12/2042

Marimbondo

SP/MG

04/1975

12/2042

Itumbiara

GO/MG

02/1980

02/2020

Funil

RJ

04/1969

12/2042

Corumbá I

GO

04/1997

12/2042

Simplício

RJ

06/2013

08/2041

Batalha

MG

05/2014

08/2041

Serra da Mesa

GO

04/1998

11/2038

Manso

MT

10/2000

02/2035

Santa Cruz

RJ

03/1967

12/2042

Roberto Silveira (Campos)

RJ

04/1977

07/2027

Neblina

MG

04/2013

(*)

Sinceridade

MG

04/2013

(*)

Dona Rita

MG

06/2013

(*)

(*)Under the responsibility of Furnas to completion of new bidding for grant of power plants.

 

48


 
 

 

 

 

 

1.2  SPE

 

SPE

Unit

Installed

Capacity

(MW)

Guaranteed Energy(MW Average)

Energy generated(MWh)

1Q14

2Q14

3Q14

4Q14

2014

Enerpeixe S.A.

HPU Peixe Angical

452

271

706,489

478,951

526,256

602,151

2.313.847

Baguari Geração de Energia S.A.

HPU Baguari

140

80

172,420

43,063

27,345

40,157

282.985

Retiro Baixo Energética S.A.

HPU Retiro Baixo

82

39

41,249

14,391

-

24,384

80.024

Foz de Chapecó Energia S.A.

HPU Foz de Chapecó

855

432

1,032,087

1,372,496

1,481,099

1,381,296

5.266.978

Serra do Facão Energia S.A.

HPU Serra do Facão

212.6

182

185,079

255,787

236,398

195,016

872.280

Madeira Energia S.A.

HPU Santo Antônio(*)

3,568.3

2,424.2

1,004,796

1,112,794

2,646,626

2,945,230

7.709.446

Brasventos Miassaba 3 Geradora de Energia S.A

WPU Miassaba 3

68.47

25.6

43,316

30,074

59,361

61,045

193.796

Brasventos Eolo Geradora de Energia S.A.

WPU Rei dos Ventos 1

58.45

21.6

22,572

23,435

46,517

51,252

174.299

Rei dos Ventos 3 Geradora de Energia S.A.

WPU Rei dos Ventos 3

60.12

21

37,238

30,122

55,427

51,512

143.776

Tijoá Participações e Investimentos S.A.

HPU Três Irmãos

807.5

217.5

N/A

N/A

N/A

N/A

N/A

(*) 32 units under Operation up to 4Q14, totalling 2,286.08 MW.

n/a = not available.

 

 

Unit

Share

(%)

Location

(State)

Beginning of Operation

End of Operation

HPU Peixe Angical

40.0

TO

06/2006

11/2036

HPU Baguari

15.0

MG

09/2009

08/2041

HPU Retiro Baixo

49.0

MG

03/2010

08/2041

HPU Foz de Chapecó

40.0

RS/SC

10/2010

11/2036

HPU Serra do Facão

49.5

GO

07/2010

11/2036

HPU Santo Antônio

39.0

RO

03/2012

06/2043

Wind Plant Miassaba 3

24.5

RN

02/2014

08/2045

Wind Plant Rei dos Ventos 1

24.5

RN

02/2014

12/2045

Wind Plant Rei dos Ventos 3

24.5

RN

02/2014

12/2045

HPU Três Irmãos (*)

49.9

SP

09/2014

09/2044

           

(*) The grant of HPP Three Brothers, owned by CESP and won in November 2011, was not renewed under the terms of Law No. 12,783 / 2013. In Auction No. 002/2014 - ANEEL, which occurred on March 28, 2014, the consortium Furnas (49.9%) and FIP Constantinople (50.1%) was crowned winner in the race for a Concession of UHE Three Brothers, on the proposal of hiring of electricity generation service, at the lowest cost of generation Assets Management (GAG), including operating costs, maintenance, administration, compensation and amortization of the hydroelectric plant, where appropriate, under what scheme in art. 8 of Law No. 12,783, of January 11, 2013 for a period of thirty (30) years from the effective date of the Concession Agreement, which was signed on September 10, 2014.

49


 
 

 

 

 

2.Electric energy purchased for resale 

 

2.1.Own assets

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Others

MWh

803,482

761,971

908,429

858,413

3,332,295

R$ Million

138.10

119.31

208.74

181.32

647.48

Total

MWh

803,482

761,971

908,429

858,413

3,332,295

R$ Million

138.10

119.31

208.74

181.32

647.48

 

2.2.SPE

 

UHE Foz de Chapecó

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Others

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Total

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

 

UHE Santo Antônio

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Others

MWh

1,457,019.23

876,556.89

769,707.50

845,076.76

3,948,360.38

R$ Million

343.42

363.48

199.89

154.01

1,060.80

Total

MWh

1,457,019.23

876,556.89

769,707.50

845,076.76

3,948,360.38

R$ Million

343.42

363.48

199.89

154.01

1,060.80

 

UHE Peixe Angical

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Others

MWh

17,890.00

15,840.00

52,656.00

230,729.92

317.115,92

R$ Million

14.28

6.02

34.19

52.21

106,70

Total

MWh

17,890.00

15,840.00

52,656.00

230,729.92

317.115,92

R$ Million

14.28

6.02

34.19

52.21

106,70

 

UHE Retiro Baixo

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Others

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

Total

MWh

-

-

-

-

-

R$ Million

-

-

-

-

-

 

50


 
 

 

 

UHE Baguari (*)

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

267

586

675

-

1,528

R$ Million

0.07

0.08

0.16

-

0.31

Others

MWh

13,368

29,301

33,760

-

76,429

R$ Million

3.67

4.03

8.21

-

15.91

Total

MWh

13,635

29,887

34,435

-

77,957

R$ Million

3.74

4.11

8.37

-

16.22

(*) There was expenditures on purchase of energy in the CCEE (Free Market) in 2014 only because of the application of GSF and FID (MRA) which reduced the physical guarantee in months, and not for resale.

 

3.Energy sold

 

3.1.Own assets

 

3.1.1. Energy sold by the enterprises not affected by 12,783 Law (not from quotas)

                                          

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

19.44

128,018

27.29

149,710

29.71

161,398

32.20

180,853

108.64

619,979

B

17.29

108,050

17.47

109,200

17.66

110,400

17.66

110,350

70.08

438,000

Others

A

633.08

4,014,791

875.37

4,570,165

976.32

5,049,422

968.81

5,264,246

3,453.58

18,898,624

B

3.72

26,248

3.94

27,789

3.63

25,587

3.61

25,496

14.90

105,120

Total

A

652.52

4,142,809

902.66

4,719,875

1,006.03

5,210,820

1,001.01

5,445,099

3,562.22

19,518,603

B

21.01

134,298

21.41

136,989

21.29

135,987

21.27

135,846

84.98

543,120

A –Energy sold in regulated enviroment – revenue not from quotas

B - Through free market agreements or bilateral contracts

 

3.1.2. Energy sold by the enterprises affected by 12,783 - O&M

 

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

7.22

250,334

6.45

252,999

6.78

255,779

6.78

255,662

27.23

1,014,774

B

-

-

-

-

-

-

-

-

-

-

Others

A

138.82

4,806,535

124.11

4,857,692

131.73

4,911,074

140.25

4,908,806

534.91

 

19,484,107

B

-

-

-

-

-

-

-

-

-

-

Total

A

146.04

5,056,869

130.56

5,110,691

138.51

5,166,853

147.03

5,164,468

562.14

20,498,881

B

-

-

-

-

-

-

-

-

-

-

A – Energy sold in regulated enviroment – revenue from quotas.

B - Through free market agreements or bilateral contracts.

 

3.2.SPE

 

UHE Peixe Angical

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Others

A

121.41

630,783

110.86

561,329

115.46

579,698

121.67

602,151

469.40

2,373,961

B

-

-

-

-

-

-

-

-

-

-

Total

A

121.41

630,783

110.86

561,329

115.46

579,698

121.67

602,151

469.40

2,373,961

B

-

-

-

-

-

-

-

-

-

-

                               

A - Through auction

B - Through free market agreements or bilateral contracts

 

51


 
 

 

 

UHE Foz do Chapecó 

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Others

A

102.89

571,046

99.58

541,444

107.62

571,216

111.88

585,134

421.97

2,268,840

B

71.61

373,248

75.63

377,395

76.74

381,542

77.41

381,542

301.39

1,513,727

Total

A

102.89

571,046

99.58

541,444

107.62

571,216

111.88

585,134

421.97

2,268,840

B

71.61

373,248

75.63

377,395

76.74

381,542

77.41

381,542

301.39

1,513,727

                               

A - Through auction

B - Through free market agreements or bilateral contracts

 

UHE Santo Antônio

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

6,048

56.359

7,296

67.986

8,784

79.855

10,41

91.040(*)

32,538

295.420

B

-

-

-

-

-

-

-

-

-

-

Others

A

172,599

1.614.463

212,297

1.947.545

255,948

2.287.540

295,88

2.607.924

936,724

8.457.472

B

394,86

2.648.716

434,645

2.877.961

455,273

2.798.095

538,59

2.924.282

1.823,368

11.249.054

Total

A

178,65

1.670.822

219,59

2.015.531

264,73

2.367.395

306,29

2.698.964

969,26

8.752.892

B

394,86

2.648.716

434,65

2.877.961

455,27

2.798.095

538,59

2.924.282

1.823,37

11.249.054

                             

A - Through auction

B - Through free market agreements or bilateral contracts

(*) Cepisa e Ceal.

 

UHE Serra do Facão

 

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Others

A

50.72

279,117

45.83

248,342

48.96

261,157

51.37

271,344

196.88

1,059,960

B

20.03

110,211

25.37

137,477

26.06

138,988

26.30

138,925

97.76

525,601

Total

A

50.72

279,117

45.83

248,342

48.96

261,157

51.37

271,344

196.88

1,059,960

B

20.03

110,211

25.37

137,477

26.06

138,988

26.30

138,925

97.76

525,601

                             

A - Through auction

B - Through free market agreements or bilateral contracts

 

UHE Retiro Baixo

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Others

A

13.98

83,020,001

12.7

73,831,859

14.41

81,814,000

14.4

80,522,000

55.49

319,187,860

B

0.38

2,161,000

0.4

2,184,000

0.39

2,208,000

0.4

2,207,000

1.57

8,760,000

Total

A

13.98

83,020,001

12.7

73,831,859

14.41

81,814,000

14.4

80,522,000

55.49

319,187,860

B

0.38

2,161,000

0.4

2,184,000

0.39

2,208,000

0.4

2,207,000

1.57

8,760,000

                             

A - Through auction

B - Through free market agreements or bilateral contracts

 

52


 
 

 

 

UHE Baguari

 

Buyer

Sales model

1Q14

2Q14

3Q14

4Q14

2014

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

R$ Million

MWh

Eletrobras System

A

0.250

1,479

0.253

1,493

0.276

1,589

0.317

1,756

1.096

6,317

B

-

-

-

-

 

-

-

-

Others

A

14.229

84,226

13.210

76,637

14.033

79,445

15.032

83,889

56.504

324,197

B

-

-

-

-

 

-

-

-

-

-

Total

A

14.479

85,705

13.463

78,130

14.309

81,034

15.349

85,645

57.600

330,514

B

-

-

-

-

-

-

-

-

-

-

A - Through auction

B - Through free market agreements or bilateral contracts

* ED Piauí e ED Alagoas.

 

4.CCEE settlement (Spot and MRE)

 

 

Unit

1Q14

2Q14

3Q14

4Q14(*)

2014

Sold

R$ Million

541.87

318.04

-

-

859.91

MWh

-

-

-

-

-

MWaverage

-

-

-

-

-

Purchased

R$ Million

-

128.90

332.87

474.63

936.40

MWh

-

-

-

-

-

MWaverage

-

-

-

-

-

Net

R$ Million

541.87

189.14

-332.87

-474.63

-76.49

MWh

-

-

-

-

-

MWaverage

-

-

-

-

-

Note: The result of the settlement in the CCEE is published in R $ million , comprising various components, and already includes values ​​of SRM.

(*) Settlement of December / 2014 , considering the value contributed Physical Guarantee ( undisclosed accounting ) .

 

 

5.Fuel used to produce electricity

 

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Special Diesel oil

litre

-

-

-

-

-

-

-

-

-

-

Fuel oil Type B1

Ton

-

-

-

-

-

-

-

-

-

-

Common Diesel oil

Litre

-

-

-

-

-

-

-

-

-

-

Gas

m3

273,018,526

103.11

419,695,402

193.59

430,455,358

135.96

417,418,708

134.26

1,540,587,994

566.93

Total

273,018,526

103.11

419,695,402

193.59

430,455,358

135.96

417,418,708

134.26

1,540,587,994

566.93

                       

                                                                                                                                                             

6.Losses in generation - %

 

1Q14

2Q14

3Q14

4Q14

2014

1.05

1.05

1.05

1.05

1.05

 

7.Average price– R$/MWh

7.1.Own assets – enterprises not affected by 12,783 law

1Q14

2Q14

3Q14

4Q14

2014

157.55

190.26

192.14

183.17

181.80

 

7.1.1 Own assets – enterprises renewed in accordance with the 12,783 Law – O&M

 

1Q14

2Q14

3Q14

4Q14

2014

28.88

25.55

17.92

28.47

27.42

 

53


 
 

 

 

 

7.2.SPE

 

SPE

1Q14

2Q14

3Q14

4Q14

2014

Enerpeixe S.A.

191.07

194.90

200.59

202.47

197.26

Retiro Baixo Energética S.A.

168.59

172.15

176.16

178.62

173.88

Baguari S.A.

169.19

172.32

176.59

179.22

174.33

Foz de Chapecó Energia S.A.

184.95

191.55

193.50

195.81

191.45

Serra do Facão Energia S.A.

181.74

184.56

187.46

189.32

185.77

Madeira Energia S.A.

134.27

133.71

139.39

150.25

197.26

 

8.Extension of transmission lines - Km

 

8.1.Own assets

8.1.1.Transmission line

8.1.1.1. Transmission line– enterprises not affected by 12,783 Law

From - To

Extension

(km)

Tension

(kV)

Operation

End of

Concession

Ibiúna - Bateias Circuito 1

332.0

500

Mar/03

May/2031

Ibiúna - Bateias Circuito 2

332.0

500

Mar/03

Mai/2031

Tijuco Preto - Itapeti 3

21.0

345

Jan/13

Apr/2036

Tijuco Preto - Itapeti 4

21.0

345

Jan/13

Apr/2036

Itapeti - Nordeste

29.0

345

Dec/14

Apr/2036

Campos - Macaé 3

90.0

345

Jun/10

Mar/2035

Batalha – Paracatu

85.0

138

Sep/13

Aug/2041

Simplício - Rocha Leão 1

119.0

138

Jan/13

Aug/2041

Simplício - Rocha Leão 2

119.0

138

Jan/13

Aug/2041

Basic Network Total

 

 

 

 

Total

1,148.0

 

 

 

 

8.1.1.2. Transmission line– enterprises renewed in accordance with 12,783  - O&M  

 

From - To

Extension

(km)

Tension

(kV)

Operation

End of

Concession

Foz do Iguaçu - Ivaiporã 1

322.0

765

Aug/89

Dec/42

Foz do Iguaçu - Ivaiporã 2

323.0

765

Dec/86

Dec/42

Foz do Iguaçu - Ivaiporã 3

331.0

765

Mar/99

Dec/42

Itaberá - Ivaiporã 1

265.0

765

Aug/89

Dec/42

Itaberá - Ivaiporã 2

264.0

765

Oct/82

Dec/42

Itaberá - Ivaiporã 3

272.0

765

May/00

Dec/42

Itaberá - Tijuco Preto 1

305.0

765

Jul/89

Dec/42

Itaberá - Tijuco Preto 2

304.0

765

Oct/82

Dec/42

Itaberá - Tijuco Preto 3

312.0

765

May/01

Dec/42

Subtotal 765 kV

2,698.0

 

 

 

Foz do Iguaçu - Ibiúna Bipolo 1

792.0

600

Mar/85

Dec/42

Foz do Iguaçu - Ibiúna Bipolo 2

820.0

600

Aug/87

Dec/42

Subtotal 600 kV

1,612.0

 

 

 

Adrianópolis - Baixada Fluminense

19.0

500

Nov/13

Dec/42

Adrianópolis - Cachoeira Paulista 1

171.0

500

Feb/74

Dec/42

Adrianópolis – Grajaú

55.0

500

Dec/77

Dec/42

Adrianópolis – Resende

115.0

500

Dec/79

Dec/42

Adrianópolis - São José

33.0

500

Aug/91

Dec/42

Angra - Cachoeira Paulista

103.0

500

Jun/77

Dec/42

Angra - São José

133.0

500

Dec/98

Dec/42

Angra - Zona Oeste

97.5

500

Mar/11

Dec/42

Araraquara – Campinas

171.0

500

Jul/76

Dec/42

Araraquara - Poços de Caldas

176.0

500

Apr/76

Dec/42

 

54


 
 

 

 

 

From - To

Extension

(km)

Tension

(kV)

Operation

End of

Concession

Baixada Fluminense - Cachoeira Paulista

160.5

500

Nov/13

Dec/42

Cachoeira Paulista - Campinas

223.0

500

Sep/77

Dec/42

Cachoeira Paulista - Itajubá

53.0

500

Jul/02

Dec/42

Cachoeira Paulista - Resende

56.0

500

Dec/79

Dec/42

Cachoeira Paulista - Taubaté

83.0

500

Jun/83

Dec/42

Cachoeira Paulista - Tijuco Preto

181.0

500

Nov/88

Dec/42

Campinas - Itatiba 1

26.5

500

Mar/03

Dec/42

Grajaú - Zona Oeste

79.0

500

Mar/11

Dec/42

Gurupi – Miracema

255.0

500

Mar/99

Dec/42

Ibiúna - Itatiba 1

86.5

500

Mar/03

Dec/42

Itumbiara - São Simão

166.0

500

Jan/79

Dec/42

Marimbondo - Água Vermelha

172.0

500

Aug/79

Dec/42

Marimbondo - Araraquara 1

195.0

500

Apr/76

Dec/42

Marimbondo - Araraquara 2

194.0

500

Aug/76

Dec/42

Poços de Caldas – Itajubá

139.0

500

Jul/02

Dec/42

Serra da Mesa – Gurupi

256.0

500

Mar/99

Dec/42

Serra da Mesa - Samambaia 1

249.0

500

Mar/98

Dec/42

Serra da Mesa - Samambaia 2

248.5

500

Jan/99

Dec/42

Tijuco Preto - Taubaté

108.5

500

Mar/84

Dec/42

Subtotal 500 kV

4,005.0

 

 

 

Adrianópolis - Itutinga 1

199.0

345

Mar/68

Dec/42

Adrianópolis - Itutinga 2

199.0

345

Aug/70

Dec/42

Adrianópolis - Jacarepaguá 1

38.0

345

Mar/68

Dec/42

Adrianópolis - Jacarepaguá 2

38.0

345

Aug/70

Dec/42

Adrianópolis - Macaé

177.0

345

Sep/02

Dec/42

Adrianópolis - Venda das Pedras

107.0

345

Nov/10

Dec/42

Bandeirantes - Samambaia 1

157.0

345

Feb/99

Dec/42

Bandeirantes - Samambaia 2

155.0

345

Feb/99

Dec/42

Barro Branco - Ouro Preto

59.0

345

Oct/13

Dec/42

Barro Branco - Padre Fialho

104.5

345

Oct/13

Dec/42

Campinas - Guarulhos

88.0

345

Feb/03

Dec/42

Campinas - Poços de Caldas

126.0

345

Oct/72

Dec/42

Campos - Macaé 1

89.0

345

Nov/01

Dec/42

Campos - Macaé 2

89.0

345

Sep/02

Dec/42

Campos – Viana

199.0

345

Dec/05

Dec/42

Campos – Vitória

224.0

345

Oct/77

Dec/42

Corumbá - Brasília Sul

254.0

345

Mar/97

Dec/42

Corumbá – Itumbiara

79.0

345

Mar/97

Dec/42

Furnas - Estreito

112.0

345

Feb/70

Dec/42

Furnas - Itutinga 1

198.0

345

Mar/68

Dec/42

Furnas - Itutinga 2

199.0

345

Dec/69

Dec/42

Furnas - Mascarenhas de Moraes

104.0

345

May/68

Dec/42

Furnas – Pimenta

66.0

345

Mar/67

Dec/42

Furnas - Poços de Caldas 1

131.0

345

Sep/63

Dec/42

Furnas - Poços de Caldas 2

131.0

345

Apr/65

Dec/42

Guarulhos - Ibiúna 1

75.0

345

Jun/90

Dec/42

Guarulhos - Ibiúna 2

75.0

345

Jul/90

Dec/42

Guarulhos – Nordeste

35.0

345

Mar/64

Dec/42

Guarulhos - Poços de Caldas 1

182.0

345

Sep/63

Dec/42

Guarulhos - Poços de Caldas 2

184.0

345

Nov/66

Dec/42

Ibiúna - Tijuco Preto 1

97.0

345

Nov/83

Dec/42

Ibiúna - Tijuco Preto 2

97.0

345

Jul/84

Dec/42

Itumbiara - Bandeirantes 1

180.0

345

Jul/73

Dec/42

Itumbiara - Bandeirantes 2

180.0

345

Jul/77

Dec/42

Itumbiara - Porto Colômbia

201.0

345

Jun/73

Dec/42

L.C.Barreto - Estreito 1

24.0

345

Mar/69

Dec/42

L.C.Barreto - Estreito 2

24.0

345

Feb/70

Dec/42

L.C.Barreto - Poços de Caldas 1

198.0

345

Nov/69

Dec/42

L.C.Barreto - Poços de Caldas 2

197.0

345

Sep/70

Dec/42

L.C.Barreto - Volta Grande

112.0

345

Jun/73

Dec/42

Macaé - Venda das Pedras

122.0

345

Nov/10

Dec/42

Marimbondo - Porto Colômbia

77.0

345

Oct/75

Dec/42

Mascarenhas - Estreito

13.0

345

Mar/69

Dec/42

Mogi – Atibaia

64.5

345

Jan/13

Dec/42

Mogi – Nordeste

25.0

345

Mar/64

Dec/42

Pimenta – Barreiro

198.0

345

Mar/67

Dec/42

Poços de Caldas – Atibaia

142.5

345

Jan/13

Dec/42

Porto Colômbia - Volta Grande

45.0

345

Jun/73

Dec/42

Samambaia - Brasília Sul 1

12.5

345

Feb/99

Dec/42

 

55


 
 

 

 

 

From - To

Extension

(km)

Tension

(kV)

Operation

End of

Concession

Samambaia - Brasília Sul 2

15.0

345

Feb/99

Dec/42

Viana – Vitória

26.0

345

Dec/05

Dec/42

Vitória - Padre Fialho

220.5

345

Apr/13

Dec/42

Subtotal 345 kV

6,144.5

 

 

 

Barro Alto – Niquelândia

87.0

230

Oct/99

Dec/42

Brasília Geral - Brasília Sul 1

13.0

230

Oct/72

Dec/42

Brasília Geral - Brasília Sul 2

13.0

230

Sep/07

Dec/42

Barro Alto – Águas Lindas

102.0

230

Mar/14

Dec/42

Águas Lindas – Brasília Sul

30.0

230

Mar/14

Dec/42

Brasília Sul – Pirineus

107.0

230

Sep/07

Dec/42

Itumbiara - Cachoeira Dourada

44.0

230

Oct/73

Dec/42

Itumbiara - Rio Verde 1

208.0

230

Jan/86

Dec/42

Itumbiara - Rio Verde 2

202.0

230

Apr/92

Dec/42

Manso – Nobres

66.0

230

May/98

Dec/42

Pirineus – Xavantes

40.0

230

Nov/06

Dec/42

Rio Verde - Barra do Peixe 1

240.0

230

Nov/87

Dec/42

Rio Verde - Barra do Peixe 2

240.0

230

Feb/94

Dec/42

Rio Verde - Cachoeira Dourada 1

175.0

230

Dec/86

Dec/42

Rio Verde – Rondonópolis

257.0

230

Nov/82

Dec/42

Serra da Mesa - Niquelândia

105.0

230

Oct/99

Dec/42

Subtotal 230 kV

1,929.0

 

 

 

Adrianópolis - Cepel 1

1.5

138

Apr/81

Dec/42

Adrianópolis - Cepel 2

1.5

138

Apr/81

Dec/42

Adrianópolis - Magé 1

48.0

138

Apr/73

Dec/42

Adrianópolis - Magé 2

48.0

138

Jan/73

Dec/42

Alcântara - Adrianópolis 1

19.5

138

Jul/76

Dec/42

Alcântara - Adrianópolis 2

20.0

138

Dec/98

Dec/42

Alcântara - Adrianópolis 3

20.0

138

Dec/98

Dec/42

Alcântara - Imbariê - Adrianópolis

19.5

138

May/75

Dec/42

Angra - Angra (Ampla)

34.0

138

Apr/71

Dec/42

Angra - Jacuacanga

34.0

138

Oct/77

Dec/42

Angra - Santa Cruz

96.0

138

Oct/77

Dec/42

Cachoeira Paulista - Volta Redonda 1

105.0

138

Nov/86

Dec/42

Cachoeira Paulista - Volta Redonda 2

105.0

138

Jun/87

Dec/42

Campos - Cachoeiro do Itapemirim 1

106.0

138

Feb/73

Dec/42

Campos - Cachoeiro do Itapemirim 2

106.0

138

Feb/73

Dec/42

Campos – Iriri

97.0

138

Aug/73

Dec/42

Campos - Rocha Leão

110.0

138

Feb/73

Dec/42

Couto Magalhães - Parque das Emas

80.5

138

Nov/13

Dec/42

Iriri - Rocha Leão

13.0

138

Aug/73

Dec/42

Jacarepaguá - Ari Franco

10.0

138

Dec/67

Dec/42

Jacarepaguá – Cosmos

24.0

138

Dec/67

Dec/42

Jacarepaguá - Mato Alto

16.0

138

Sep/73

Dec/42

Jacarepaguá – Paciência

23.0

138

Aug/14

Dec/42

Paciência – Palmares

5.0

138

Aug/14

Dec/42

Jacarepaguá – ZIN

33.0

138

Nov/72

Dec/42

Jacuacanga - Brisamar

44.0

138

Oct/77

Dec/42

Manso – Nobres

70.0

138

Apr/98

Dec/42

Muriqui - Angra (Ampla)

36.0

138

Apr/71

Dec/42

Muriqui - Brisamar

20.0

138

Apr/71

Dec/42

Palmares - Mato Alto

13.0

138

Sep/73

Dec/42

Parque das Emas - Rio Claro

87.5

138

Nov/13

Dec/42

Rio Verde - Cachoeira Dourada 2

174.0

138

Aug/77

Dec/42

Rio Verde - Rio Claro

87.0

138

Nov/13

Dec/42

Rocha Leão - Magé 1

108.0

138

Jan/73

Dec/42

Rocha Leão - Magé 2

108.0

138

Jan/73

Dec/42

Santa Cruz - Brisamar 1

20.0

138

Oct/77

Dec/42

Santa Cruz - Brisamar 2

13.0

138

Apr/71

Dec/42

Santa Cruz - Jacarepaguá

38.0

138

Oct/72

Dec/42

Santa Cruz - Palmares 1

14.0

138

Nov/72

Dec/42

Santa Cruz - Palmares 2

14.0

138

Sep/73

Dec/42

Santa Cruz – ZIN

5.0

138

Nov/72

Dec/42

Santa Cruz - ZIN - Ari Franco

31.0

138

Dec/67

Dec/42

Santa Cruz - ZIN - Cosmos

17.0

138

Dec/67

Dec/42

São José - Imbariê 1

18.0

138

Dec/98

Dec/42

São José - Imbariê 2

18.0

138

Dec/98

Dec/42

São José - Magé 1

46.0

138

Jun/01

Dec/42

São José - Magé 2

46.0

138

Jun/01

Dec/42

TPU Campos - Campos 1

1.0

138

Jul/77

Dec/42

TPU Campos - Campos 2

1.0

138

Jul/87

Dec/42

Subtotal 138 kV

2,.205.0

 

 

 

Eletrodo de Terra - Foz do Iguaçu 1

16.0

25

Apr/85

Dec/42

Eletrodo de Terra - Foz do Iguaçu 2

15.0

25

Aug/87

Dec/42

Eletrodo de Terra - Ibiúna 1

67.0

25

Apr/85

Dec/42

Eletrodo de Terra - Ibiúna 2

67.0

25

Aug/87

Dec/42

Subtotal 25 kV

165.0

 

 

 

Basic Network Total

 

 

 

 

General Total

18,758.5

 

 

 

 

56


 
 

 

 

 

8.1.2.Substation

 

8.1.2.1. Substation – enterprises not affected by 12,783 Law

 

Substation

Transformation capacity

(MVA)

Location

Operation

End of

Operation

Zona Oeste

900,00

Rio de Janeiro/Rio de Janeiro

Dec/14

May/42

Subtotal

900,00

 

 

 

 

Substations

Associated to plants

Transformation capacity

(MVA)(*)

Location

Operation

End of

Operation

Batalha

90.00

Paracatu/Minas Gerais

Aug/06

Aug/41

Campos

185.00

Campos dos Goytacazes/Rio de Janeiro

Dec/68

Jul/27

Itumbiara

5,074.99

Araporã/Minas Gerais

Mar/73

Feb/20

Manso

312.50

Chapada dos Guimarães/Mato Grosso

Nov/00

Feb/35

Mascarenhas de Moraes

1,820.99

Ibiraci/Minas Gerais

Dec/56

Oct/23

Santa Cruz (**)

1,544.00

Rio de Janeiro/Rio de Janeiro

Jun/67

Jul/15

São Gonçalo

42.50

São Gonçalo/Rio de Janeiro

Jul/77

(***)

Serra da Mesa

2,693.08

Minaçu/Goiás

Mar/98

Nov/39

Simplício

497.50

Sapucaia/Rio de Janeiro

Aug/06

Aug/41

Subtotal

12,260.56

 

 

 

Total

13,160.56

 

 

 

(*) Total Transformation Capacity (MVA Total) = operating capacity + capacity + capacity in reserve review.

(**) Affected but not yet extended.

(***) Extension denied.

 

 

8.1.2.2. Substation– enterprises renewed in accordance with 12,783  - O&M

 

Substation

Transformation capacity

(MVA)

Location

Operation

End of

Operation

Adrianópolis

3,289.96

Nova Iguaçu/Rio de Janeiro

Nov/70

Dec/42

Angra

967.07

Angra dos Reis/Rio de Janeiro

Apr/71

Dec/42

Araraquara

-

Araraquara/São Paulo

Apr/76

Dec/42

Bandeirantes

1,433.33

Aparecida de Goiânia/Goiás

Oct/72

Dec/42

Barro Alto

149.66

Barro Alto/Goiás

Mar/82

Dec/42

Brasília Geral

300.00

Brasília/Brasília

Feb/60

Dec/42

Brasília Sul

2,094.20

Taguatinga/Brasília

Mar/73

Dec/42

Cachoeira Paulista

583.30

Cachoeira Paulista/São Paulo

Oct/76

Dec/42

Campinas

1,970.00

Campinas/São Paulo

Sep/72

Dec/42

Campos

1,283.33

Campos dos Goytacazes/Rio de Janeiro

Feb/73

Dec/42

Foz do Iguaçu

15,968.00

Foz do Iguaçu/Paraná

Dec/82

Dec/42

Grajaú

2,800.00

Rio de Janeiro/Rio de Janeiro

Dec/79

Dec/42

Guarulhos

-

São Paulo/São Paulo

Sep/63

Dec/42

Gurupi

-

Gurupi/Tocantins

Mar/99

Dec/42

Ibiúna

11,600.40

Ibiúna/São Paulo

Apr/84

Dec/42

Imbariê

-

Duque de Caxias/Rio de Janeiro

Oct/68

Dec/42

Iriri

-

Macaé/Rio de Janeiro

Oct/09

Dec/42

Itabera

-

Itaberá/São Paulo

Sep/82

Dec/42

Itutinga

-

Itutinga/Minas Gerais

Apr/67

Dec/42

Ivaiporã

11,006.00

Manoel Ribas/Paraná

Oct/82

Dec/42

Jacarepaguá

1,350.00

Rio de Janeiro/Rio de Janeiro

Dec/67

Dec/42

Macaé

-

Macaé/Rio de Janeiro

Nov/01

Dec/42

Mogi das Cruzes

1,166.66

Mogi das Cruzes/São Paulo

Mar/64

Dec/42

Niquelândia

-

Niquelândia/Goiás

Oct/99

Dec/42

Pirineus

-

Anápolis/Goiás

Nov/06

Dec/42

Poços de Caldas

1,846.66

Poços de Caldas/Minas Gerais

Sep/63

Dec/42

Resende

-

Resende/Rio de Janeiro

Apr/09

Dec/42

Rio Verde

333.33

Rio Verde/Goiás

Dec/75

Dec/42

Rocha Leão

-

Rio das Ostras/Rio de Janeiro

Dec/72

Dec/42

Samambaia

4,250.00

Brasília/Distrito Federal

Mar/98

Dec/42

São José

2,600.00

Belfort Roxo/Rio de Janeiro

Aug/91

Dec/42

Tijuco Preto

17,014.70

Mogi das Cruzes/São Paulo

Sep/82

Dec/42

Viana

750.00

Viana/Espirito Santo

Dec/05

Dec/42

Vitória

1,044.20

Serra/Espirito Santo

Nov/78

Dec/42

Subtotal

83,800.80

 

 

 

 

57


 
 

 

 

Substations associated to plants

Transformation capacity

(MVA)(*)

Location

Operation

End of

Operation

Corumbá

556.00

Caldas Novas/Goiás

Mar/97

Dec/42

Funil

300.00

Itatiaia/Rio de Janeiro

Dec/69

Dec/42

Furnas

1,399.17

São José da Barra/Minas Gerais

Sep/63

Dec/42

Luiz C. Barreto

1,333.32

Pedregulho/São Paulo

Mar/69

Dec/42

Marimbondo

2,393.32

Fronteira/Minas Gerais

Aug/75

Dec/42

Porto Colômbia

425.00

Planura/Minas Gerais

Jul/73

Dec/42

Subtotal

6,406.81

 

 

 

Total

90,207.61

 

 

 

(*)Total Transformation Capacity (MVA Total) = operating capacity + capacity + capacity in reserve review.

 

8.2.SPE

8.2.1. Transmission lines

SPE

Object

(From - To)

Participation

(%)

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Baguari Energia S.A.

HPU Baguari - SS Baguari

15.0

0.80

230

Feb/10

Aug/41

Baguari Energia S.A.

SS Baguari - Mesquita – Governador Valadares

15.0

2.50

230

Apr/10

Aug/41

Baguari Energia S.A.

SS Baguari – Mesquita

15.0

69.00

230

Apr/10

Aug/41

Baguari Energia S.A.

SS Baguari - Gov. Valadares

15.0

26.00

230

Apr/10

Aug/41

Centroeste de Minas

Furnas – Pimenta II

49.0

62.70

345

Mar/10

Mar/35

Chapecoense Geração S.A.

SS Foz do Chapecó – Gurita

40.0

72.60

230

Mar/11

Nov/36

Chapecoense Geração S.A.

SS Foz do Chapecó – SS Xanxerê

40.0

77.60

230

Mar/11

Nov/36

Chapecoense Geração S.A.

HPU Foz do Chapecó – SS de Foz do Chapecó

40.0

1.00

230

Mar/11

Nov/36

Enerpeixe S.A.

Peixe Angical – Peixe 2

40.0

17.00

500

Apr/06

Nov/36

Goiás Transmissão S.A.

Rio Verde Norte – Trindade

49.0

193.00

500

Dec/13

Feb/40

Goiás Transmissão S.A.

Trindade – Xavantes

49.0

37.00

230

Dec/13

Feb/40

Goiás Transmissão S.A.

Trindade – Carajás

49.0

29.00

230

Oct/13

Feb/40

MGE Transmissão S.A.

Mesquita - Viana 2

49.0

248.00

500

Jun/14

Jul/40

MGE Transmissão S.A.

Viana 2 – Viana

49.0

10.00

345

Jun/14

Jul/40

Interligação Elétrica do Madeira S.A.

Coletora Porto Velho-Araraquara II (Lot D)

24.5

2,375.00

600

Aug/13

Feb/39

Retiro Baixo Energética S.A.

HPU Retiro Baixo – SS Curvelo

49.0

45.00

138

Oct/10

Aug/41

Serra do Facão Energia S.A.

HPU Serra do Facão – SS Celg de Catalão

49.5

32.00

138

Oct/10

Nov/36

Transenergia Renovável S.A.

Barra dos Coqueiros – Quirinópolis

49.0

52.30

230

Apr/11

Apr/39

Transenergia Renovável S.A.

Quirinópolis - TPU Quirinópolis

49.0

34.40

138

May/11

Jun/25

Transenergia Renovável S.A.

Quirinópolis - TPU Boavista

49.0

16.70

138

May/11

Jun/25

Transenergia Renovável S.A.

Chapadão – Jataí

49.0

131.50

230

Dec/12

Jun/25

Transenergia Renovável S.A.

Jataí – Mineiros

49.0

61.40

138

Dec/12

Jun/25

Transenergia Renovável S.A.

Jataí - TPU Jataí

49.0

51.20

138

Dec/12

Jun/25

Transenergia Renovável S.A.

Jataí - TPU Água Emendada

49.0

32.60

138

Dec/12

Jun/25

Transenergia Renovável S.A.

Mineiros - Morro Vermelho

49.0

45.20

138

Dec/12

Jun/25

Transenergia Renovável S.A.

Morro Vermelho - TPU Morro Vermelho

49.0

31.00

138

Dec/12

Jun/25

Transenergia Renovável S.A.

Morro Vermelho - TPU Alto Taquari

49.0

30.20

138

Jun/13

Jun/25

Transenergia Renovável S.A.

Palmeiras – Edéia

49.0

57.00

230

May/13

Jun/25

Transenergia Renovável S.A.

Edéia - TPU Tropical Bionenergia I

49.0

48.70

138

May/13

Jun/25

Transirapé

Irapé – Araçuaí

24.5

65.00

230

May/07

Dec/34

Transleste

Montes Claros – Irapé

24.5

138.00

345

Dec/06

Feb/34

Transudeste

Itutinga – Juiz de Fora

25.0

140.00

345

Feb/07

Oct/34

Total

 

 

4,233.40

 

 

 

 

58


 
 

 

 

 

8.2.2 Substations

 

SPE

Substation

Transformation Capacity

(MVA)

Participation (%)

Beginning of Operation

End Operation

Baguari Energia S.A.

SS da Usina de Baguari

155.60

15.00

Aug/06

Aug/41

Caldas Novas Transmissão S.A.

Corumbá

150.00

49.90

Aug/13

Jun/41

ChapecoenSS Geração S.A

SS da Usina de Foz do Chapecó

978.00

40.00

Nov/01

Nov/36

Enerpeixe S.A.

SS da Usina de Peixe Angical

525.00

40.00

Nov/01

Nov/36

Goiás Transmissão S.A.

Trindade

400.00

49.00

Nov/13

Jul/40

Luziânia Niquelândia Transmissora S.A.

Luziânia

300.00

49.00

Jun/14

May/42

Madeira Energia S.A.

SS da Usina de Santo Antônio

3.630.00

39.00

Aug/07

Jun/43

MGE Transmissão S.A.

Viana 2

900.00

49.00

Aug/14

Jul/40

Retiro Baixo Energética S.A.

SS da Usina de Retiro Baixo

100.00

49.00

Aug/06

Aug/41

SSrra do Facão Energia S.A.

SS da Usina de SSrra do Facão

236.40

49.47

Nov/01

Nov/36

Transenergia Renovável S.A

Edéia

150.00

49.00

Feb/12

Jun/25

Transenergia Renovável S.A

Jataí

225.00

49.00

Dec/12

Jun/25

Transenergia Renovável S.A

Mineiros

-

49.00

Dec/12

Jun/25

Transenergia Renovável S.A

Morro Vermelho

-

49.00

Dec/12

Jun/25

Transenergia Renovável S.A

Quirinópolis

225.00

49.00

Apr/11

Jun/25

Transenergia São Paulo S.A

Itatiba

800.00

49.00

Aug/12

Nov/39

Interligação Elétrica do Madeira S.A.

Retifier Station nº 2 CA/CC 500/+-600 kV (Lot F)

3,150.00

24.50

May/14

Feb/39

Interligação Elétrica do Madeira S.A.

Inverter Station nº 2 CA/CC +-600 /500 kV (Lot F)

2,950.00

24.50

May/14

Feb/39

Total

 

14,875.00

 

 

 

 

9. Transmission losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

2.09

2.19

2.32

2.15

2.19

 

10. Main investments of parent company– R$ Million

 

Project

1Q14

2Q14

3Q14

4Q14

1st Revision 2014

Installation of Combined Cycle TPU Santa Cruz (RJ)/Capacity expansion of Sta. Cruz Thermal Unit (RJ)

143,573

54,772

11,526,993

7,863,222

75,000,000

Installation of HPU Batalha (Paulista) (MG/GO)

3,697,734

4,211,695

7,877,880

5,141,974

29,706,852

Installation of HPU Simplício and SHU Anta (RJ)

6,862,629

1,744,736

4,441,732

7,090,496

43,028,206

Modernization of HPU Furnas (MG)

9,987,075

9,527,466

6,915,232

17,706,533

56,816,722

Maintenance of the generation system

2,673,421

4,454,633

5,221,232

34,804,982

59,175,224

Extension of generation system

-

-

-

-

100,000

Deployment of wind farms

-

-

-

-

28,840,836

Implementation of UTE biomass

-

-

-

-

100,000

Extension of generation capacity

-

-

-

-

100,000

Transmission

 

 

 

 

 

Transmission System Bom Despacho – Ouro Preto

3,515,448

8,858,875

4,657,808

3,446,620

21,717,886

Installation of Transmission Line Tijuco Preto-Itapeti-Nordeste

5,592,902

6,690,040

4,974,090

4,690,742

21,468,376

Installation of Transmission System Mascarenhas - Linhares

2,027,209

703,035

4,524,979

9,169,094

30,294,939

Reinforcement of Transmission System

14,775,114

43,365,735

61,458,636

103,425,774

320,769,676

Transmission System maintenance

37,512,106

64,240,115

76,629,343

119,327,533

434,997,984

Extension of transmission System

6,316,239

6,483,664

6,241,398

7,677,272

45,058,633

Others

 

 

 

 

 

Maintenance of real estate

322,506

698,343

1,114,073

3,487,518

12,010,235

Maintenance of real estate, vehicles, turbines and equipment

3,234,740

10,798,654

5,264,260

23,969,839

52,139,871

Maintenance of info technology assets

2,424,953

6,039,006

4,921,490

16,147,316

40,074,923

Environmental preservation and conservation of generation and transmission

1,259,178

2,219,518

3,900,272

5,120,987

24,995,028

 TOTAL

100,344,826

170,090,288

209,669,416

369,070,338

1,296,395,391

 

59


 
 

 

Marketletter

11.New investments

 

11.1.Generation

 

11.1.1.Own assets

 

Unit

Own assets

Location

(State)

Investiment

(R$ million)

Installed capacity (MW)

Guaranteed Energy (MW)

Beginning of Operation

Beginning of Construction

End of Concession

Total

Up to 4Q14

SPU Anta

RJ/MG

2,296.60

Basis:

Dec/08

2,472(*)

28

191.3(*)

SPU Anta: Schedule Mac 1 Jan/2015 and Mac 2 Jun/2015

 

 

Mar/07

 

 

 

 

Aug/41

 

 

(*)Includes Simplicio, which is already under operation.

 

 

60


 
 

 

 

11.1.2.SPE

 

SPE

Unit

Location (State)

Instaled Capacity (MW)

Assured energy

Beginning of Operation

Beginning of Construction

End

of Concession

Cia. Hidrelétrica Teles Pires

HPU Teles Pires

MT

1,819.8

915.4

Apr/15

Aug/11

Jun/46

Madeira Energia S.A.

HPU Santo Antônio

MT

3,568.3

2,424.2

Mar/12

Aug/08

Jun/43

Empresa de Energia São Manoel S.A.

HPU São Manoel

MT/PA

700.0

421.7

May/18

Aug/14

Apr/49

Central Geradora Eólica Famosa I S.A. (*)

Famosa I

RN

22.5

11.1

Jul/15

Jul/14

May/47

Central Geradora Eólica Pau Brasil S.A. (*)

Pau Brasil

CE

15.0

7.7

Jul/15

Jul/14

Mar/47

Central Geradora Eólica Rosada S.A.

Rosada

RN

30.0

13.4

Jul/15

Jul/14

May/47

Central Geradora Eólica São Paulo S.A. (*)

São Paulo

CE

17.5

8.1

jul/15

Jul/14

Mar/47

Energia dos Ventos I (*)

Goiabeira

CE

19.2

9.9

Nov/16 (***)

Jun/15

Jul/47

Energia dos Ventos II (*)

Ubatuba

CE

12.6

5.8

Aug/16 (***)

Apr/15

Jul/47

Energia dos Ventos III (*)

Santa Catarina

CE

16.0

8.5

Jun/16 (***)

Apr/15

Jul/47

Energia dos Ventos IV (*)

Pitombeira

CE

27.0

13.9

Nov/16 (***)

Apr/15

Jul/47

Energia dos Ventos V (*)

São Januário

CE

19.2

9.0

Feb/17 (***)

Apr/15

Jun/47

Energia dos Ventos VI (*)

Nossa Senhora de Fátima

CE

28.8

12.8

Apr/17 (***)

Apr/15

Aug/47

Energia dos Ventos VII (*)

Jandaia

CE

28.8

14.1

May/17 (***)

Apr/15

Aug/47

Energia dos Ventos VIII (*)

São Clemente

CE

19.2

9.3

Jan/17 (***)

Apr/15

Jul/47

Energia dos Ventos IX (*)

Jandaia I

CE

14.4

9.9

Nov/16 (***)

Nov/16

Jul/47

Energia dos Ventos X (*)

Ventos de Horizonte

CE

19.2

7.3

Oct/16 (***)

Oct/14

Jul/47

Bom Jesus Eólica S.A.

Bom Jesus

CE

18.0

8.1

Sep/15

Oct/14

Apr/49

Cachoeira Eólica S.A.

Cachoeira

CE

12.0

5.0

Sep/15

Oct/14

Apr/49

Pitimbu Eólica S.A.

Pitimbu

CE

18.0

7.2

Sep/15

Oct/14

Mar/49

São Caetano Eólica S.A.(*)

São Caetano

CE

25.2

11.0

Sep/15

Oct/14

Apr/49

São Caetano I Eólica S.A.

São Caetano I

CE

18.0

7.7

Sep/15

Oct/14

Apr/49

São Galvão Eólica S.A.(*)

São Galvão

CE

22.0

9.5

Sep/15

Oct/14

Mar/49

Carnaúba I Eólica S.A.

Carnaúba I

RN

22.0

9.4

Sep/15

Oct/14

Jul/49

Carnaúba II Eólica S.A.

Carnaúba II

RN

18.0

7.3

Sep/15

Oct/14

Jul/49

Carnaúba III Eólica S.A.

Carnaúba III

RN

16.0

7.5

Sep/15

Oct/14

Jul/49

Carnaúba V Eólica S.A.

Carnaúba V

RN

24.0

10.1

Sep/15

Oct/14

Jul/49

Cervantes I Eólica S.A.

Cervantes I

RN

16.0

7.1

Sep/15

Oct/14

Jul/49

Consórcio Ouro Verde II

Ouro Verde II

RN

28.0

11.2

May/18

Dec/16

Nov/49

Consórcio Ouro Verde III

Ouro Verde III

RN

24.0

9.4

May/18

Dec/16

Nov/49

Consórcio Santa Rosa

Santa Rosa

CE

20.0

8.4

May/18

Dec/16

Oct/49

Consórcio Uirapuru

Uirapuru

CE

28.0

12.6

May/18

Oct/16

Oct/49

Consórcio Ventos do Angelim

Ventos de Angelim

CE

22.0

10.3

May/18

Dec/16

Nov/49

Consórcio Serra do Mel

Serra do Mel I

RN

28.0

13.0

May/18

Jun/17

Oct/49

Consórcio Serra do Mel

Serra do Mel II

RN

28.0

12.8

May/18

Jun/17

Oct/49

Consórcio Serra do Mel

Serra do Mel III

RN

28.0

12.5

May/18

Jun/17

Nov/49

Geradora Eólica Itaguaçu da Bahia SPE S.A.(*)

Itaguaçu da Bahia

BA

28.0

14.0

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de Santa Luiza SPE S.A. (*)

Ventos de Santa Luiza

BA

28.0

14.2

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de Santa Madalena SPE S.A.(*)

Ventos de Santa Madalena

BA

28.0

14.7

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de Santa Marcella SPE S.A. (*)

Ventos de Santa Marcella

BA

28.0

13.6

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de Santa Vera SPE S.A. (*)

Ventos de Santa Vera

BA

28.0

15.2

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de Santo Antônio SPE S.A.(*)

Ventos de Santo Antônio

BA

28.0

16.1

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de São Bento SPE S.A. (*)

Ventos de São Bento

BA

28.0

14.4

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de São Cirilo SPE S.A. (*)

Ventos de São Cirilo

BA

28.0

14.7

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de São João SPE S.A.(*)

Ventos de São João

BA

28.0

15.0

May/18

Mar/17

Sep/49

Geradora Eólica Ventos de São Rafael SPE S.A. (*)

Ventos de São Rafael

BA

28.0

13.8

May/18

Mar/17

Sep/49

Tijoá Participações e Investimentos S.A.

HPU Três Irmãos

SP

807.5

217.5

Oct/14

(**)

Oct/44

(*) Installed Capacities amount retified.
(**) Enterprise concluded.

 

61


 
 

 

 

 

11.1.2.1  SPE

 

SPE

Unit

Investiment

(R$ million)

Working Schedule (%)

Participation (%)

Partners

Total

Up to 4Q14 (Only Furnas)

Cia. Hidrelétrica Teles Pires

HPU Teles Pires

 

4,512

 

167.2

92.07

24.5

Eletrosul (24.5%)

Neoenergia (50.10%)

Odebrecht Part. Invest. (0.9%)

Madeira Energia S.A.

HPU Santo Antônio

20,587.0

3,732.6

92.55

39.0

Odebrecth Energia (18.6%)

Cemig (10.0%)

Andrade Gutierrez (12.4%)

Fundo de Invest. e Participações Amazônia Energia (20.0%)

Empresa de Energia São Manoel S.A.

HPU São Manoel

2,745.0

n/a

n/a

33.333

EDP – Energias do Brasil S.A. (66.667%)

CGE Famosa I S.A.*

Famosa I

85.8

8.3

2.5

49.0

Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%)

Comercial Mineira S.A (15.25%)

Ventos Tecnologia Elétrica S.A. (0.05%)

CGE Pau Brasil S.A.*

Pau Brasil

57.2

5.5

2.5

49.0

Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%)

Comercial Mineira S.A (15.25%)

Ventos Tecnologia Elétrica S.A. (0.05%)

CGE Rosada S.A.*

Rosada

107.3

10.4

2.5

49.0

Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%)

Comercial Mineira S.A (15.25%)

Ventos Tecnologia Elétrica S.A. (0.05%)

CGE São Paulo S.A.*

São Paulo

64.4

6.2

2.5

49.0

Empresa Brasileira de Desenvolvimento e Participações S.A. (35.70%)

Comercial Mineira S.A (15.25%)

Ventos Tecnologia Elétrica S.A. (0.05%)

Energia dos Ventos I*

Goiabeira

85.2

7.3

12.0

49.0

Alupar (50.99%)

Central Eólica Goiabeira (0.01%)

Energia dos Ventos II*

Ubatuba

47.3

4.5

12.0

49.0

Alupar (50.99%)

Central Eólica Ubatuba (0.01%)

Energia dos Ventos III*

Santa Catarina

75.8

6.5

12.0

49.0

Alupar (50.99%)

Central Eólica Santa Catarina (0.01%)

Energia dos Ventos IV*

Pitombeira

113.6

9.6

12.0

49.0

Alupar (50.99%)

Central Eólica Pitombeira (0.01%)

Energia dos Ventos V*

São Januário

85.2

7.7

12.0

49.0

Alupar (50.99%)

Central Eólica São Januário (0.01%)

Energia dos Ventos VI*

Nossa Senhora de Fátima

113.6

10.5

12.0

49.0

Alupar (50.99%)

Central Eólica Nossa Senhora de Fátima (0.01%)

Energia dos Ventos VII*

Jandaia

113.6

10.6

12.0

49.0

Alupar (50.99%)

Central Eólica Jandaia (0.01%)

Energia dos Ventos VIII*

São Clemente

85.2

7.7

12.0

49.0

Alupar (49%)

Central Eólica São Clemente (0.01%)

Energia dos Ventos IX*

Jandaia I

85.2

7.8

12.0

49.0

Alupar (50.99%)

Central Eólica Jandaia I (0.01%)

Energia dos Ventos X*

Ventos de Horizonte

66.3

5.9

12.0

49.0

Alupar (50.99%)

Central Eólica Horizonte (0.01%)

Bom Jesus Eólica S.A.

Bom Jesus

78.6

7.2

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica Bom Jesus Ltda. (0.01%)

Cachoeira Eólica S.A.

Cachoeira

52.4

4.8

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica Cachoeira Ltda. (0.01%)

Pitimbu Eólica S.A.

Pitimbu

78.6

7.2

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica Pitimbu Ltda. (0.01%)

São Caetano Eólica S.A.

São Caetano

113.6

10.3

19

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica São Caetano Ltda. (0.01%)

São Caetano I Eólica S.A

São Caetano I

78.6

7.2

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica São Caetano I Ltda. (0.01%)

62


 
 

 

 

 

 

SPE

Unit

Investiment

(R$ million)

Working Schedule (%)

Participation (%)

Partners

Total

Up to 4Q14 (Only Furnas)

São Galvão Eólica S.A.

São Galvão

104.8

9.5

20

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Eólica São Galvão Ltda. (0.01%)

Carnaúba I Eólica S.A.

Carnaúba I

93.3

8.4

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Carnaúba I Ltda. (0.01%)

Carnaúba II Eólica S.A.

Carnaúba II

76.4

6.9

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Carnaúba II Ltda. (0.01%)

Carnaúba III Eólica S.A.

Carnaúba III

67.9

6.1

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Carnaúba III Ltda. (0.01%)

Carnaúba V Eólica S.A.

Carnaúba V

101.8

9.2

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Carnaúba V Ltda. (0.01%)

Cervantes I Eólica S.A.

Cervantes I

67.9

6.1

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Cervantes I Ltda. (0.01%)

Cervantes II Eólica S.A.

Cervantes II

50.9

4.6

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Cervantes II Ltda. (0.01%)

Punaú I Eólica S.A.

Punaú I

101.8

9.2

18

49.00

Fundo de Investimento em Participações Caixa Milão (50.99%)
Central Geradora Eólica Punaú I Ltda. (0.01%)

Consórcio Arara Azul

Arara Azul

98.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Arara Azul Ltda (0.01%)

Consórcio Bentevi

Bentevi

55.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Bentevi Ltda (0.01%)

Consórcio Ouro Verde I

Ouro Verde I

98.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Ouro Verde I Ltda (0.01%)

Consórcio Ouro Verde II

Ouro Verde II

106.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Ouro Verde II Ltda (0.01%)

Consórcio Ouro Verde III

Ouro Verde III

89.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Ouro Verde III Ltda (0.01%)

63


 
 

 

 

 

 

 

SPE

Unit

Investiment

(R$ million)

Working Schedule (%)

Participation (%)

Partners

Total

Up to 4Q14 (Only Furnas)

Consórcio Santa Rosa

Santa Rosa

79.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Santa Rosa Ltda (0.01%)

Consórcio Uirapuru

Uirapuru

107.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Central Eólica Uirapuru Ltda (0.01%)

Consórcio Ventos do Angelim

Ventos de Angelim

91.0

-

-

90.00

Eólica Tecnologia LTDA (7.0%)
Ventos Tecnologia Elétrica LTDA (2.99%)
Centrais Eólicas (0.01%)

Consórcio Serra do Mel

Serra do Mel I

135.3

-

-

90.00

Eólica Tecnologia LTDA (9.99%)
Gestamp Eólica Brasil LTDA (0.01%)

Consórcio Serra do Mel

Serra do Mel II

135.3

-

-

90.00

Eólica Tecnologia LTDA (9.99%)
Gestamp Eólica Brasil LTDA (0.01%)

Consórcio Serra do Mel

Serra do Mel III

135.3

-

-

90.00

Eólica Tecnologia LTDA (9.99%)
Gestamp Eólica Brasil LTDA (0.01%)

Geradora Eólica Itaguaçu da Bahia SPE S.A.

Parque Itaguaçu da Bahia

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos Santa Luiza SPE S.A.

Parque Ventos de Santa Luiza

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

 

Geradora Eólica Ventos Santa Madalena SPE S.A.

Parque Ventos de Santa Madalena

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos Santa Marcella SPE S.A.

Partque Ventos de Santa Marcella

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos Santa Vera SPE S.A.

Parque Ventos de Santa Vera

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos Santo Antônio SPE S.A.

Parque Ventos de Santo Antônio

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos São Bento SPE S.A.

Parque Ventos de São Bento

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos São Cirilo SPE S.A.

Parque Ventos de São Cirilo

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos São João SPE S.A.

Parque Ventos de São João

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

Geradora Eólica Ventos São Rafael SPE S.A.

Parque Ventos de São Rafael

144.9

1.2

1.8

49.00

Salus Fundo de Investimento em Participações (49.0%)
Casa dos Ventos Energias Renováveis S.A. (2.0%)

             

64


 
 

 

 

 

11.2.Transmission

11.2.1.Own assets

11.2.1.1.Transmission lines

Own lines

From – to

Total of Investment

(R$ million)

Investment up to 4Q14 (R$ million)

Extension

(km)

Tension

(kV)

Operation

End of

Concession

TL Bom Despacho 3 – Ouro Preto 2 *

120.1

Basis: Dec/08

144.90

180

500

**

Jan/39

TL Mascarenhas – Linhares and SS Linhares ***

67.20

Basis: Nov/09

37.06

99

230

Oct/15

Jul/40

TL Xavantes – Pirineus

31.18

Basis: Sep/11

16.46

50

230

Jun/16

Dec/41

TL Bom Despacho 3 – Ouro Preto 2 *

120.1

Basis: Dec/08

144.90

180

500

**

Jan/39

* Includes, besides the 500 kV Good Order 3 - Black Gold 2 , the SSs Good Order 3 ( Cemig ) - C and Ouro Preto 2 ( Cemig ) - 3A .

** It is ready to go into commercial Operation , only awaiting the issuance of the Operating License .

*** Includes, besides the 230 kV Mascarenhas - Linhares , SSs Mascarenhas ( Escelsa ) and Linhares ( Escelsa ) .

 

 

65


 
 

 

 

11.2.1.2.Substations – N/A

11.2.2.SPEs

11.2.2.1.Transmission lines

SPE

Object

(From - To)

Participation

(%)

Total of

Investment (R$ million)

Investment up to 4Q14 (R$ million)

Extension

(Km)

Tension

(kV)

Operation

End of Concession

Transenergia Goiás S.A.

Serra da Mesa – Niquelândia

49

130.00

6.89

100

230

Dec/15

 

Aug/15

Nov/39

Niquelândia - Barro Alto

88

230

Triângulo Mineiro Transmissora S.A.

Marimbondo II - Assis

49

324.84

46.1

296.5

500

Dec/15

Aug/43

Paranaíba Transmissora de Energia S.A.

Barreiras II - Rio das Éguas

24,5

917.58

125.0

244

500

May/16

May/43

Rio das Éguas - Luziânia

373

Luziânia - Pirapora II

350

Lago Azul Transmissora S.A.

Barro Alto - Itapaci

49.9

32.63

1.35

69

230

Sep/16

Feb/44

Mata de Santa Genebra Transmissora S.A.

Itatiba – Bateias

49.9

1,843.8

34.20

399

500

Sep/17

Feb/44

Araraquara II - Itatiba

207

Araraquara II - Fernão Dias

241

Vale do São Bartolomeu Transmissora de Energia S.A.

Luziânia - Brasília Leste

39.0

269.65

(Basis: Jul/2013)

15.32

67

500

Jul/16

Oct/43

Samambaia - Brasília Sul

14

345

Brasília Sul - Brasília Geral

13,5

230

Belo Monte Transmissora de Energia S.A.

Xingu – Estreito

24.5

2,237.55

-

2,092

800

Feb/18

Jun/44

Energia Olímpica S.A.

Barra da Tijuca – SS Olímpica

Gardência – SS Olímpica

49.9

n/a

n/a

n/a

138

May/15

n/a

 

 

66


 
 

 

 

11.2.2.2.Substations

 

 

SPE

SS

Participation

(%)

Investiment

(R$ million)

Transformation Capacity (MVA)

Location

Beginning of Operation

End of Concession

Luziânia Niquelândia Transmissora S.A.

SS Niquelândia

49.0

39.3

40

Niquelândia (GO)

Mar/15

May/42

Mata de Santa Genebra Transmissora S.A.

SS Santa Bárbara D’Oeste 440 kV, Static Compensator (-300,+300) Mvar

SS Itatiba 500 kV, Static Compensator

(-300,+300) Mvar

SE 500/440 kV Fernão Dias (9+1R)

49.9

1.843.8

4,000

SP

Feb/18

Feb/44

Vale do São Bartolomeu Transmissora de Energia S.A.

SS Brasília Leste

39.0

269.65

180

DF

Jul/16

Oct/43

Belo Monte Transmissora de Energia S.A.

 

Converter Station CA/CC,±800 kV, 4,000 MW, with SS 500 kV Xingu

24.5

2,162.00

3,400

Xingu (PA)

Feb/08

Jun/44

Converter Station CA/CC, ±800 kV, 3,850 MW, with SS 500 kV Estreito

3,300

Estreito (MG)

Energia Olímpica S.A.

SS Olímpica 13.8/13.8 kV –

49.9

n/a

120

Rio de Janeiro (RJ)

May/15

n/a

 

 

12.Loans and financing – R$ Million

 

Local currency - LC

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Index

Eletrobras

32

31

29

27

03/30/2018

9.5% p.y.

Eletrobras

63

60

57

53

12/30/2018

7% p.y.

Eletrobras

7

6

5

4

12/30/2015

7% p.y.

Eletrobras

255

254

249

248

03/30/2023

IPCA + 7% p.y.

Eletrobras

1

-

-

-

10/30/2014

6.5% p.y.

Eletrobras

355

358

357

359

06/30/2030

IPCA + 7 % p.y.

Eletrobras

216

218

217

219

12/30/2030

IPCA + 7 % p.y.

Eletrobras

678

684

680

685

11/30/2029

IPCA + 7% p.y.

Eletrobras

3

2

2

2

03/30/2017

6.5% p.y.

Eletrobras

594

590

577

571

12/30/2021

IPCA + 7% p.y.

Eletrobras

610

606

594

589

07/30/2022

IPCA + 7% p.y.

Eletrobras

264

263

258

257

12/30/2022

IPCA + 7% p.y.

Eletrobras

2

2

2

2

03/30/2020

6.5% p.y.

Eletrobras – Eletronet

144

144

144

144

08/30/2020

Sandlic

Eletrobras

-

-

-

644

08/30/2022

Sandlic

BNDES

818

802

785

769

07/15/2026

TJLP + 1.91% p.y.

BNDES

193

189

185

181

12/15/2025

TJLP + 3% p.y.

BNDES

46

45

44

43

07/15/2026

And 05/15/2018

TJLP + 2.18% p.y. and

TJLP + 6% p.y.

FINEP

68

68

68

68

11/15/2023

3.5% p.y.

FINEP

95

95

95

95

11/15/2023

TJLP – 1.5% p.y.

Caixa Econômica Federal

10

9

9

9

01/17/2022

8.7% p.y. and TJLP + 4% p.y.

Caixa Econômica Federal

217

223

217

224

07/27/2020

111% CDI

Caixa Econômica Federal

428

440

408

420

08/03/2020

111% CDI

Caixa Econômica Federal

91

89

91

89

10/15/2020

111% CDI

Caixa Econômica Federal

119

116

120

117

10/26/2020

111% CDI

Caixa Econômica Federal

1,040

1,014

1,046

1,015

05/16/2023

113.7% CDI

Banco do Brasil S.A.

211

217

212

218

02/07/2018

110% CDI

Banco do Brasil S.A.

775

756

778

757

10/31/2018

107.3% CDI

Banco do Brasil S.A.

405

416

412

425

12/06/2023

115% CDI

Basa

203

209

204

210

07/31/2017

102.89% CDI

Total

7,943

7,906

7,845

8,444

 

 

67


 
 

 

 

 

Foreign currency - FC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Currency

Eletrobras

38

32

36

34

04/06/2018

US$

Eletrobras

153

133

138

119

04/06/2018

Yen

BID

234

250

279

331

12/15/2031

US$

 Total

425

415

453

484

 

 

 

13.Contracts

13.1.Loans and financing

13.1.1.Parent company – R$ million

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total

(LC + FC)

By activity

506

523

1.049

1.961

983

1.001

2.905

8.928

Generation

419

440

965

1.897

952

968

2.826

8.467

Transmission

87

83

84

64

31

33

79

461

By creditor

506

523

1.049

1.961

983

1.001

2.905

8.928

Eletrobras

302

361

465

452

433

451

1.493

3.957

Others

204

162

584

1.509

550

550

1.412

4.971

Total

506

523

1.049

1.961

983

1.001

2.905

8.928

 

13.1.2.SPE - R$ million

 

Foz do Chapecó

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

130.186

130.186

130.186

130.186

130.186

130.186

878.758

Generation

130.186

130.186

130.186

130.186

130.186

130.186

878.758

Transmission

-

-

-

-

-

-

-

By creditor

130.186

130.186

130.186

130.186

130.186

130.186

878.758

BNDES

86.007

86.007

86.007

86.007

86.007

86.007

580.548

REPASSADORES

43.526

43.526

43.526

43.526

43.526

43.526

293.797

SINCRONO

654

654

654

654

654

654

4.412

Total

130.186

130.186

130.186

130.186

130.186

130.186

878.758

 

Enerpeixe

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

114.352

9.488

 

 

 

 

 

Generation

114.352

9.488

-

-

-

-

-

By creditor

114.352

9.488

 

 

 

 

 

BNDES Direct

56.700

4.704

-

-

-

-

-

BNDES - Banco do Brasil

14.413

1.196

-

-

-

-

-

BNDES - Bradesco

14.413

1.196

-

-

-

-

-

BNDES - Itaú

17.296

1.435

-

-

-

-

-

BNDES - Itaú/Unibanco

11.530

957

-

-

-

-

-

Total

114.352

9.488

 

 

 

 

 

 

68


 
 

 

 

Santo Antônio(*)

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

 

 

 

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

 

 

 

 

 

 

 

By creditor

 

 

 

 

 

 

 

BNDES Direto

 

 

 

 

 

 

 

BNDES Repasse

 

 

 

 

 

 

 

Banco da Amazônia - FNO

 

 

 

 

 

 

 

2nd Bonds Emission

 

 

 

 

 

 

 

3rd Bonds Emission

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

(*) Informations not available

 

Teles Pires

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

 47.318

 154.443

 166.451

 167.296

 176.584

 176.584

2,497.772

Generation

47.318

 154.443

 166.451

 167.296

 176.584

 176.584

2,497.772

Transmission

-

-

-

-

-

-

-

By creditor

 47.318

 154.443

 166.451

 167.296

 176.584

 176.584

2,497.772

BNDES

 22.999

 106.040

 118.048

 118.893

 128.181

 128.181

 1,941.271

Bonds – FI - FGTS

24.319

48.403

48.403

48.403

48.403

48.403

556.501

Total

 47.318

 154.443

 166.451

 167.296

 176.584

 176.584

2,497.772

 

Centro Oeste de Minas(*)

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

 

 

 

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

 

 

 

 

 

 

 

By creditor

 

 

 

 

 

 

 

BNDES

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

(*) Informations not available

 

Serra do Facão

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

89.971

38.203

38.203

38.203

38.203

38.203

248.325

Generation

89.971

38.203

38.203

38.203

38.203

38.203

248.325

Transmission

 

 

 

 

 

 

 

By creditor

89.971

38.203

38.203

38.203

38.203

38.203

248.325

BNDES Direto

39.425

38.203

38.203

38.203

38.203

38.203

248.325

Itaú BBVA Empréstimo Ponte

50.546

-

-

-

-

-

-

Total

89.971

38.203

38.203

38.203

38.203

38.203

248.325

 

Interligação Elétrica do Madeira(*)

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

 

 

 

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

 

 

 

 

 

 

 

By creditor

 

 

 

 

 

 

 

Banco da Amazônia

 

 

 

 

 

 

 

BNDES

 

 

 

 

 

 

 

Bonds

 

 

 

 

 

 

 

Total

 

 

 

 

 

 

 

(*) Informations not available

 

69


 
 

 

 

Goiás Transmissão

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

187.584

180.090

170.581

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

187.584

180.090

170.581

-

-

-

-

By creditor

187.584

180.090

170.581

 

 

 

 

Brasil – FCO

100.786

100.786

98.771

-

-

-

-

BNDES

86.797

79.304

71.811

-

-

-

-

Total

187.584

180.090

170.581

-

-

-

-

 

MGE Transmissão

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

99.931

90.915

81.899

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

99.931

90.915

81.899

-

-

-

-

By creditor

99.931

90.915

81.899

 

 

 

 

BNDES

99.931

90.915

81.899

-

-

-

-

Total

99.931

90.915

81.899

-

-

-

-

 

Transenergia São Paulo

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

46.550

42.448

38.343

34.238

30.134

26.029

72.132

Generation

 

 

 

 

 

 

 

Transmission

46.550

42.448

38.343

34.238

30.134

26.029

72.132

By creditor

46.550

42.448

38.343

34.238

30.134

26.029

72.132

BNDES

46.550

42.448

38.343

34.238

30.134

26.029

72.132

Total

46.550

42.448

38.343

34.238

30.134

26.029

72.132

 

Transenergia Renovável

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

127.391

115.712

104.033

92.354

80.675

68.783

170.853

Generation

 

 

 

 

 

 

 

Transmission

127.391

115.712

104.033

92.354

80.675

68.783

170.853

By creditor

127.391

115.712

104.033

92.354

80.675

68.783

170.853

BNDES

127.391

115.712

104.033

92.354

80.675

68.783

170.853

Total

127.391

115.712

104.033

92.354

80.675

68.783

170.853

 

Brasventos Eolo Geradora de Energia

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

115.653

107.293

98.932

 

 

 

 

Generation

115.653

107.293

98.932

-

-

-

-

Transmission

 

 

 

 

 

 

 

By creditor

115.653

107.293

98.932

 

 

 

 

BNDES

115.653

107.293

98.932

-

-

-

-

Total

115.653

107.293

98.932

-

-

-

-

 

 

70


 
 

 

 

Brasventos Miassaba 3 Geradora de Energia

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

114.878

106.574

98.269

114.878

 

 

 

Generation

114.878

106.574

98.269

114.878

-

-

-

Transmission

 

 

 

 

 

 

 

By creditor

114.878

106.574

98.269

114.878

 

 

 

BNDES

114.878

106.574

98.269

114.878

-

-

-

Total

114.878

106.574

98.269

114.878

-

-

-

 

Rei dos Ventos 3 Geradora de Energia

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

121.070

112.318

103.566

 

 

 

 

Generation

121.070

112.318

103.566

-

-

-

-

Transmission

 

 

 

 

 

 

 

By creditor

121.070

112.318

103.566

 

 

 

 

BNDES

121.070

112.318

103.566

-

-

-

-

Total

121.070

112.318

103.566

-

-

-

-

 

Triângulo Mineiro Transmissão S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

141.716

141.716

123.531

104.698

85.196

65.000

 

Generation

 

 

 

 

 

 

 

Transmission

141.716

141.716

123.531

104.698

85.196

65.000

-

By creditor

141.716

141.716

123.531

104.698

85.196

65.000

 

CEF

141.716

141.716

123.531

104.698

85.196

65.000

-

Total

141.716

141.716

123.531

104.698

85.196

65.000

-

 

Vale de São Bartolomeu Transmissão S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

107.580

157.440

137.237

116.315

94.649

72.212

 

Generation

 

 

 

 

 

 

 

Transmission

107.580

157.440

137.237

116.315

94.649

72.212

-

By creditor

107.580

157.440

137.237

116.315

94.649

72.212

 

CEF

107.580

157.440

137.237

116.315

94.649

72.212

-

Total

107.580

157.440

137.237

116.315

94.649

72.212

-

 

Mata de Santa Genebra S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

469.000

 

 

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

469.000

-

-

-

-

-

-

By creditor

469.000

 

 

 

 

 

 

CEF

469.000

-

-

-

-

-

-

Total

469.000

-

-

-

-

-

-

 

 

71


 
 

 

 

Companhia Transirapé de Transmissão S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

11.058

13.975

18.391

2.490

2.490

2.435

21.513

Generation

 

 

 

 

 

 

 

Transmission

11.058

13.975

18.391

2.490

2.490

2.435

21.513

By creditor

11.058

13.975

18.391

2.490

2.490

2.435

21.513

BDMG

328

2.325

2.490

2.490

2.490

2.435

21.513

Bonds Emission 1st Itaú - BBA

10.730

11.650

15.901

-

-

-

-

Total

11.058

13.975

18.391

2.490

2.490

2.435

21.513

 

Companhia Transleste de Transmissão S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

7.461

11.419

16.968

16.221

16.220

12.993

13.813

Generation

 

 

 

 

 

 

 

Transmission

7.461

11.419

16.968

16.221

16.220

12.993

13.813

By creditor

7.461

11.419

16.968

16.221

16.220

12.993

13.813

BDMG (PEM)

1.349

1.267

633

 

 

 

 

BDMG (FNE)

2.696

2.552

2.552

2.552

2.552

2.552

10.634

BNB (FNE)

824

1.139

862

748

747

750

3.179

Bonds Emission 1st Itaú BBA

2.592

6.461

12.921

12.921

12.921

9.691

-

Total

7.461

11.419

16.968

16.221

16.220

12.993

13.813

 

Companhia Transudeste de Transmissão S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

10.575

13.971

18.722

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

10.575

13.971

18.722

-

-

-

-

By creditor

10.575

13.971

18.722

 

 

 

 

Bonds Emission 1st Itaú BBA

10.575

13.971

18.722

-

-

-

-

Total

10.575

13.971

18.722

-

-

-

-

 

São Manoel

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

 

532.000

 

 

 

 

 

Generation

-

532.000

-

-

-

-

-

Transmission

-

-

-

-

-

-

-

By creditor

 

532.000

 

 

 

 

 

1st Emission Bonds (Santander)

-

532.000

-

-

-

-

-

Total

-

532.000

-

-

-

-

-

 

Paranaíba Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

353.290

 

 

 

 

 

 

Generation

 

 

 

 

 

 

 

Transmission

353.290

-

-

-

-

-

-

By creditor

353.290

 

 

 

 

 

 

Santander and BTG Pactual – Loan by 1st Emission of Debêntures

353.290

-

-

-

-

-

-

Total

353.290

-

-

-

-

-

-

 

 

72


 
 

 

 

14.Number of employees (headcount)

 

14.1.By tenure

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

2014

Up to 5

745

672

658

622

622

6 to 10

1,307

1,387

1,395

1,438

1,438

11 to15

334

323

318

305

305

16 to 20

255

265

269

247

247

21 to 25

225

223

222

250

250

Up to25

658

660

663

635

635

Total

3,524

3,530

3,525

3,497

5,511

 

14.2.By departments

 

Departmants

1Q14

2Q14

3Q14

4Q14

2014

Administrative

1,031

1,031

1,027

1,025

1,025

Operational

2,493

2,499

2,498

2,472

2,472

Total

3,524

3,530

3,525

3,497

5,511

 

14.3.By region

 

State

1Q14

2Q14

3Q14

4Q14

2014

Distrito Federal

165

166

167

162

162

Espírito Santo

56

56

57

55

55

Goiás

251

253

254

253

253

Minas Gerais

550

551

550

547

547

Mato Grosso

14

14

14

12

12

Paraná

158

158

158

147

147

Rio de Janeiro

1,876

1,877

1,875

1,876

1,876

Rondônia

05

04

03

03

03

São Paulo

442

444

440

435

435

Tocantins

07

07

07

07

07

Total

3,524

3,530

3,525

3,497

5,511

 

15.Complementary work force

 

Operational

1Q14

2Q14

3Q14

4Q14

2014

Hired

1,336

1,335

1,332

1,330

1,330

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.27

0.31

0.32

1.02

1.92

 

 

 

 

 

 

73


 
 

 

Balance Sheet

(R$ thousand)

 

Assets

 

12.31.14

12.31.13

Current Assets

 

 

Availabilities

658,063

841,111

Clients (Consumers and resellers)

364,500

298,542

Loans and financing

3,337

3,404

Marketable Securities

683,310

1,971,964

Dividends to receive (Remuneration of equity participation)

20,989

25,090

Fiscal Assets deferred (Taxes and contributions)

16,876

16,048

Income Tax and Social Contribution

59,263

79,539

Linked deposits

10,982

10,982

Stored materials

89,382

90,426

Financial Asset

77,833

74,448

Receivables - 12,783/13 Law

1,605,710

1,254,584

Others

401,169

411,925

Current Assets Total

3,991,414

5,078,063

.

   

Non-Current Assets

   

Clients (Consumers and resellers)

8,604

14,334

Loans and financing

4,003

7,321

Marketable Securities

3,483

3,582

Fiscal Assets deferred (Taxes and contributions)

164,588

155,446

Income Tax and Social Contribution

-

1,954,740

Reimbursement Rights - CCC (12,111 Law)

-

-

Linked deposits

641,895

666,567

Financial Asset – Annual allowed revenue (transmission)

3,990,482

3,133,280

Receivables - 12,783/13 Law

-

967,330

Others

202,010

49,313

Advances for equity participation

590,015

277,800

 

5,605,080

7,229,713

INVESTMENTS

3,980,860

3,191,947

FIXED ASSETS

1,249,718

1,602,600

INTANGIBLE

58,626

31,930

Non-Current Assets Total

10,894,284

12,056,190

Assets Total

14,885,698

17,134,253

 

74


 
 
 

Liabilities and Stockholders’ Equity

 

12.31.14

12.31.13

Current Liabilities

   

Suppliers

509,900

444,526

Loans and financing

250,414

60,192

Taxes and social contribution

92,092

87,332

Income Tax and Social Contribution

13

230

Derivatives

-

-

Advances from consumers

-

-

Shareholders remuneration (dividends payable)

13

34

Estimated obligations

178,112

377,658

Provisions for contingencies

-

-

Post-employment benefit (complementary Pension Fund)

91,296

121,025

Onerous Contracts

-

-

Sector charges (regulatory taxes)

136,496

156,899

Incentive to personnel retirement

-

-

Others

130,721

138,611

Current Liabilities Total

1,389,057

1,386,507

 

   

Non-Current Liabilities

   

Suppliers

-

-

Loans and financing

957,153

791,819

Taxes and social contribution

13,572

13,572

Income Tax and Social Contribution

199,523

67,045

Derivatives

-

-

Advances from consumers

-

-

Estimated obligations

93,029

-

Provisions for contingencies

1,482,916

1,404,872

Provision for uncovered liabilities on invested companies

-

-

Provision for onerous contract

114,724

1,434,251

Post-employment benefit (Complementary Pension Fund)

840,574

489,283

Leasing

-

-

Concessions to pay - UBP

-

-

Sectorial charges (regulatory taxes)

257,682

235,348

Obligations for asset demobilization

-

-

Advance for future Capital Increase

-

-

Others

13,599

5,641

Non-Current Liabilities Total

3,972,772

4,441,831

 

   

Stockholders’ Equity

   

Social Capital

9,753,953

9,753,953

Capital reserves

4,916,199

4,916,199

Profit reserves

-

-

Additional dividends proposed

-

-

Accrued profit/losses

-3,776,818

-2,658,880

Other comprehensive income

-1,369,465

-705,357

Non-controlling participation

-

-

 

   

Stockholders’ Equity Total

9,523,869

11,305,915

 

   

Liabilities and Stockholders’ Equity Total

14,885,698

17,134,253

 

 

 

75


 
 

 

 

Statement of Income by activity

(R$ thousand)

 

 

   

12.31.14

12.31.13

Operating Revenue

   

Generation

   

Plant Supply

121,046

-

Energy Supply

886,567

830,276

Short term electric Energy

152,364

672,780

O&M Revenue of Renewed Plants

1,225,667

1,641,544

Construction Revenue

88,641

69,707

Return on Investment - G

-

-

 

   

Transmission

   

O&M Revenue Renewed Lines

726,296

623,051

O&M Revenue

39,482

19,746

Construction Revenue – Transmission

896,186

869,883

Return on Investment - T

56,690

44,390

Other Operating Revenue

17,072

16,057

 

   

Deductions to Operating Revenue

-646,576

-688,951

Net Operating Revenue

3,563,435

4,098,483

 

   

Operating Costs and Expenses

   

Electric Energy purchased for resale

-620,038

-682,356

Charges on the use of electric grid

-732,110

-796,324

Fuel for production of electric Energy - CCC

-362,811

-730,443

Construction costs

-984,827

-939,590

Operating Expenses

   

Personnel, Material and Third party services

-1,128,338

-1,556,417

Remuneration and reimbursement

-12,055

-19,504

Depreciation and amortization

-105,230

-104,645

Donations and Contributions

-18,378

-21,046

Provisions

624,600

-359,855

Others

-45,202

-98,786

Operating Cost and Expenses

-3,384,389

-5,308,966

 

   

Result of equity participation

-168,718

65,378

Operating Result before Financial Result

10,328

-1,145,105

 

   

Financial Result

649,730

416,247

Result before Income Tax / Social Contribution

660,058

-728,858

 

   

Current Income Tax and and social contribution

-29

98,983

Deferred Income Tax and and social contribution

-1,777,967

163,809

Net income for the period

-1,117,938

-466,066

 

 

 

76


 
 

 

 

Cash Flow

(R$ thousand)

 

 

Cash Flow

12.31.2014

12.31.2013

OPERATING ACTIVITIES

   

Profit/Loss before income tax and social contribution

660,058

-728,858

Depreciation and amortization

105,230

104,645

Net monetary and currency variations

-439,819

-351,256

Financial charges

131,496

40,241

Equity Equivalency Result

168,718

-65,378

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

39,547

43,370

Provision for contingencies

155,666

40,613

Provision for loss on Investment

-246,915

246,915

Provision for staff realignment

-33,334

168,049

Impairment

443,197

620,274

Provision for onerous contracts

-1,319,527

-869,305

Provision for loss on financial asset

0

0

Global reversal reserve charges

0

0

Adjustment to present value / market value

0

0

Minority Participation in the Results

0

0

Charges on shareholders funds

0

0

Financing assets Revenue - IRR

-56,690

-44,390

Derivative financial instruments

0

0

Others

351,292

177,627

Variation in operating assets / liabilities

-273,616

127,232

Cash generated in operating activities

-314,697

-490,221

 

   

Financial charges paid

-109,681

-41,666

Payment of global reversal reserve charges

0

0

Financial charges received

0

0

Remuneration received from equity participation

91,264

50,956

Financial asset revenue by RAP

-905,124

-883,910

Receiving compensation for financial asset

1,041,875

5,089,452

Payment of income tax and social contribution

-18,440

0

Payment of pension fund

0

0

Lawsuits payment

-77,622

-24,426

Legal deposits

-12,889

-49,894

Net cash operating activities

-305,314

3,650,291

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

400,000

500,000

Loans and financing payable – principal

-58,214

-118,309

Payment of Shareholders remuneration

0

0

Payment on refinancing of taxes and contributions - Principal

0

0

Receipt of Advance for future Capital Increase

-312,215

-243,275

Others

49

0

Net cash financing activities

29,620

138,416

 

   

INVESTMENT ACTIVITIES

   

Acquisition of fixed asset

-151,183

-319,023

Acquisition of intangible asset

-33,435

-9,295

Acquisition of Concession asset

0

0

Advance for future capital increase

0

0

Acquisition of equity participation

-1,044,715

-938,577

Others

1,321,979

-1,775,446

Net cash investment activities

92,646

-3,042,341

 

   

Increase (decrease) in cash and cash equivalent

-183,048

746,366

 

   

Cash and cash equivalent – beginning of period – 12/31/13

841,111

94,745

Cash and cash equivalent – end of period – 12/31/14

658,063

841,111

 

-183,048

746,366

 

 

77


 
 

 

 

Results Analysis

 

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a loss 390.9% higher than that registered in the previous quarter, from a loss of R$ 230.8 million in 3Q14 to a loss of R$ 1,133.3 million in 4Q14, mainly due to the factors described below .

 

Oprating Revenue

 

In Generation:

 

The electric energy supply increased by 0.9%, from R$ 333.0 million in 3Q14 to R$ 336.1 million in 4Q14, mainly due to movement in the auction contracts in the Free Market - ACL.

 

The supply to final consumers of electric energy decreased by 6.0%, from R$ 239.7 million in 3Q14 to R$ 225.4 million in 4Q14, mainly due to contracts maturities.

 

In transmission:

 

Revenues from transmission system (operation and maintenance) fell by 1.2%, from R$ 212.5 million in 3Q14 to R$ 210.1 million in 4Q14, keeping the same level of the previous quarter.


The financial revenue decreased by 19.2%, from R$ 24.5 million in 3Q14 to R$ 19.8 million in 4Q14, mainly due to the update of the financial asset transmission.

 

Operating Expenses

 

The electric energy purchased for resale decreased by 21.6%, from R$ 244.6 million in 3Q14 to R$ 191.8 million in 4Q14, mainly due to the higher amount of energy purchased.


The operational provisions decreased by 452.9%, from a provision of R$ 212.7 million in 3Q14 to a reversal of R$ 750.6 million in 4Q14, mainly due to the reversal of the provision for losses on investments (improvements and retrofits on assets affected by Law 12,783 / 2013) of R$ 398.3 million and the reversal of Onerous Contracts, in R$ 712.8 million, of the plants at Camaçari and Itaparica and Transmission Contract 061/2011.

 

Financial Result

 

The remuneration of indemnities of 12,783/13 Law increased by 585.9%, from R$ 35.6 million in 3Q14 to R$ 244 million in 4Q14, mainly due to adjustments in the calculation of compensation receivable.

 

Equity Participation

 

The result of equity investments decreased by 1,744.0%, from a revenue of R$ 8.4 million in 3Q14 to an expense of R$ 137.6 million in 4Q14, mainly due to a decrease in income from equity of Chesf on its investment in Sustainable Energy of Brazil - HPU Jirau.

 

Income Tax and Social Contribution

 

The social contribution and deferred income tax decreased by 1,852.1%, from a revenue of R$ 110.1 million in the 3Q14 to an expense of R$ 1,929.4 million in 4Q14, mainly due to lower tax credit according to CPC 38, as the company failed to demonstrate the possibility of recovering the tax credits that were activated, which can be reversed with profits in future years.

 

78


 
 

 

 

Market Data

 

1.Generation Assets and Energy generated

1.1.Own assets

Unit

Installed Capacity

MW

Guaranteed energy

MW Average

Energy generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Funil

30.00

10.91

11,239

9,120

9,053

12,866

42,278

Pedra

20.00

3.74

1,433

2,451

2,102

1,795

7,781

Araras

4.00

-

-

-

-

-

-

Curemas

3.52

1.00

83

-

-

-

83

Complexo de Paulo Afonso e Piloto

4,281.60

2,225.00

2,453,959

2,414,741

2,399,169

2,433,575

9,701,444

Sobradinho

1.050.30

531.00

582,648

599,487

550,798

503,077

2,236,010

Luiz Gonzaga (Itaparica)

1.479.60

959.00

1,062,845

1,040,267

1,038,597

1,038,435

4,180,144

Boa Esperança (Castelo Branco)

237.30

143.00

333,799

275,788

291,248

258,270

1,159,105

Xingó

3,162.00

2,139.00

2,710,532

2,713,788

2,737,994

2,767,328

10,929,642

Camaçari*

346.80

229.80

126,992

143,032

95,359

116,805

482,188

The installed capacity of UTE Camaçari is 346.80 MW when operates with Natural Gas, which is more efficient. When uses diesel oil its installed capacity is approximately 333.80 MW. Guaranteed Energy of Funil changed since 01/01/14, according to Ordinance ANEEL 1,577, from 07/30/2013.

 

Unit

Location

(State)

Beginning of Operation

End of Operation

Funil

BA

Mar/62

Dec/42

Pedra

BA

Apr/78

Dec/42

Araras

CE

Feb/67

Jul/15

Piloto

BA

Jan/55

Jul/15

Curemas

PB

Jun/57

Nov/24

Complexo de Paulo Afonso

BA

Jan/55

Dec/42

Sobradinho

BA

Apr/79

Feb/22

Luiz Gonzaga (Itaparica)

PE

Feb/88

Dec/42

Boa Esperança (Castelo Branco)

PI

Jan/70

Dec/42

Xingó

SE

Apr/94

Dec/42

Camaçari

BA

Feb/79

Aug/27

 

1.2.SPEs

 

SPE

Unit

Installed Capacity

(MW)

Guaranteed energy

(MW Average)

Energy generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Energetica Águas da Pedra S.A.

HPU Dardanelos

261.00

159.60

544,046

465,654

98,142

129,698

1,237,540

ESBR Participações S.A.

HPU Jirau*

3,750.00

2,184.60

289,283

730,294

1,028,828

1,602,518

3,650,923

Pedra Branca S.A.

Pedra Branca

30.00

12.20

26,501

30,733

38,560

29,006

124,800

São Pedro do Lago S.A.

São Pedro do Lago

30.00

13.50

22,615

23,735

37,050

25,195

108,595

Sete Gameleiras S.A.

Sete Gameleiras

30.00

12.60

25,567

29,291

38,426

27,646

120,930

* The first turbine became into Operation  on September 2013 with 75 MW of installed capacity. Inj the 4Q14 the company totalled 20 machines in Operation, resulting in an installed capacity in Operation of 1,500 MW.

 

Unit

Participacion

% 

Local (State) 

Beginning of Operation

End of Operation 

Dardanelos

24.5

MT

Aug/11

Jul/42

Jirau

20.0

RO

Sep/13

Aug/43

Pedra Branca

49.0

BA

Mar/13

Feb/46

São Pedro do Lago

49.0

BA

Mar/13

Feb/46

Sete Gameleiras

49.0

BA

Mar/13

Feb/46

 

 

79


 
 

 

 

2.Electric energy purchased for resale

 

2.1. Own assets

 

Supplier

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

MWh

108,050

109,200

110,400

110,350

438,000

R$ million

17.29

17.47

17.66

17.66

70.08

Others

MWh

393,719

404,089

596,173

826,972

2,220,953

R$ million

54.10

53.9

178.88

173.32

460.20

 

2.2.SPE

 

Energética Águas da Pedra S.A.*

 

Supplier

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

MWh

-

-

-

-

-

R$ million

-

-

-

-

-

Others

MWh

-

7,830

29,645

289,600

327,075

R$ million

-

4.84

17.72

36.85

59.41

* Due to the enlargement of the dry season, the generation of energy in the plant was affected, so there was needed to trade energy in the short term market (CCEE) to assure the delivery of hired energy.

 

3.Energy sold

 

3.1.Own assets      

 

3.1.1. Energy sold by enterprises not affected by 12,783/2013 Law (not from quotas)

 

 

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Others

A

-

-

-

-

-

-

-

-

-

-

B

219.9

2,392,313

235.7

1,982,553

255.8

2,088,408

243.3

2,021,828

954,7

8.485.102

Total

A

-

-

-

-

-

-

-

-

-

-

B

219.9

2,392,313

235.7

1,982,553

255.8

2,088,408

243.3

2,021,828

954,7

8.485.102

A - Through auction

B - Through free market agreements or bilateral contracts

 

 

3.1.2. Energy sold by enterprises affected by 12,783/2013 Law (O&M)

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$

million

MWh

R$

million

MWh

Eletrobras System

A

24.8

938,919

26.2

948,912

26.6

959,340

27.9

958,905

105.5

3,806,076

B

-

-

-

-

-

-

-

-

-

-

Others

A

295.9

10,688,510

296.7

10,756,402

290.3

10,874,604

290.3

10,869,679

1,173.2

43,189,195

B

-

-

-

-

-

-

-

-

-

-

Total

A

320.7

11,627,429

322.9

11,705,314

316.9

11,833,944

318.2

11,828,584

1,278.7

46,995,271

B

-

-

-

-

-

-

-

-

-

 

A – Sale of energy in regulated enviroment – Revenues from quotas.

B  - Trough free market contracts or bilateral contracts

 

80

 
                                                                                                                 

 
 

 

 

3.2.SPE

 

Energética Águas da Pedra S.A.

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

               

-

-

B

               

-

-

Others

A

 

 

 

 

 

 

 

 

-

-

B

52.7

327,333

50.2

306,799

52.9

315,136

57.8

338,452

213.6

1,287,720

Total

A

-

-

-

-

-

-

   

-

-

B

52.7

327,333

50.2

306,799

52.9

315,136

57.8

338,452

213.6

1,287,720

 

ESBR Participações S.A.

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

3.2

32,961

8.3

88,031

12.1

126,204

18.2

183,578

41.8

430,774

B

1.6

9,478

3.7

21,937

16.6

98,000

38.3

226,219

60.2

355,634

Others

A

28.2

299,384

76.5

799,597

112.6

1,146,325

159.7

1,598,318

377.0

3,843,624

B

2.4

14,216

5.6

32,906

24.3

143,481

57.4

339,328

89.7

529,931

Total

A

31.4

332,345

84.8

887,628

124.7

1,272,529

177.9

1,781,896

418.8

4,274,398

B

4.0

23,694

9.3

54,843

40.9

241,481

95.7

565,547

149.9

885,565

CCEE

 

91.4

(66,756)

97.6

(212,177)

4.0

(485,182)

45.5

(771,461)

238.5

(1,535,576)

 

Pedra Branca S.A.

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

2.4

15,078

2.4

15,078

2.4

15,078

2.5

15,078

9.7

60,312

B

               

0

0

Others

A

1.9

11,639

1.9

11,639

1.9

11,639

1.9

11,639

7.6

46,556

B

 

 

 

 

 

 

 

 

0

0

Total

A

4.3

26,717

4.3

26,717

4.3

26,717

4.4

26,717

17.3

106,868

B

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

 

São Pedro do Lago S.A.

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

2.6

16,314

2.6

16,314

2.6

16,314

1.8

16,314

9.6

65,256

B

               

0

0

Others

A

2.0

12,594

2.0

12,594

2.0

12,594

1.4

12,594

7.4

50,376

B

 

 

 

 

 

 

 

 

0

0

Total

A

4.6

28,908

4.6

28,908

4.6

28,908

3.2

28,908

17.0

115,632

B

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

 

 

81


 
 

 

 

Sete Gameleiras S.A.

 

Buyer

Sale

model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

2.5

15,448

2.5

15,448

2.5

15,448

1.7

15,448

9.2

61,792

B

               

0

0

Others

A

1.9

11,927

1.9

11,927

1.9

11,927

1.3

11,927

7.0

47,708

B

 

 

 

 

 

 

 

 

0

0

Total

A

4.4

27,375

4.4

27,375

4.4

27,375

3.0

27,375

16.2

109,500

B

0.0

0

0.0

0

0.0

0

0.0

0

0.0

0

 

 

4.Settlement CCEE (Spot e MRE)

 

 

Unit

1Q14

2Q14

3Q14

4Q14

Net

R$ million

78.90

-40.07

-54.75

78.49

MWh

-1,916.70

-43,471.97

-115,840.35

67,127.02

MWaverage

-0.89

-19.90

-52.46

30.42

 

 

5.Fuel used to produce electricity

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Diesel Oil

Litre

25,494,000

58.1

36,386,000

79.2

29,708,000

76.2

10,759,000

29.3

102,347,000

242.8

Gás

m3

18,416,991

34.7

14,903,007

28.8

1,238,529

2.3

28,743,000

54.2

63,301,527

120.0

Total

 

 

92.8

 

108.0

 

78.6

 

83.5

 

362,8

 

 

6.Losses in generation - %

 

1Q14

2Q14

3Q14

4Q14

2014

2.72

2.77

2.55

2.37

2.60

* There was na update in the amounts informed in the previous quarters, because it was informed as na estimative.

 

7.Average price – R$/MWh

 

7.1. Own Assets – enterprises not affected by 12,783 law

 

1Q14

2Q14

3Q14

4QT14

2014

91.92

118.88

122.49

120.32

113.40

 

7.1.1. Own Assets – enterprises renewed in terms of 12,783 law – O&M

 

1Q14

2Q14

3Q14

4QT14

2014

27.58

27.58

26.78

26.90

27.21

 

 

82


 
 

 

 

7.2.SPE

 

 

1Q14

2Q14

3Q14

4Q14

2014

Energética Águas da Pedra S.A.

160.99

163.68

168.10

170.50

165.80

ESBR Participações S.A.

99.31

99.87

109.35

117.15

106.42

Pedra Branca S.A.

160.86

160.86

160.86

167.92

162.62

São Pedro do Lago S.A.

160.86

160.86

160.86

167.92

162.62

Sete Gameleiras S.A.

160.86

160.86

160.86

167.92

162.62

 

 

8.Extension of transmission lines - Km

 

8.1.Own assets

 

8.1.1.Transmission lines

 

8.1.1.1. Transmission lines – enterprises not affected by 12,783 Law

 

 

From-To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Ibicoara-Brumado, C1

94.5

230

Mar/12

Jun/37

Milagres-Coremas, C2

119.8

230

Jun/09

Feb/35

Milagres-Tauá, C1

208.1

230

Dec/07

Feb/35

Paulo Afonso III- Zebu II, C1

5.4

230

Aug/12

Aug/39

Paulo Afonso III- Zebu II, C2

5.4

230

Aug/12

Aug/39

Paraiso-Açu II, C2

132.8

230

Sep/10

Jun/37

Picos-Tauá II, C1

183.2

230

Feb/13

Jun/37

Pirapama II-Suape II, C1

20.9

230

Dec/12

Jun/37

Pirapama II-Suape II, C2

20.9

230

Dec/12

Jun/37

Suape III-Suape II, C1

3.6

230

Dec/12

Jan/39

Suape III-Suape II, C2

3.6

230

Dec/12

Jan/39

C. Mirim II-João Câmara II C1

31.4

230

Feb/14

Nov/40

Extremoz II-C. Mirim II C1

74.5

230

Feb/14

Nov/40

Jardim/Penedo, C1

110.0

230

Mar/14

Mar/38

B. Jesus da Lapa II – Igaporã II

115.0

230

May/14

Nov/40

Sub-Total - 230 Kv

1,129.1

 

 

 

Total Basic Network

1,129.1

 

 

 

Total

1,129.1

 

 

 

 

 

 

 

83


 
 

 

 

 

8.1.1.2. Transmission lines– enterprises renewed in accordance with 12,783 Law – (O&M)

 

From-To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Angelim II-Recife II, C1

169.1

500

Aug/77

Dec/42

Angelim II-Recife II, C2

170.7

500

Mar/80

Dec/42

Jardim-Camaçari IV, C1

249.6

500

May/00

Dec/42

Camaçari II-Camaçari IV, C1

0.3

500

Nov/12

Dec/42

L. Gonzaga-Angelim II, C1

248.4

500

Feb/77

Dec/42

L. Gonzaga-Milagres, C1

230.8

500

Feb/02

Dec/42

L. Gonzaga-Olindina, C1

248.6

500

May/76

Dec/42

Luiz Gonzaga-Sobradinho, C1

290.6

500

Oct/79

Dec/42

Messias-Suape II, C1

176.6

500

Dec/98

Dec/42

Suape II-Recife II, C1

45.4

500

Dec/98

Dec/42

Milagres-Quixada, C1

268.0

500

Sep/03

Dec/42

Olindina-Camacari II, C1

147.2

500

Oct/76

Dec/42

Olindina-Camacari II, C2

146.9

500

Sep/78

Dec/42

P.Afonso IV-Angelim II, C2

221.5

500

Jul/79

Dec/42

P.Afonso IV-Olindina, C2

212.8

500

Jun/78

Dec/42

P.Afonso IV-L. Gonzaga, C1

37.4

500

Oct/79

Dec/42

P.Afonso IV-Xingo, C1

53.8

500

Feb/93

Dec/42

Pres.Dutra II-Teresina II, C1

207.9

500

May/00

Dec/42

Pres.Dutra II-Teresina II, C2

207.7

500

Apr/03

Dec/42

Quixada-FortalezaII, C1

136.5

500

Sep/03

Dec/42

 

84


 
 

 

 

 

 

 

From-To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Sobral III-Pecem II, C1

176.6

500

May/00

Dec/42

Pecem II-Fortaleza II, C1

73.1

500

May/00

Dec/42

S.J.Piaui-B.Esperanca, C1

233.5

500

Dec/80

Dec/42

Sobradinho-S.J.Piaui, C1

211.0

500

Oct/80

Dec/42

Sobradinho-Luiz Gonzaga, C2

316.0

500

Jun/88

Dec/42

Teresina II-Sobral III, C1

334.2

500

May/00

Dec/42

U. Luiz Gonzaga-L.Gonzaga, C1

0.6

500

May/79

Dec/42

U. Luiz Gonzaga-L.Gonzaga, C2

0.6

500

May/79

Dec/42

U. Luiz Gonzaga-L.Gonzaga, C3

0.6

500

May/79

Dec/42

Usina IV-P.Afonso IV, C1

0.6

500

Dec/79

Dec/42

Usina IV-P.Afonso IV, C2

0.6

500

May/80

Dec/42

Usina IV-P.Afonso IV, C3

0.6

500

Oct/80

Dec/42

Usina IV-P.Afonso IV, C4

0.6

500

Jul/81

Dec/42

Usina IV-P.Afonso IV, C5

0.6

500

Dec/81

Dec/42

Usina IV-P.Afonso IV, C6

0.6

500

May/83

Dec/42

Usina Xingo – Xingo, C1

0.9

500

Oct/95

Dec/42

Usina Xingo – Xingo, C2

0.9

500

Oct/95

Dec/42

Usina Xingo – Xingo, C3

0.9

500

Oct/95

Dec/42

Usina.Xingo.- Xingo, C4

0.9

500

Oct/95

Dec/42

Usina Xingo – Xingo, C5

0.8

500

Mar/94

Dec/42

Usina Xingo – Xingo, C6

0.8

500

Nov/94

Dec/42

Xingo-Jardim, C1

159.8

500

May/00

Dec/42

Xingo-Messias, C1

219.0

500

Feb/93

Dec/42

Sub-Total - 500 Kv

5,203.6

 

 

 

Angelim-Messias, C1

78.9

230

Apr/77

Dec/42

Angelim-Messias, C2

78.5

230

Oct/76

Dec/42

Angelim-Messias, C3

79.1

230

Aug/86

Dec/42

Angelim-Ribeirão, C1

115.7

230

Jan/53

Dec/42

Angelim-Recife II, C2

171.7

230

Jan/67

Dec/42

Angelim-Recife II, C3

171.7

230

Jan/61

Dec/42

Angelim-Tacaimbó, C1

63.9

230

Mar/63

Dec/42

Angelim-Tacaimbó, C2

64.1

230

Mar/73

Dec/42

Angelim-Tacaimbó, C3

65.7

230

Jun/98

Dec/42

Arapiraca III–Rio Largo II, C1

124.7

230

Jan/98

Dec/42

Arapiraca III–Penedo, C1

89.6

230

Jan/98

Dec/42

Boa Esperança-Teresina, C1

198.0

230

Mar/70

Dec/42

Boa Esperança-Teresina, C2

198.0

230

Dec/81

Dec/42

Bongi-Açonorte, C1

6.0

230

Aug/76

Dec/42

B.Jesus da Lapa-Barreiras, C1

233.5

230

Dec/90

Dec/42

Banabuiu-Fortaleza, C1

177.2

230

Oct/65

Dec/42

Banabuiu-Fortaleza, C2

176.0

230

Jul/78

Dec/42

Aquiraz II-Banabuiu, C1

181.8

230

Aug/78

Dec/42

Aquiraz II-Fortaleza, C1

30.1

230

Aug/78

Dec/42

Banabuiu-Mossoro II, C1

177.2

230

Jul/03

Dec/42

Banabuiu-Russas II, C1

110.4

230

May/71

Dec/42

Bom Nome-Milagres, C1

83.7

230

Sep/61

Dec/42

Bom Nome-Milagres, C2

84.1

230

Dec/74

Dec/42

Bom Nome-Milagres, C3

83.9

230

Sep/79

Dec/42

Cauipe-Sobral, C1

177.4

230

Nov/73

Dec/42

Cicero Dantas-Catu, C1

200.7

230

Mar/68

Dec/42

Cicero Dantas-Catu, C2

201.3

230

Apr/72

Dec/42

Campina Grande-Coteminas, C1

2.5

230

Oct/99

Dec/42

Campina Grande-Goianinha, C1

99.3

230

Feb/70

Dec/42

C. Grande II – Extremoz II C1

192.8

230

Oct/99

Dec/42

Campina Grande II-Natal III, C2

176.5

230

Oct/02

Dec/42

Natal III-Natal II, C1

11.6

230

Oct/99

Dec/42

Natal III-Natal II, C2

11.6

230

Oct/02

Dec/42

Campina Grande II-Paraiso, C1

118.1

230

May/79

Dec/42

Campina Grande II-Paraiso, C2

119.0

230

Apr/79

Dec/42

Camaçari-Caraíba Metais, C1

3.2

230

Feb/82

Dec/42

Camaçari-Cqr, C1

7.2

230

May/92

Dec/42

Camaçari-Cotegipe, C1

22.9

230

Jun/70

Dec/42

Camaçari-Cotegipe, C2

23.5

230

Oct/76

Dec/42

Camaçari-Gov.Mangabeira, C1

83.7

230

Sep/82

Dec/42

Camaçari-Gov.Mangabeira, C2

83.7

230

Sep/82

Dec/42

Camaçari-Jacaracanga, C1

19.2

230

Jul/77

Dec/42

Camaçari-Jacaracanga, C2

19.2

230

Mar/77

Dec/42

Camaçari-Matatu, C1

47.0

230

Aug/53

Dec/42

Camaçari-Pituaçu, C1

39.2

230

Oct/84

Dec/42

Camaçari-Pituaçu, C2

39.2

230

Jan/02

Dec/42

85


 
 

 

 

 

 

 

From-To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Cotegipe-Jacaracanga, C1

15.2

230

Dec/71

Dec/42

Cotegipe-Matatu, C1

30.0

230

May/77

Dec/42

Catu-Camaçari, C1

25.0

230

Jun/70

Dec/42

Catu-Camaçari, C2

25.0

230

Aug/53

Dec/42

Catu-Gov.Mangabeira, C1

77.2

230

Aug/67

Dec/42

Catu-Itabaianinha, C1

143.9

230

Aug/53

Dec/42

Funil-Itapebi, C1

198.1

230

Jul/90

Dec/42

Funil-Itapebi, C2

198.1

230

Jul/90

Dec/42

Fortaleza-Cauipe, C1

58.2

230

Nov/73

Dec/42

Fortaleza II-Delmiro Gouveia, C1

7.1

230

Jun/89

Dec/42

Fortaleza II-Delmiro Gouveia, C2

7.1

230

Jun/89

Dec/42

Fortaleza-Fortaleza II, C1

0.3

230

Feb/00

Dec/42

Fortaleza-Fortaleza II, C2

0.3

230

Feb/00

Dec/42

Fortaleza-Fortaleza II, C3

0.3

230

Oct/05

Dec/42

Fortaleza II-Cauipe, C1

58.0

230

Nov/03

Dec/42

Fortaleza II-Cauipe, C2

58.0

230

Nov/03

Dec/42

Fortaleza II-Pici, C1

27.5

230

May/09

Dec/42

Fortaleza II-Pici, C2

27.5

230

May/09

Dec/42

Goianinha-Santa Rita II, C1

59.0

230

Oct/77

Dec/42

Santa Rita II-Mussuré II, C1

17.0

230

Oct/77

Dec/42

Goianinha-Mussure, C2

50.6

230

Oct/77

Dec/42

Gov.Mangabeira-Sapeaçu, C1

23.5

230

Dec/68

Dec/42

Gov.Mangabeira-Sapeaçu, C2

22.5

230

Feb/84

Dec/42

Gov.Mangabeira-Sapeaçu, C3

22.6

230

Feb/84

Dec/42

Icó-Banabuiú, C1

124.7

230

Dec/77

Dec/42

Itapebi-Eunápolis, C1

47.0

230

Jul/90

Dec/42

Itapebi-Eunápolis, C2

47.0

230

Jul/90

Dec/42

Irecê-Brotas de Macaúba, C1

135.4

230

Sep/81

Dec/42

Brotas de Macaúba-B.J Lapa, C1

204.6

230

Sep/81

Dec/42

Itabaianinha-Itabaiana, C1

76.8

230

Aug/53

Dec/42

Itabaiana-Jardim, C1

44.0

230

Aug/79

Dec/42

Itabaiana-Jardim, C2

44.0

230

Aug/79

Dec/42

Jacaracanga-Alunordeste, C1

1.8

230

May/83

Dec/42

Jacaracanga-Dow, C1

7.9

230

Jul/77

Dec/42

Jacaracanga-Dow, C2

7.8

230

Mar/77

Dec/42

Jardim-Fafen, C1

12.5

230

Aug/81

Dec/42

Jardim-Cia.Vale.Rio Doce, C1

0.8

230

Feb/07

Dec/42

Jaguarari-Sr. do Bonfim II, C1

80.7

230

Jan/80

Dec/42

Juazeiro II-Jaguarari, C1

88.0

230

Jan/80

Dec/42

Juazeiro II-Sr.do Bonfim II, C2

148.6

230

Apr/81

Dec/42

Libra-Libra, C1

1.5

230

Dec/91

Dec/42

Milagres-Banabuiu, C1

225.9

230

Feb/65

Dec/42

Milagres-Ico, C1

103.4

230

Dec/77

Dec/42

Milagres-Banabuiu, C3

225.1

230

Dec/77

Dec/42

Milagres-Coremas, C1

119.4

230

Nov/86

Dec/42

Mirueira-Pau Ferro, C1

23.1

230

Oct/99

Dec/42

Mirueira-Goianinha, C1

50.1

230

Dec/89

Dec/42

Messias-Maceió, C1

25.9

230

Nov/96

Dec/42

Messias-Maceió, C2

25.9

230

Nov/96

Dec/42

Messias-Rio Largo, C1

11.9

230

Aug/86

Dec/42

Messias-Rio Largo, C2

11.6

230

Oct/76

Dec/42

Messias-Rio Largo, C3

11.6

230

Apr/77

Dec/42

Mossoró-Açu, C1

71.3

230

Jul/87

Dec/42

Natal III - Extremoz II, C1

17.0

230

Feb/14

Dec/42

Olindina-Olindina, C1

0.2

230

May/80

Dec/42

Olindina-Olindina, C2

0.2

230

May/80

Dec/42

Paulo Afonso-Angelim, C1

221.3

230

Jan/53

Dec/42

Paulo Afonso-Angelim, C2

220.2

230

Jan/67

Dec/42

Paulo Afonso-Angelim, C3

220.2

230

Jan/61

Dec/42

Paulo Afonso-Angelim, C4

221.0

230

Dec/73

Dec/42

Paulo Afonso-Bom Nome, C1

170.1

230

Oct/61

Dec/42

Paulo Afonso-Bom Nome, C2

92.2

230

Dec/74

Dec/42

Paulo Afonso-Bom Nome, C3

170.8

230

Nov/78

Dec/42

Paulo Afonso-C. Dantas, C1

134.2

230

Mar/68

Dec/42

Paulo Afonso-C. Dantas, C2

133.8

230

Jun/72

Dec/42

Paulo Afonso – Floresta II, C1

79.0

230

Dec/74

Dec/42

Paulo Afonso-Itabaiana, C2

162.5

230

Apr/87

Dec/42

Paulo Afonso-Itabaiana, C3

162.5

230

Sep/85

Dec/42

Paulo Afonso IV-P.Afonso, C1

1.1

230

Oct/79

Dec/42

Paulo Afonso IV-P.Afonso, C2

1.4

230

Feb/81

Dec/42

86


 
 

 

 

 

 

 

From-To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Pau Ferro-Coteminas, C1

123.9

230

Oct/99

Dec/42

Pau Ferro-Campina Grande, C2

125.9

230

Oct/99

Dec/42

Paraiso-Natal II, C1

96.2

230

May/79

Dec/42

Paraiso-Natal II, C2

97.2

230

Apr/79

Dec/42

Piripiri-Sobral, C1

167.4

230

Aug/73

Dec/42

Pituaçu-Narandiba, C1

3.6

230

Nov/83

Dec/42

Pituaçu-Narandiba, C2

3.6

230

Nov/83

Dec/42

Pituaçu-Pituaçu, C1

2.0

230

Jan/77

Dec/42

Recife II-Joairam, C1

7.4

230

Jan/67

Dec/42

Recife II-Joairam, C2

7.4

230

Jan/67

Dec/42

Recife II-Joairam, C3

7.4

230

Jan/61

Dec/42

Joairam-Bongi, C1

6.3

230

Jan/53

Dec/42

Joairam-Bongi, C2

6.4

230

Jan/67

Dec/42

Joairam-Bongi, C3

6.4

230

Jan/61

Dec/42

Recife II-Goianinha, C1

71.4

230

Feb/72

Dec/42

Recife II-Goianinha, C2

71.5

230

Feb/72

Dec/42

Recife II-Mirueira, C1

31.0

230

Jun/80

Dec/42

Recife II-Mirueira, C2

31.5

230

Jun/80

Dec/42

Recife II-Mirueira, C3

31.5

230

Jun/86

Dec/42

Recife II-Pau Ferro, C1

33.2

230

Sep/04

Dec/42

Recife II-Pau Ferro, C2

33.2

230

Sep/04

Dec/42

Recife II-Pirapama II, C1

27.6

230

Jun/80

Dec/42

Recife II-Pirapama II, C2

27.6

230

Jun/80

Dec/42

Ribeirão-Recife II, C1

56.6

230

Sep/94

Dec/42

Rio Largo-Braskem, C1

23.2

230

Jun/76

Dec/42

Quixere-MossoróII,C1

50.2

230

Apr/81

Dec/42

Russas II – Quixere, C1

25.4

230

Apr/81

Dec/42

Sobral III-Sobral II, C1

13.8

230

May/09

Dec/42

Sobral III-Sobral II, C2

13.8

230

May/09

Dec/42

Sobral II – Cccp, 230 Kv, C1

2.9

230

Jun/01

Dec/42

S. Mendes-Picos, C1

99.6

230

Mar/86

Dec/42

S.João Piaui-Eliseu Martins, C1

172.9

230

Feb/98

Dec/42

S.João Piaui-S. Mendes, C1

68.2

230

Jul/85

Dec/42

Sr.do Bonfinal-Irece, C1

214.0

230

Sep/81

Dec/42

Sapeaçu-Funil, C1

195.7

230

Dec/68

Dec/42

Sapeaçu- S.Ant.Jesus, C2

32.0

230

Feb/84

Dec/42

Sapeaçu- S.Ant.Jesus, C3

32.0

230

Feb/84

Dec/42

S.Ant.Jesus-Funil, C2

162.1

230

Feb/84

Dec/42

S.Ant.Jesus-Funil, C3

162.6

230

Feb/84

Dec/42

Tacaimbo-C.Grande II, C1

124.7

230

Jun/85

Dec/42

Tacaimbo-C.Grande II, C2

124.7

230

Jun/85

Dec/42

Teresina I-Teresina II, C1

25.3

230

Sep/02

Dec/42

Teresina I-Teresina II, C2

25.3

230

Sep/02

Dec/42

Teresina-Piripiri, C1

154.7

230

Nov/71

Dec/42

Usina Apol.Sales- P.Afonso, C1

5.8

230

Oct/77

Dec/42

Usina Apol.Sales- P.Afonso, C2

5.7

230

Mar/77

Dec/42

Us. B.Esperança-B.Esperança, C1

2.8

230

Dec/80

Dec/42

Sobradinho-Juazeiro II, C1

42.5

230

Jan/80

Dec/42

Sobradinho-Juazeiro II, C2

42.5

230

Apr/81

Dec/42

Usina II-Paulo Afonso, C1

0.7

230

Oct/61

Dec/42

Usina II-Paulo Afonso, C3

0.7

230

May/67

Dec/42

Usina II-Paulo Afonso, C4

0.7

230

May/67

Dec/42

Usina II-Paulo Afonso, C5

0.7

230

Dec/67

Dec/42

Usina III-Paulo Afonso, C1

0.6

230

Oct/71

Dec/42

Usina III-Paulo Afonso, C2

0.6

230

Apr/72

Dec/42

Usina III-Paulo Afonso, C3

0.6

230

Apr/74

Dec/42

Usina III-Paulo Afonso, C4

0.6

230

Aug/74

Dec/42

Usina I-Paulo Afonso, C1

0.6

230

Jan/55

Dec/42

Usina I-Paulo Afonso, C2

0.6

230

Jan/55

Dec/42

Sub-Total - 230 Kv

12,585.3

 

 

 

C.Grande II-S.Cruz II, C1

117.3

138

Apr/63

Dec/42

C.Grande II-Pilões, C1

79.3

138

Jan/68

Dec/42

Paraíso-Santa Cruz II, C1

8.7

138

Jan/68

Dec/42

Pilões – Paraíso, C1

107.9

138

Jan/68

Dec/42

C. Novos-Santana do Matos, C1

38.8

138

Dec/67

Dec/42

Santana do Matos-Açu, C1

49.6

138

Dec/67

Dec/42

Santa Cruz II-C.Novos II, C1

55.0

138

Oct/65

Dec/42

Usina II-Zebu, C1

6.0

138

Dec/64

Dec/42

Sub-Total - 138 Kv

462.6

 

 

 

Abaixadora-Mulungu, C1

6.5

69

May/75

Dec/42

Abaixadora-Moxoto, C1

5.3

69

Oct/70

Dec/42

Abaixadora-Zebu, C1

5.4

69

Oct/72

Dec/42

Camacari-Camacari, C2

1.4

69

Jun/60

Dec/42

Cotegipe-Catu, C1

48.7

69

Jun/60

Dec/42

Cotegipe-Catu, C2

48.7

69

Jun/60

Dec/42

Jaboatao-Recife II, C1

3.1

69

Jan/65

Dec/42

M.Reduzido-M.Reduzido, C1

0.5

69

Apr/73

Dec/42

Matatu-Pituacu, C1

7.5

69

Jun/60

Dec/42

Matatu-Pituacu, C2

7.4

69

Jun/60

Dec/42

Pirapama II-Recife II, C1

21.3

69

Jan/65

Dec/42

Pituacu-Cotegipe, C1

22.1

69

Jun/60

Dec/42

Pituacu-Cotegipe, C2

21.9

69

Jun/60

Dec/42

Usina de Pedra-Jequié, C1

20.5

69

Nov/78

Dec/42

Vila Zebu-Itaparica, C1

27.0

69

Jul/77

Dec/42

Zebu-Moxoto, C1

7.2

69

Apr/83

Dec/42

Zebu-Xingo, C1

56.5

69

Aug/81

Dec/42

Sub-total 69 kV

311.0

 

 

 

Basic Network Total

17,788.9

 

 

 

General Total

18,562.5

 

 

 

87


 
 

 

 

 

8.1.2.Substations

 

8.1.2.1. Substations– enterprises not affected by 12,783 Law

 

Substation

Transformation capacity (MVA)

Location

Beginning of Operation

End of Operation

SS Elev. Usina de Curemas

5

PB

Jan/68

Nov/24

SS Elev. Usina Term. Camaçari

400

BA

Sep/78

Aug/27

SS Elev. Usina de Sobradinho

1,200

BA

Oct/79

Feb/22

SS Tauá II

102

CE

Dec/07

Mar/35

SS Ibicoara

410

BA

Jan/11

Jun/37

SS Pilões II

-

PB

Oct/12

Dec/42

SS Santa Rita II

300

PB

Jul/12

Aug/39

SS Suape III

200

PE

Jul/12

Jan/39

SS Coteminas

-

PB

Dec/09

Dec/42

SS Natal III

300

RN

Aug/12

Aug/39

SS Zebu II

200

AL

Jul/12

Aug/39

SS Brotas de Macaubas

-

BA

Jul/12

Dec/42

SS Brumado

-

BA

Aug/10

Jul/40

SS Camaçari IV

2,400

BA

Nov/12

Jul/40

SS Sapeaçu

-

BA

May/03

Jul/40

SS Suape II

600

PE

Dec/12

Jan/39

SS Arapiraca III

100

AL

Jun/13

Oct/40

SS Extremoz II

150

RN

Feb/14

Nov/40

SS João Câmara

360

RN

Feb/14

Nov/40

SS Acaraú

200

CE

Apr/14

Nov/40

SS Igaporã

300

BA

Jun/14

Nov/40

SS Jaguarari

-

BA

Jan/80

Jul/15

SS Floresta II **

-

PE

Oct/14

-

SS Tacaratu **

-

PE

Dec/14

-

SS Quixerê **

-

CE

Nov/14

-

SS Aquiraz II***

-

CE

Dec/13

-

SS Pecém II***

-

CE

Oct/13

-

SS Ceará Mirim II***

-

RN

Sep/14

-

(**)Substations transferred to Chesf by donation, according contract.

(***)Substantions belonged to SPE in which Chesf has own equipment installed of in the entrance of the TL.

 

 

88


 
 

 

 

 

 

8.1.2.2. Substations– enterprises renewed in accordance with 12,783 Law – O&M

 

Substation

Transformation capacity (MVA)

Location

Beginning of Operation

End of Operation

SS Elev. Usina Apolonio Sales

480

AL

Feb/77

Dec/42

SS Elev. Usina Luiz Gonzaga

1,665

PE

May/88

Dec/42

SS Elev. Usina Paulo Afonso I

202,5

BA

Jan/55

Dec/42

SS Elev. Usina Paulo Afonso II

495

BA

Jan/62

Dec/42

SS Elev. Usina Paulo Afonso III

960

BA

Jan/71

Dec/42

SS Elev. Usina Paulo Afonso IV

2,700

BA

Nov/79

Dec/42

SS Elev. Usina Piloto

3

BA

Jan/53

Dec/42

SS Elev. Usina Xingó

3,330

SE

Nov/94

Dec/42

SS Elev. Usina de Araras

5

CE

Feb/60

Dec/42

SS Elev. Usina B. Esperança

280

PI

Mar/70

Dec/42

SS Elev. Usina de Funil

43,2

BA

Jan/59

Dec/42

SS Elev. Usina de Pedra

27

BA

Nov/78

Dec/42

SS Pau Ferro

301

PE

Aug/02

Dec/42

SS Paraiso

200

RN

Feb/04

Dec/42

SS Bom Nome

388

PE

Oct/63

Dec/42

SS Irecê

229

BA

Sep/81

Dec/42

SS Milagres

1520

CE

Jan/64

Dec/42

SS Mirueira

401

PE

Aug/78

Dec/42

SS Moxotó

20

BA

Jan/72

Dec/42

SS Mulungú

10

BA

May/75

Dec/42

SS Sobradinho

900

BA

Oct/79

Dec/42

SS Sobral II

400

CE

Nov/73

Dec/42

SS Tacaimbó

301

PE

Jun/85

Dec/42

SS Cícero Dantas

101

BA

May/56

Dec/42

SS Açu II

378

RN

Nov/89

Dec/42

SS Angelim

310

PE

Jan/56

Dec/42

SS Angelim II

0

PE

Jan/80

Dec/42

SS Bongi

490

PE

May/56

Dec/42

SS Campina Grande II

610

PB

May/64

Dec/42

SS Itapebi

-

BA

Jan/03

Dec/42

SS Funil

450

BA

Jan/56

Dec/42

SS SSnhor Do Bonfim II

333.34

BA

May/81

Dec/42

SS Eunápolis

400

BA

Sep/98

Dec/42

SS Picos

173

PI

Jul/92

Dec/42

SS Modelo Reduzido

12,5

BA

Jan/67

Dec/42

SS Mossoró II

300

RN

Jan/77

Dec/42

SS Barreiras

401

BA

Jun/96

Dec/42

SS Sto. Antonio de Jesus

201

BA

Mar/97

Dec/42

SS Icó

200

CE

May/97

Dec/42

SS Mussuré II

401

PB

Mar/79

Dec/42

SS Paulo Afonso

-

AL

Mar/74

Dec/42

SS Penedo

302

AL

May/97

Dec/42

SS Cauípe

201

CE

Mar/01

Dec/42

SS Pici II

400

CE

May/05

Dec/42

SS Piripiri

297

PI

Aug/73

Dec/42

SS Pituaçu

402

BA

Mar/83

Dec/42

SS Santa Cruz II

100

RN

Mar/63

Dec/42

SS Banabuiú

121

CE

Jan/64

Dec/42

SS Currais Novos II

92

RN

Nov/75

Dec/42

SS Santana dos Matos II

50

RN

Nov/75

Dec/42

SS Coremas

300

PB

Dec/90

Dec/42

SS Fortaleza

405

CE

Jan/64

Dec/42

SS Joairam

451

PE

Jul/06

Dec/42

SS Juazeiro da Bahia II

302

BA

Apr/81

Dec/42

SS Matatu

380

BA

Jan/65

Dec/42

SS Natal II

401

RN

Jan/79

Dec/42

SS Itabaianinha

73

SE

Feb/96

Dec/42

SS Pirapama II

400

PE

Feb/72

Dec/42

SS Russas II

300

CE

Nov/82

Dec/42

SS Elizeu Martins

101

PI

Jan/06

Dec/42

SS Boa Esperança 230 Kv

110

PI

Mar/70

Dec/42

SS Boa Esperança 500 Kv

300

PI

Nov/80

Dec/42

SS Xingó 500 Kv

-

SE

Nov/94

Dec/42

SS Paulo Afonso IV

1,200

AL

Jan/79

Dec/42

SS Recife II

2,410

PE

Jan/79

Dec/42

SS S. João do Piaui

418

PI

Nov/80

Dec/42

SS Zebu

38

AL

Nov/76

Dec/42

SS Abaixadora

110

BA

Oct/67

Dec/42

SS Bom Jesus da Lapa

162

BA

Sep/81

Dec/42

SS Gov. Mangabeira

100

BA

Mar/60

Dec/42

SS Quixadá

-

CE

Jul/03

Dec/42

SS Jacaracanga

301

BA

Jan/82

Dec/42

SS Ribeirão

300

PE

Oct/94

Dec/42

SS Rio Largo II

301

AL

Dec/62

Dec/42

SS Messias

1201

AL

Nov/94

Dec/42

SS Camaçari II

2605

BA

Jan/79

Dec/42

SS Catu

300

BA

May/56

Dec/42

SS Cotegipe

302

BA

Jan/56

Dec/42

SS Teresina

600

PI

Apr/70

Dec/42

SS Fortaleza II

1,800

CE

May/00

Dec/42

SS Goianinha

300

PE

Jan/61

Dec/42

SS Teresina II

600

PI

May/00

Dec/42

SS Delmiro Gouveia

401

CE

Jun/89

Dec/42

SS Maceió

400

AL

Sep/02

Dec/42

SS Itabaiana

223

SE

May/57

Dec/42

SS Itaparica

10

PE

Jan/83

Dec/42

SS Jardim

1,601

SE

Aug/79

Dec/42

SS Sobral III

1,200

CE

Apr/00

Dec/42

SS Xingó 69 Kv

12,5

SE

Jan/87

Dec/42

SS Olindina

40

BA

Apr/80

Dec/42

SS Luiz Gonzaga 500kv

-

PE

May/88

Dec/42

* The substations Bela Vista and Campina Grande I were transferred to Energisa, according to ANEEL Resolution 4,462/2013.

89


 
 

 

 

 

8.2.SPE

 

8.2.1. Transmission Lines

 

SPE

From - To

Participation %

Extension

(km)

Tension

(kV)

Operation

End of Concession

Sistema de Transmissão do Nordeste S.A.

Teresina II/PI to Sobral/CE and Fortaleza/CE

49.0

546

500

Jan/06

Feb/34

INTESA - Integração Transmissora de Energia S.A.

Colinas-Miracema-Gurupi-Peixe Nova-Serra da Mesa 2 (TO / GO)

12.0

695

500

May/08

Apr/36

Manaus Transmissora de Energia S.A.

Oriximiná - Silves - Lechuga (AM), SS Silves (ex-Itacoatiara) and SS Lechuga (ex-Cariri)

19.5

559

500

Mar/13

Oct/38

Interligação Elétrica do Madeira S.A.

TL Coletora Porto Velho/ Araraquara II, CS

24.5

2,375

600

Aug/13

Feb/39

Extremoz Transmissora do Nordeste –ETN S.A.

TL Ceará Mirim/João Câmara II

 

TL Ceará Mirim/ Extremoz II

49.0

64

 

26

500

 

230

Oct/14

Oct/41

 

 

 

90


 
 

 

 

8.2.2. Substations

 

SPE

Substation

Transformation Capacity

(MVA)

Location

(State)

Operation

End of Operation

Interligação Elétrica do Madeira S.A.

Retifier Station CA/CC from 500 kV to +/- 600 kV.

Inverter Station CC/CA from +/- 600 kV to 500 kV.

3,150

 

2,950

RO

 

SP

May/14

Feb/39

TDG – Transmissora Delmiro Gouveia S.A.

SS – Pecém II, 500/230 kV.

 

SS – Aquiraz, 230/69 kV.

3,600

 

450

CE

Oct/13

 

Nov/13

Jul/40

 

Jul/40

Extremoz Transmissora do Nordeste - ETN S.A.

SS – João Câmara III,

500/138 kV

 

SS – Ceará Mirim II, 500/230 kV

 

 

900

 

900

 

 

RN

 

RN

 

Oct/14

Oct/41

 

9. Transmission losses %

 

1Q14

2Q14

3Q14

4Q14

2014

2.87

3.16

1.93

1.74

2.41

 

10.Main investments of parent company– R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Generation

66.03

57.34

50.08

60.21

233.66

424.73

Generation system maintenance

14.83

25.20

19.32

39.22

98.57

151.59

Combined cycle of UTE Camaçari

0.03

0.05

0.04

0.04

0.16

1.09

Wind Power Casa Nova

25.82

9.22

16.93

57.34

57.34

86.36

Deployment of Wind Park

0.13

0.95

0.47

2.16

2.16

42.27

Extension of electric Energy System

-

-

-

-

-

1.00

Extension Generation Cap. HEP Luiz Gonzaga (Itaparica)

-

-

-

-

-

0.62

Implant. Solar project - Power Generation

0.01

0.04

0.03

0.02

0.1

1.60

Itaparica resettlement area irrigation

25.21

21.88

13.29

14.94

75.32

140.20

Transmission

221.01

228.18

185.82

272.03

907.04

1,253.70

System Extension

94.94

106.30

91.29

126.30

418.83

629.14

Reimforcement and improvements

93.38

89.85

69.61

88.59

341.43

433.06

System maintenance

32.52

31.90

24.71

57.13

146.26

190.5

Suape II / Suape III venture

0.17

0.13

0.21

0.0

0.51

1.00

Others

12.06

12.22

16.41

56.26

96.95

162.18

Total

299.10

297.74

252.31

388.49

1.237.64

1,840.61

 

11.New investments

 

11.1.Generation

 

11.1.1.Own assets

 

 

Unit

Location

(State)

Total Investment

(R$ million)

Installed capacity (MW)

Guaranteed energy

(Avg MW)

Operation

Construction

End of Concession

Total

Up to 4Q14

UEE Casa Nova I

BA

800.0

653.4

180.0

61.4

Sep/15

May/12

Jan/46

UEE Casa Nova II

BA

102.5

1.2

28.0

7.1

May/18

Sep/15

Jul/49

UEE Casa Nova III

BA

93.1

1.0

24.0

5.5

May/18

Sep/15

Jul/49

 

 

91


 
 

 

 

11.1.2.SPE

 

SPE

Unit

Location

(State)

Installed capacity (MW)

Guaranteed energy (MW Avg)

Operation

Construction

End of Concession

ESBR Participações S.A.

HPU Jirau

RO

3,750.0

2,184.6

Sep/13

Dec/09

Aug/43

Norte Energia S.A.

HPU B. Monte

PA

11,233.1

4,571.0

Nov/15

Aug/11

Aug/45

Cia Energética Sinop S.A.

HPU Sinop

MT

400.0

239.8

Jan/18

Dec/13

Dec/47

Wind PlantCaiçara I S.A.

Wind Plant Caiçara I

CE

30.0

13.5

Jan/16

Jul/14

Jun/47

Wind PlantCaiçara II S.A.

Wind PlantCaiçara II

CE

21.0

9.3

Jan/16

Jul/14

Jul/47

Wind PlantJunco I S.A.

Wind PlantJunco I

CE

30.0

12.1

Jan/16

Jul/14

Jul/47

Wind PlantJunco II S.A

Wind PlantJunco II

CE

30.0

11.1

Jan/16

Jul/14

Jul/47

V. de Santa Joana IX Energia Renováveis S.A.

Wind Plant Santa Joana IX

PI

30.0

15.8

Sep/15

Mar/14

Apr/49

V. de Santa Joana X Energia Renováveis S.A.

Wind Plant Santa Joana X

PI

30.0

16.0

Sep/15

Mar/14

Apr/49

V. de Santa Joana XI Energia Renováveis S.A.

Wind Plant Santa Joana XI

PI

30.0

16.0

Sep/15

Mar/14

Apr/49

V. de Santa Joana XII Energia Renováveis S.A.

Wind Plant Santa Joana XII

PI

30.0

16.9

Sep/15

 Mar/14

Apr/49

V. de Santa Joana XIII Energia Renováveis S.A.

Wind Plant Santa Joana XIII

PI

30.0

16.0

Sep/15

 Mar/14

Apr/49

V. de Santa Joana XV Energia Renováveis S.A.

Wind Plant Santa Joana XV

PI

30.0

16.2

Sep/15

Mar/14

Apr/49

V. de Santa Joana XVI Energia Renováveis S.A.

Wind Plant Santa Joana XVI

PI

30.0

17.4

Sep/15

Mar/14

Apr/49

Baraúnas I Energética S.A.

Wind PlantBaraúnas I

BA

29.7

12.4

Sep/15

Mar/14

Apr/49

Mussambê Energética S.A.

Wind PlantMussambê

BA

29.7

11.5

Sep/15

Mar/14

Apr/49

Morro Branco I Energética S.A.

Wind Plant Morro Branco I

BA

29.7

12.7

Sep/15

Mar/14

Apr/49

Caititú 2 Energia S.A.

Wind PlantCaititú 2

BA

14.0

5.1

Sep/15

Feb/15

Apr/49

Caititú 3 Energia S.A.

Wind PlantCaititú 3

BA

14.0

4.7

Sep/15

Feb/15

Apr/49

Teiú 2 Energia S.A.

Wind PlantTeiú 2

BA

14.0

4.2

Sep/15

Feb/15

Apr/49

Arapapá Energia S.A.

Wind PlantArapapá

BA

10.0

2.2

Sep/15

Feb/15

Apr/49

Carcará Energia S.A.

Wind PlantCarcará

BA

10.0

4.6

Sep/15

Feb/15

Apr/49

Corrupião 3 Energia S.A.

Wind PlantCorrupião 3

BA

14.0

4.2

Sep/15

Feb/15

Apr/49

Acauã Energia S.A.

Wind PlantAcauã

BA

12.0

3.1

Sep/15

Feb/15

Apr/49

Angical 2 Energia S.A.

Wind PlantAngical 2

BA

14.0

5.1

Sep/15

Feb/15

Apr/49

Banda de Couro Energética S.A.

Wind Plant Banda de Couro

BA

29.7

12.9

May/18

Jan/15

Jul/49

Baraúnas II Energética S.A.

Wind PlantBaraunas II

BA

21.6

7.8

May/18

Jan/15

Jul/49

Coqueirinho 2 Energia S.A.

Wind PlantCoqueirinho 2

BA

20.0

8.5

Jan/16

Feb/15

Jun/49

Papagaio Energia S.A.

Wind PlantPapagaio

BA

18.0

4.9

Jan/16

Feb/15

Jun/49

Tamanduá Mirim 2 Energia S.A.

Wind PlantTamanduá Mirim 2

BA

24.0

8.0

May/18

Feb/15

Jun/49

Eólica Serra das Vacas I S.A.

Wind PlantSerra das Vacas I

PE

30.0

12.2

Jan/16

Aug/14

Jun/49

Eólica Serra das Vacas II S.A.

Wind Plant Serra das Vacas II

PE

30.0

9.9

Jan/16

Aug/14

Jun/49

Eólica Serra das Vacas III S.A.

Wind Plant Serra das Vacas III

PE

30.0

11.0

Jan/16

Aug/14

Jun/49

Eólica Serra das Vacas IV S.A.

Wind Plant Serra das Vacas IV

PE

30.0

10.5

Jan/16

Aug/14

Jun/49

V. de Santa Joana I Energia Renováveis S.A.

Wind Plant Santa Joana I

PI

30.0

14.7

Jan/16

Jun/14

Jun/49

V. de Santa Joana III Energia Renováveis S.A.

Wind Plant Santa Joana III

PI

30.0

14.3

Jan/16

Jun/14

Jun/49

V. de Santa Joana IV Energia Renováveis S.A.

Wind Plant Santa Joana IV

PI

30.0

14.2

Jan/16

Jun/14

Jun/49

V. de Santa Joana V Energia Renováveis S.A.

Wind Plant Santa Joana V

PI

30.0

14.1

Jan/16

Jun/14

Jun/49

V. de Santa Joana VII Energia Renováveis S.A.

Wind Plant Santa Joana VII

PI

30.0

14.8

Jan/16

Jun/14

Jun/49

V. de Santo Augusto IV Energia Renováveis S.A.

Wind Plant Santo Augusto IV

PI

30.0

15.7

Jan/16

Jun/14

Jun/49

 

 

92


 
 

 

 

11.1.2.1  SPE

 

SPE

Unit

Investiment

(R$ million)

Working Schedule (%)

Participation

(%)

Partners

Total

Up to 4Q14

ESBR Participações S.A.

HPU Jirau

18,968.0

17,080.0

90.1

 

20.00

 

Suez Energy

Mizha Energia

Eletrosul

Norte Energia S.A.

HPU B. Monte

29,375.0

14,983.6

58.6

15.00

Eletrobras/Eletronorte

Petros/ Belo Monte Part

Amazonas Energia e Outros

Cia Energética Sinop S.A.

HPU Sinop

1,804.8

79.6

12.0

24.50

Eletronorte/ EDF UTE Norte Fluminense

Wind PlantCaiçara I S.A.

Wind Plant Caiçara I

134.0

32.4

22.2

49.00

Envolver Participações

Wind PlantCaiçara II S.A.

Wind Plant Caiçara II

93.3

22.5

14.8

49.00

Envolver Participações

Wind Plant Junco I S.A.

Wind Plant Junco I

120.8

73.1

10.1

49.00

Envolver Participações

Wind Plant Junco II S.A.

Wind Plant Junco II

120.8

30.4

16.0

49.00

Envolver Participações

V. de Santa Joana IX Energia Renováveis S.A.

Wind Plant Santa Joana IX

102.9

58.5

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana X Energia Renováveis S.A.

Wind Plant Santa Joana X

102.9

56.5

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana XI Energia Renováveis S.A.

Wind Plant Santa Joana XI

102.9

51.2

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana XII Energia Renováveis S.A.

Wind Plant Santa Joana XII

102.9

64.6

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana XIII Energia Renováveis S.A.

Wind Plant Santa Joana XIII

102.9

56.6

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana XV Energia Renováveis S.A.

Wind Plant Santa Joana XV

102.9

77.7

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana XVI Energia Renováveis S.A.

Wind Plant Santa Joana XVI

102.9

62.4

73.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

Baraúnas I Energética S.A.

Wind Plant Baraúnas I

104.0

26.0

22.0

49.00

Brennand Energia S.A./

Brennand Energia Eólica

Mussambê Energética S.A.

Wind Plant Mussambê

104.0

26.0

22.0

49.00

Brennand Energia S.A./

Brennand Energia Eólica

Morro Branco I

Energética S.A.

Wind Plant Morro Branco I

104.0

26.0

22.0

49.00

Brennand Energia S.A./

Brennand Energia Eólica

Caititu 2 Energia S.A.

Wind Plant Caititú 2

40.2

13.2

*

99.96

Sequoia

Caititu 3 Energia S.A.

Wind Plant Caititú 3

40.2

13.2

*

99.96

Sequoia

Teiú 2 Energia S.A.

Wind Plant Teiú 2

40.2

10.6

*

99.95

Sequoia

Arapapá Energia S.A.

Wind Plant Arapapá

28.7

5.3

*

99.90

Sequoia

Carcará Energia S.A.

Wind Plant Carcará

28.7

13.2

*

99.96

Sequoia

Corrupião 3 Energia S.A.

Wind Plant Corrupião 3

40.2

13.2

*

99.96

Sequoia

Acauã Energia S.A.

Wind Plant Acauã

34.4

7.9

*

99.93

Sequoia

Angical 2 Energia S.A.

Wind Plant Angical 2

40.2

13.2

*

99.96

Sequoia

Coqueirinho 2 Energia S.A.

Wind Plant Coqueirinho 2

74.0

18.5

*

99.98

Sequoia

Papagaio Energia S.A.

Wind Plant Papagaio

66.6

11.6

*

99.96

Sequoia

Tamanduá Mirim 2 Energia S.A.

Wind Plant Tamanduá Mirim 2

73.2

21.1

*

49.00

Sequoia

Baraúnas II Energética S.A.

Wind Plant Baraunas II

75.6

4.5

0.0

49.00

Brennand Energia/ Brennand Energia Eólica S.A

Banda de Couro Energética S.A.

Wind Plant Banda de Couro

104.0

3.0

0.0

49.00

Brennand Energia/ Brennand Energia Eólica S.A

Eólica Serra das Vacas I S.A.

Wind Plant Serra das Vacas I

124.4

27.1

1.8

49.00

PEC Energia

Eólica Serra das Vacas II S.A.

Wind Plant Serra das Vacas II

122.6

25.6

1.8

49.00

PEC Energia

Eólica Serra das Vacas III S.A.

Wind Plant Serra das Vacas III

122.6

24.9

1.8

49.00

PEC Energia

Eólica Serra das Vacas IV S.A.

Wind Plant Serra das Vacas IV

122.6

25.9

1.8

49.00

PEC Energia

V. de Santa Joana I Energia Renováveis S.A.

Wind Plant Santa Joana I

105.3

17.0

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana III Energia Renováveis S.A.

Wind Plant Santa Joana III

105.3

22.3

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana IV Energia Renováveis S.A.

Wind Plant Santa Joana IV

105.3

13.1

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana V Energia Renováveis S.A.

Wind Plant Santa Joana V

105.3

12.9

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santa Joana VII Energia Renováveis S.A.

Wind Plant Santa Joana VII

105.3

14.3

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

V. de Santo Augusto IV Energia Renováveis S.A.

Wind Plant Santo Augusto IV

105.3

13.0

31.0

49.00

Contour Global/ SalusFip/ Ventos de Santa Joana

*Data not informed

93


 
 

 

 

 

11.2.Transmission

 

11.2.1.Own assets

 

11.2.1.1.Transmission lines

 

Own Lines

Investment (R$ million)

TL Extension (km)

Tension

(kv)

Operation

End of Concession

From - To

Eunápolis/Teixeira Freitas II C1

30.09

145

230

Dec/15

Oct/38

Funil/Itapebi C3

41.07

223

230

Apr/16

Apr/37

Eunápolis/Teixeira Freitas II C2

44.15

152

230

Dec/15

Aug/39

Pau Ferro/Santa Rita II

34.00

85

230

Feb/16

Aug/39

Paraiso/Açu II, C3

59.48

123

230

Sep/15

Nov/40

Açu/Mossoró II, C2

69

Sep/15

Nov/40

Sobral III/Acaraú II

25.87

97

230

Apr/15

Nov/40

Morro do Chapéu II/Irecê

22.13

65

230

Sep/15

Oct/41

Paraíso/Lagoa Nova II

33.11

65

230

Jul/15

Oct/41

Teresina II/Teresina III

13.76

26

230

Oct/15

Dec/41

Recife II/Suape II, C2

61.12

44

230

Jul/16

Dec/41

Camaçari IV/Sapeaçu

84.29

105

230

Aug/16

Dec/41

Sapeaçu/Sto.Antonio de Jesus

31

230

Jun/16

Dec/41

Jardim/ N Sra do Socorro

13.60

1,3

230

Jun/15

May/42

Messias/ Maceió II

20

230

Sep/15

May/42

Camaçari IV/Pirajá

47.07

45

230

Jun/16

May/42

Pituaçú/Pirajá

5

230

Jun/16

May/42

kV Mossoró II/ Mossoró IV

81.74

40

230

Dec/15

Jun/42

Ceará Mirim II/Touros

56

230

Dec/15

Jun/42

Russas II/ Banabuiu C2

110

230

May/16

Jun/42

Igaporã II – Igaporã III C1 e C2

77.50

4

230

May/15

Jun/42

Igaporã III – Pindaí II

46

230

May/15

Jun/42

 

11.2.1.2.Substations

 

 

Substation

Total Investment

R$ million

Transformation capacity (MVA)

Location

Operation

End of Operation

SS 230/69 kv Polo

17.18

100

BA

Jan/15

Oct/40

SS 230 kv Morro do Chapéu

24.33

150

BA

Sep/15

Oct/41

SS 230 kv Lagoa Nova

51.22

300

RN

Apr/15

Oct/41

SS 230 kv Ibiapina

200

CE

Oct/15

SS 230/69 kv Teresina III

29.21

400

PI

Jul/15

Dec/41

SS 230/69 kv N.S. Socorro

94.43

300

SE

Feb/15

May/42

SS 230/69 kv Maceió II

400

AL

Sep/15

SS 230/138 kv Poções II

200

BA

May/15

SS 230/69 kv Pirajá

30.57

360

BA

Sep/15

May/42

SS 230/69 kv Mirueira II

68.77

300

PE

Jan/15

May/42

SS 230/69 kv Jaboatão II

300

Jan/16

SS 230 kv Touros

46.18

150

RN

Aug/15

Dec/42

SS 230 kv Mossoró IV

100

Sep/15

SS 500/230 kv Igaporã III

99.44

2,050

BA

May/15

Jun/42

SS 230 kv Pindaí II

SS 230/138 kV Teixeira de Freitas II

17.91

100

BA

Dec/15

Oct/38

 

 

94


 
 

 

 

11.2.2.SPEs

 

11.2.2.1.Transmission lines

 

SPE 

From - To

 

Participation

(%)

Investiment

(R$ million)

Extension (Km)

Tension

(kV)

Operation

End of Concession

Total

Up to 4Q14

TDG Transmissora Delmiro Gouveia S.A.

TL São Luiz II/ São Luiz III

49

367.9

362.0

156

230

Aug/15

Jul/40

Extremoz Transmissora do Nordeste –ETN S.A.

TL Ceará Mirim/ Campina III, 500 kV.

49

169.8*

79.1*

201

500

Apr/15

Oct/41

TL Campina Grande III/Campina Grande II, 230 kV.

8,5

230

Interligação Elétrica Garanhuns S.A.

TL Luiz Gonzaga/ Garanhuns, 500 kV

49

560.1

508.5

224

500

Jul/15

Dec/41

TL Garanhuns/ Campina Grande III, 500 kv

190

500

TL Garanhuns/ Pau Ferro, 500 kV

239

500

TL Garanhuns/ Angelim I, 230 kV.

13

230

* The amounts are linked to TL’s: Ceará-Mirim/João Camara III and Ceará Mirim/Extremoz II, that are currently under Operation.

 

11.2.2.2.Substations

 

SPE

Substation

Investiment

(R$ million)

Up to 4Q14

(R$ million)

Transformation Capacity (KV)

Location

(State)

Beginning of Operation

End of Concession

Extremoz Transmissora do Nordeste - ETN S.A.

SS – Campina Grande III, 500/230 kV.

214.3*

198.1*

 

500/230

 

 

PB

 

Apr/15

Oct/41

Interligação Elétrica Garanhuns S.A.

 

SS – Garanhuns, 500/230 kV

 

SS – Pau Ferro, 500/230 kV.

131.38

 

99.85

91.45

 

68.84

500/230

 

500/230

PE

Jul/15

Dec/41

* The amounts are also linked to Substation João Camara III and Cearámirim II, that are currently under Operation.

 

12.Loans and financing – R$ million

 

Local currency – LC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Index

Eletrobras

41.6

39.3

37.0

34.7

09/30/2018

5.0% p.y

Eletrobras

0.2

0.2

0.1

0.1

05/30/2015

5.0% p.y

Eletrobras

0.2

0.2

0.1

0.1

05/30/2016

5.0% p.y

Eletrobras

4.5

4.1

3.7

3.3

02/28/2017

5.0% p.y

Eletrobras

0.4

0.4

0.4

0.4

12/30/2018

Inflation Index

Eletrobras

5.0

4.6

4.2

3.8

04/30/2016

5.0% p.y

Banco do Brasil

509.8

510.2

510.9

511.1

09/28/2018

115% of CDI

Banco do Nordeste – Maq/Equip/Benf

270.1

259.3

248.5

237.7

06/30/2020

7.5% p.y

Banco do Nordeste – Finame (PSI-BK)

13.5

12.9

12.3

11.8

06/15/2020

4.5% p.y

Caixa Econômica Federal

403.9

404.4

404.3

404.6

02/27/2019

115% of CDI

Total

1,249.2

1,235.6

1,221.5

1,207.6

   

 

95


 
 

 

 

Foreign currency – FC– N/A

 

13.Contracts

 

13.1.Loans and financing - R$ million

 

13.1.1.Parent company

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

250.4

281.5

280.6

277.5

95.5

22.1

-

1,207.60

Generation

194.1

228.3

225.9

225.1

50.0

-

-

923.4

Transmission

56.3

53.2

54.7

52.4

45.5

22.1

-

284.2

Energy tradings

 

-

By creditor

250.4

281.5

280.6

277.5

95.5

22.1

-

1,207.60

Eletrobras

14.2

21.6

6.6

-

-

-

-

42.4

Others

236.2

259.9

274.0

277.5

95.5

22.1

-

1,165.20

 

13.1.2.SPE

 

Sistema de Transmissão Nordeste S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total

(LC + FC)

By activity

18.4

19.3

20.4

21.4

22.5

23.7

53.1

178.8

Transmission

18.4

19.3

20.4

21.4

22.5

23.7

53.1

178.8

By creditor

18.4

19.3

20.4

21.4

22.5

23.7

53.1

178.8

Banco do Nordeste do Brasil

18.4

19.3

20.4

21.4

22.5

23.7

53.1

178.8

Integração Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total

(LC + FC)

By activity

31.2

30.6

30.6

30.6

30.6

25.5

-

179.1

Transmission

31.2

30.6

30.6

30.6

30.6

25.5

-

179.1

By creditor

31.2

30.6

30.6

30.6

30.6

25.5

-

179.1

BNDES

31.2

30.6

30.6

30.6

30.6

25.5

-

179.1

 

Manaus Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

67.6

98.4

96.8

95.5

94.3

93.2

329.3

875.3

Transmission

67.6

98.4

96.8

95.5

94.3

93.2

329.3

875.3

By creditor

67.6

98.4

96.8

95.5

94.3

93.2

329.3

875.3

BNDES

32.7

31.5

31.2

31.2

31.2

31.2

187.4

376.5

BASA

34.9

66.9

65.6

64.3

63.1

62.0

141.9

498.8

 

Interligação Elétrica do Madeira S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

142.5

121.6

131.3

142.0

160.0

175.9

1,562.3

2,293.2

Transmission

142.5

121.6

131.3

142.0

160.0

175.9

1,562.3

2,293.2

By creditor

142.5

121.6

131.3

142.0

160.0

175.9

1,562.3

2,293.2

BNDES

129.3

121.6

121.6

121.6

121.6

121.6

990.9

1,598.9

BASA

13.2

-

7.7

18.4

18.4

18.4

232.0

295.0

BONDS

-

-

2.0

2.0

20.0

35.9

339.4

399.3

 

 

96


 
 

 

 

Interligação Elétrica Garanhuns S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

31.75

30.83

30.83

30.83

30.83

30.83

177.1

363.0

Transmission

31.75

30.83

30.83

30.83

30.83

30.83

177.1

363.0

By creditor

31.75

30.83

30.83

30.83

30.83

30.83

177.1

363.0

BNDES

31.75

30.83

30.83

30.83

30.83

30.83

177.1

363.0

 

Transmissora Delmiro Gouveia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

153.0

-

-

-

-

-

-

153.0

Transmission

153.0

-

-

-

-

-

-

153.0

By creditor

153.0

-

-

-

-

-

-

153.0

Banco do Nordeste do Brasil S.A.

153.0

-

-

-

-

-

-

153.0

 

ESBR Participações S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

11,407.7

Generation

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

11,407.7

Transmission

 

             

Energy Trading

 

             

By creditor

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

11,407.7

Banco do Nordeste do Brasil S.A.

12.2

12.2

12.2

12.2

12.2

12.2

171.0

244.2

Banco do Brasil S.A.

80.8

80.8

80.8

80.8

80.8

80.8

1,130.7

1,615.5

BNDES

284.0

284.0

284.0

284.0

284.0

284.0

3,975.6

5,679.6

Banco Itaú BBA S.A.

54.5

54.5

54.5

54.5

54.5

54.5

763.2

1,090.2

BASA

-

-

-

-

-

-

-

-

CEF

80.8

80.8

80.8

80.8

80.8

80.8

1,130.7

1,615.5

Bradesco S.A.

58.1

58.1

58.1

58.1

58.1

58.1

814.1

1,162.7

 

Energética Águas da Pedra S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

34.0

34.0

33.7

33.4

33.4

33.4

202.5

404.4

Generation

34.0

34.0

33.7

33.4

33.4

33.4

202.5

404.4

Transmission

         

 

   

Energy Trading

         

 

   

By creditor

34.0

34.0

33.7

33.4

33.4

33.4

202.5

404.4

Banco do Nordeste do Brasil S.A.

         

 

   

Banco do Brasil S.A.

         

 

   

BNDES

34.0

34.0

33.7

33.4

33.4

33.4

202.5

404.4

 

Norte Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

-

-

219.0

572.5

694.4

695.4

14,577.9

16,759.2

Generation

-

-

219.0

572.5

694.4

695.4

14,577.9

16,759.2

Transmission

 

 

 

 

 

 

 

 

Energy Trading

 

 

 

 

 

 

 

 

By creditor

-

-

219.0

572.5

694.4

695.4

14,577.9

16,759.2

BNDES

-

-

144.3

344.4

415.4

416.4

8,694.9

10,015.3

CEF

-

-

58.1

177.4

217.0

217.0

4,575.7

5,245.3

Others

-

-

16.6

50.7

62.0

62.0

1,307.3

1,498.6

 

97


 
 

 

 

Junco I S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

56.8

-

-

-

-

-

-

56.8

Generation

56.8

-

-

-

-

-

-

56.8

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

56.8

-

-

-

-

-

-

56.8

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Others

56.8

-

-

-

-

-

-

56.8

 

Junco II S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

69.0

-

-

-

-

-

-

69.0

Generation

69.0

-

-

-

-

-

-

69.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

69.0

-

-

-

-

-

-

69.0

Others

69.0

-

-

-

-

-

-

69.0

 

Caiçara I S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

39.4

-

-

-

-

-

-

39.4

Generation

39.4

-

-

-

-

-

-

39.4

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

39.4

-

-

-

-

-

-

39.4

Others

39.4

-

-

-

-

-

-

39.4

 

Caiçara II S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

18.9

-

-

-

-

-

-

18.9

Generation

18.9

-

-

-

-

-

-

18.9

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

18.9

-

-

-

-

-

-

18.9

Others

18.9

-

-

-

-

-

-

18.9

 

São Pedro do Lago S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

5.0

5.0

5.0

5.0

5.0

5.0

40.0

70.0

Generation

5.0

5.0

5.0

5.0

5.0

5.0

40.0

70.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

5.0

5.0

5.0

5.0

5.0

5.0

40.0

70.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco do Brasil S.A.

-

-

-

-

-

-

-

-

BNDES

5.0

5.0

5.0

5.0

5.0

5.0

40.0

70.0

 

 

98


 
 

 

 

Pedra Branca S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Generation

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco do Brasil S.A.

-

-

-

-

-

-

-

-

BNDES

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

 

Sete Gameleiras S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Generation

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

Banco do Nordeste do Brasil

-

-

-

-

-

-

-

-

Banco do Brasil

-

-

-

-

-

-

-

-

BNDES

5.0

5.0

5.0

5.0

5.0

5.0

38.0

68.0

 

Banda de Couro Energética S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC+ FC)

By activity

3.0

-

-

-

-

-

-

3.0

Generation

3.0

-

-

-

-

-

-

3.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

3.0

-

-

-

-

-

-

3.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco HSBC

3.0

-

-

-

-

-

-

3.0

BNDES

-

-

-

-

-

-

-

-

 

Baraúnas I Energética S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

29.0

       

 

 

29.0

Generation

29.0

-

-

-

-

-

-

29.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

29.0

       

 

 

29.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco HSBC S.A.

29.0

-

-

-

-

-

-

29.0

BNDES

-

-

-

-

-

-

-

-

 

 

99


 
 

 

 

Baraúnas II Energética S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

3.0

       

 

 

3.0

Generation

3.0

-

-

-

-

-

-

3.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

3.0

       

 

 

3.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco HSBC S.A.

3.0

-

-

-

-

-

-

3.0

BNDES

-

-

-

-

-

-

-

-

 

Morro Branco I Energética S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

29.0

       

 

 

29.0

Generation

29.0

-

-

-

-

-

-

29.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

29.0

       

 

 

29.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco HSBC S.A.

29.0

-

-

-

-

-

-

29.0

BNDES

-

-

-

-

-

-

-

-

 

Mussambê Energética S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

30.0

-

-

-

-

-

-

30.0

Generation

30.0

-

-

-

-

-

-

30.0

Transmission

-

-

-

-

-

-

-

-

Energy Trading

-

-

-

-

-

-

-

-

By creditor

30.0

       

 

 

30.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

-

-

Banco HSBC S.A.

30.0

-

-

-

-

-

-

30.0

BNDES

-

-

-

-

-

-

-

-

 

Santa Joana IX

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

43.5

-

-

-

-

-

 

43.5

Generation

43.5

-

-

-

-

-

 

43.5

Transmission

-

-

-

-

-

-

 

-

Energy Trading

 

-

-

-

-

-

 

-

By creditor

43.5

     

 

 

 

43.5

Banco do Nordeste do Brasil S.A.

 

-

-

-

-

-

 

 

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

43.5

-

-

-

-

-

 

43.5

 

 

100


 
 

 

 

Santa Joana X

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

44.7

-

-

-

-

-

 

44.7

Generation

44.7

-

-

-

-

-

 

44.7

Transmission

-

-

-

-

-

-

 

-

Energy Trading

 

-

-

-

-

-

 

-

By creditor

44.7

-

-

-

-

 

 

44.7

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

44.7

-

-

-

-

-

 

44.7

 

Santa Joana XI

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

43.8

-

-

-

-

-

 

43.8

Generation

43.8

-

-

-

-

-

 

43.8

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

43.8

-

-

-

-

 

 

43.8

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

43.8

-

-

-

-

-

 

43.8

 

Santa Joana XII

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

52.4

-

-

-

-

-

 

52.4

Generation

52.4

-

-

-

-

-

 

52.4

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

52.4

-

-

-

-

 

 

52.4

Banco do Nordeste do Brasil

-

-

-

-

-

-

 

-

Banco do Brasil

-

-

-

-

-

-

 

-

BNDES

52.4

-

-

-

-

-

 

52.4

 

Santa Joana XIII

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

44.2

-

-

-

-

-

 

44.2

Generation

44.2

-

-

-

-

-

 

44.2

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

44.2

-

-

-

-

 

 

44.2

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

44.2

-

-

-

-

-

 

44.2

 

 

101


 
 

 

 

Santa Joana XV

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

49.1

-

-

-

-

-

 

49.1

Generation

49.1

-

-

-

-

-

 

49.1

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

49.1

-

-

-

-

 

 

49.1

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

49.1

-

-

-

-

-

 

49.1

 

Santa Joana XVI

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

52.0

-

-

-

-

-

 

52.0

Generation

52.0

-

-

-

-

-

 

52.0

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

52.0

-

-

-

-

 

 

52.0

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

52.0

-

-

-

-

-

 

52.0

 

Santa Joana I

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

58.7

-

-

-

-

-

 

58.7

Generation

58.7

-

-

-

-

-

 

58.7

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

58.7

-

-

-

-

 

 

58.7

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

58.7

-

-

-

-

-

 

58.7

 

Santa Joana III

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

47.5

-

-

-

-

-

 

47.5

Generation

47.5

-

-

-

-

-

 

47.5

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

47.5

-

-

-

-

 

 

47.5

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

47.5

-

-

-

-

-

 

47.5

 

 

102


 
 

 

 

Santa Joana IV

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

56.2

-

-

-

-

-

 

56.2

Generation

56.2

-

-

-

-

-

 

56.2

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

56.2

-

-

-

-

 

 

56.2

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

56.2

-

-

-

-

-

 

56.2

 

Santa Joana V

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

58.7

-

-

-

-

-

 

58.7

Generation

58.7

-

-

-

-

-

 

58.7

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

58.7

-

-

-

-

 

 

58.7

Banco do Nordeste do Brasil

-

-

-

-

-

-

 

-

Banco do Brasil

-

-

-

-

-

-

 

-

BNDES

58.7

-

-

-

-

-

 

58.7

 

Santa Joana VII

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

58.7

-

-

-

-

-

 

58.7

Generation

58.7

-

-

-

-

-

 

58.7

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

58.7

-

-

-

-

 

 

58.7

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

 

Banco do Brasil S.A.

-

-

-

-

-

-

 

 

BNDES

58.7

-

-

-

-

-

 

58.7

 

Santo Augusto IV

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

58.7

-

-

-

-

-

 

58.7

Generation

58.7

-

-

-

-

-

 

58.7

Transmission

-

-

-

-

-

-

 

-

Energy Trading

-

-

-

-

-

-

 

-

By creditor

58.7

-

-

-

-

 

 

58.7

Banco do Nordeste do Brasil S.A.

-

-

-

-

-

-

 

-

Banco do Brasil S.A.

-

-

-

-

-

-

 

-

BNDES

58.7

-

-

-

-

-

 

58.7

 

 

103


 
 

 

 

14.Number of employees

 

14.1.By tenure

 

Generation

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

155

159

159

158

6 to 10

105

124

106

96

11 to15

120

102

123

132

16 to 20

7

25

25

25

21 to 25

1

-

-

-

Beyond 25

382

383

384

377

Total

770

793

797

788

 

Transmission

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

422

494

495

494

6 to 10

208

224

185

175

11 to15

278

251

289

296

16 to 20

31

65

65

65

21 to 25

-

-

-

-

Beyond 25

736

742

740

735

Total

1,675

1,776

1,774

1,765

 

Administration

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

389

391

391

391

6 to 10

252

281

248

240

11 to15

157

155

188

195

16 to 20

16

18

18

18

21 to 25

3

2

1

1

Beyond 25

1,175

1,168

1,163

1,155

Total

1,992

2,015

2,009

2,000

 

14.2.By region

 

State

Number of employees

1Q14

2Q14

3Q14

4Q14

Bahia

1,663

1,698

1,691

1,683

Pernambuco

2,189

2,289

2,291

2,279

Ceará

316

323

324

319

Piauí

269

274

274

272

 

14.3.By departments

 

Department

Number of employees

1Q14

2Q14

3Q14

4Q14

Field

2,953

3,070

3,071

3,065

Administrative

1,484

1,514

1,509

1,488

 

15.Complementary work force – N/A

 

 

104


 
 

 

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.64

1.82

0.15

0.25

0.72

 

 

105


 
 

 
 

Balance Sheet

(R$ thousand)

 

Assets

Consolidated

12.31.14

12.31.13

Current Assets

   

Availabilities

344,024

395,324

Clients (Consumers and resellers)

964,642

998,258

Loans and financing

-

-

Marketable Securities

1,512,459

1,661,925

Dividends to receive (Remuneration of equity participation)

-

-

Fiscal Assets deferred (Taxes and contributions)

152,232

71,773

Income Tax and Social Contribution

-

136,865

Derivatives

124,635

108,339

Reimbursement Rights - CCC (12,111 law)

287,031

199,031

Linked deposits

-

-

Stored materials

83,890

57,000

Financial Asset

384,020

271,361

Receivables - 12,783/13 Law

367,379

331,364

Others

259,837

204,288

Current Assets Total

4,480,149

4,435,528

.

   

Non-Current Assets

   

Clients (Consumers and resellers)

13,795

172,500

Loans and financing

-

-

Marketable Securities

220

205

Fiscal Assets deferred (Taxes and contributions)

15,768

41,141

Income Tax and Social Contribution

1,003,483

101,018

Derivatives

135,276

107,816

Reimbursement Rights - CCC (12,111 Law)

-

-

Linked deposits

424,646

298,920

Financial Asset – Annual allowed Revenue (transmission)

4,700,324

4,185,989

Receivables - 12,783/13 Law

-

193,296

Others

1,469,875

1,347,199

Advances for equity participation

24,556

-

 

7,787,943

6,448,084

INVESTMENTS

2,622,484

2,145,400

FIXED ASSETS

7,547,366

7,826,431

INTANGIBLE

105,466

23,412

Non-Current Assets Total

18,063,259

16,443,327

Assets Total

22,543,408

20,878,855

                       

 

 

 

 

 

 

 

 

106


 
 

 

 


Liabilities and Stockholders’ Equity

Consolidated

12.31.14

12.31.13

Current Liabilities

   

Suppliers

987,132

558,736

Loans and financing

524,604

505,285

Bonds

13,422

12,804

Taxes and social contribution

63,355

72,009

Income Tax and Social Contribution

8

1,716

Derivative financial instruments

1,867

225,423

Advances from consumers

52,813

48,910

Shareholders remuneration (dividends payable)

456,994

102,386

Estimated obligations

209,405

256,233

Provisions for contingencies

-

-

Post-emplyment benefit (Complementary Pension Fund)

-

-

Onerous Contracts

1,687

-

Concessions to pay - UBP

-

-

Sector charges (regulatory taxes)

288,184

279,396

Incentive to personnel retirement

-

-

Others

363,869

328,672

Current Liabilities Total

2,963,340

2,391,570

 

   

Non-Current Liabilities

   

Suppliers

492,649

-

Loans and financing

4,003,132

4,427,367

Bonds

205,996

205,878

Taxes and social contribution

-

-

Income Tax and Social Contribution

-

110,161

Derivative

70,336

195,378

Advances from consumers

718,451

776,252

Estimated obligations

20,013

7,929

Provisions for contingencies

583,282

587,045

Provision for onerous contract

45,542

85,860

Post-Employment benefit (Complementary Pension Fund)

44,801

68,822

Sectorial Charges (regulatory taxes)

-

-

Advance for future Capital Increase

13,042

13,330

Incentive to personnel retirement

-

-

Others

155,859

74,302

Non-Current Liabilities Total

6,353,103

6,552,324

 

   

Stockholders’ Equity

   

Social Capital

11,563,279

11,563,279

Capital reserves

-

-

Profit reserves

1,246,516

126,605

Additional dividends proposed

456,777

305,053

Accrued profit/losses

-

-

Other comprehensive income

-39,607

-59,976

Non-controlling participation

-

-

 

   

Stockholders’ Equity Total

13,226,965

11,934,961

 

   

Liabilities and Stockholders’ Equity Total

22,543,408

20,878,855

 

 

 

 

 

107


 
 
 
Statement of Income

(R$ thousand)

          

 

Consolidated

12.31.14

12.31.13

Operating Revenue

   

Generation

   

Plant Supply

3,509,260

2,465,123

Energy Supply

1,321,835

1,441,592

Short term electric Energy

955,264

671,710

O&M Revenue of Renewed Plants

16,513

13,564

Construction Plant Revenue

-

-

Return on Investment - G

-

-

 

   

Transmission

   

O&M Revenue Renewed Lines

385,835

271,465

O&M Revenue

4,438

0

Construction Revenue – Transmission

251,279

331,410

Return on Investment - T

239,059

159,704

Other Operating Revenue

227,043

234,263

 

   

Deductions to Operating Revenue

-864,175

-732,882

Net Operating Revenue

6,046,351

4,855,949

 

   

Operating Costs

   

Electric Energy purchased for resale

-1,958,821

-75,732

Charges on the use of electric grid

-525,794

-544,198

Fuel for production of Electric Energy - CCC

-50,699

-19,127

Construction costs

-251,279

-331,410

Operating Expenses

   

Personnel, Material and Third part related services

-1,361,228

-1,505,953

Remuneration and reimbursement

-224,891

-207,335

Depreciation and amortization

-451,323

-435,496

Donations and Contributions

-1,304

-2,214

Provisions

-207,114

201,189

Others

-134,503

-200,658

Operating Costs and Expenses

-5,166,956

-3,120,934

 

   

Result of equity participation

-75,794

69,572

Operating Result before Financial Result

803,601

1,804,587

 

   

Financial Result

284,585

-567,640

Result before Income Tax / Social Contribution

1,088,186

1,236,947

 

   

Current Income Tax and and social contribution

26,056

-23,138

Deferred Income Tax and and social contribution

1,023,907

7,506

Fiscal Incentive Revenue

-104,684

0

Net income for the period

2,033,465

1,221,315

 

108


 
 
 

 

Cash Flow

(R$ thousand)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Profit/Loss before income tax and social contribution

1,088,186

1,283,948

Depreciation and amortization

451,323

435,496

Net monetary and currency variations

23,614

36,048

Financial charges

346,025

388,473

Equity Equivalency Result

75,794

-69,572

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

4,197

-741,828

Provision for contingencies

-2,193

85,763

Provision for staff realignment

0

78,602

Impairment

-79,944

165,334

Provision for onerous contract

-41,697

67,375

Provision for loss on financial asset

150,554

0

Global reversal reserve charges

0

0

Adjustment to present value / market value

0

0

Minority Participation in the Results

0

0

Charges on shareholders funds

0

0

Revenue of financing assets - IRR

-239,059

-159,704

Derivative financial instruments

-392,354

238,938

Others

198,691

343,595

Variation in operating assets / liabilities

806,467

-890,670

Cash generated in operating activities

2,389,604

1,261,798

 

   

Financial charges paid

-460,278

-400,457

Payment of global reversal reserve charges

0

0

Financial charges received

0

0

Remuneration received from equity participation

27,794

39,897

Financial asset revenue by RAP

293,922

178,702

Receiving compensation for financial asset

265,003

1,311,337

Payment of income tax and social contribution

-56,763

-9,692

Payment of pension fund

0

0

Lawsuits payment

-17,511

-200,523

Legal deposits

-125,726

237,592

Net cash operating activities

2,316,045

2,418,654

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

36,802

127,332

Loans and financing payable – principal

-844,333

-913,479

Payment of Shareholders remuneration

-418,013

0

Payment on refinancing of taxes and contributions - Principal

0

0

Receipt of Advance for future Capital Increase

0

0

Others

0

154,632

Net financing activities

-1,225,544

-631,515

 

   

INVESTMENT ACTIVITIES

   

Receiving of loans and Financing

0

0

Acquisition of fixed asset

-96,194

-113,692

Acquisition of intangible asset

-6,538

-15,154

Acquisition of Concession asset

-286,540

-335,017

Advance for future capital increase

-337,423

-21,618

Acquisition of equity participation

-563,269

-361,430

Others

148,163

-967,922

Net cash investment activities

-1,141,801

-1,814,833

 

   

Increase (decrease) in cash and cash equivalent

-51,300

-27,694

 

   

Cash and cash equivalent – beginning of period – 12/31/12

395,324

423,018

Cash and cash equivalent – end of period – 12/31/13

344,024

395,324

 

-51,300

-27,694

 

 

109


 
 

 

 

 

Results Analysis

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 306.3% higher than that registered in the previous quarter, from a net loss of R$ 310.6 million in 3Q14, for a net profit of R$ 640.8 million in 4Q14, mainly due to the factors described below.

 

Operating Revenue

 

In Generation:

 

The electric energy supply of increased by 3.6%, from R$ 306.1 million in 3Q14 to R$ 317.1 million in 4Q14, mainly due to increased supply demand in the previous quarter.


The supply to distributors increased by 4.3%, from R$ 946.5 million in 3Q14 to R$ 987 million in 4Q14, mainly due to negotiated energy demand along the CCEAR that in the period presented an increase of R$ 32 million higher than the compared period.

 

In transmission:

 

The revenues of transmission system (operation and maintenance) increased by 173.3%, from R$ 49.2 million in 3Q14 to R$ 134.6 million in 4Q14, mainly due to contracts after October 2003, that in the quarter had income of R$ 16 million below the previous quarter.

Operating Expenses

 

The electric energy purchased for resale decreased by 1.1% from R$ 920.3 million in 3Q14 to R$ 910.6 million in 4Q14, mainly due to reduction of R$ 113 million in energy purchased from CCEE in 4Q14, keeping the same level of the previous quarter..

 

The operating provisions increased by 2,857.5%, from a reversal of R$ 7.5 million in 3Q14, to a provision of R$ 208.5 million in 4Q14, mainly due to the reversal of onerous contract Coaracy Nunes, constitution of Impairment provision of the TPU Santana and lines and substations of the power transmission segment added to the PPR provision.

 

Financial Result

 

The net exchange variations decreased by 3,546.4%, from a revenue of R$ 2.1 million in 3Q14, to an expense of R$ 73.3 million in 4Q14, mainly due to decrease the discharges of liabilities in foreign currency , the dollar showed significant variation in their currency which increased the costs of exchange rate variation.

 

The others revenues and net financial expenses presented an increase of 1,199.9%, from R$ 10.4 million in 3Q14 to  $ 135 million in 4Q14, mainly due to revenue from derivatives constitution in 2014, amounting to R$ 140 million in 2014, an increase of revenue from discounts amounting to R$ 20 million more than in 2013, as well as late fees payment that amounts to R$ 23 million.

 

The rmuneration of indemnities of 12,783/13 Law decreased by 29.9%, from R$ 44.6 million in 3Q14 to R$ 31.1 million in 4Q14, mainly due to themonetary update on overdue amounts owed by the Government regarding the renewed concessions.

 

Equity Participation

 

The result of investment on equity participation decreased by 1,071.9%, from an expense of R$ 10.6 million in 3Q14 to an expense of R$ 123.8 million in 4Q14, mainly due to a decrease in income from equity of Eletronorte about their investments in SPSs.

 

Tax Incentives Revenue

 

The revenue from tax incentives increased by 208%, from an expense of R$ 52.8 million in 3Q14 to a R$ 57 million in 4Q14, mainly due to the increase in profit compared to the previous period.

 

Income Tax and Social Contribution

 

The social contribution and deferred income tax increased by 28,813.44% from a R$ 3.8 million in 3Q14 to R$ 1,112.6 million in 4Q14, mainly due to the recognition of tax credit.

110


 
 

 

 

Market Data

 

1.Generation Assets and Energy generated

 

1.1.Own assets

 

Unit

Installed

Capacity (MW)

Guaranteed energy

(MW Average)

Energy Generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

HPU Coaracy Nunes

78.00

-

145,249.77

168,302.02

169,210.70

113,339.60

596,102.09

Complexo de Tucuruí

8,535.00

4,140.00

14,108,384.77

12,954,494.23

7,772,229.19

5,224,525.29

40,059,633.48

HPU Samuel

216.75

92.70

304,096.87

287,107.32

147,362.38

119,139.03

857,705.60

HPU Curuá-Uma

30.30

24.00

63,782.61

50,642.72

43,716.49

42,690.72

200,832.54

TPU Rio Madeira3

119.35

-

-

-

-

-

-

TPU Santana

177.74

-

145,179.09

143,254.91

182,490.85

237,910.58

708,835.43

TPU Rio Branco I2

18.65

-

-

-

-

-

-

TPU Rio Branco II2

32.75

-

-

-

-

-

-

TPU Rio Acre

45.49

-

-

-

14,468

14.42

28.89

TPU – Santarém

14.76

-

-

-

2,765,213

3,543.32

6,308.53

TPU Senador Arnon Afonso Farias de Mello*

85.99

-

-

-

-

 

 

TOTAL

9,354.78

4,256.70

14,776,693.11

13,603,801.20

8,317,789.29

5,741,162.96

42,429,446.56

1Ceded to Boa Vista Energia since 02/10/2010

2ANEEL Ordinance no 136 of 01/21/2010, recommends that MME the extinsion of the authorization of public service of UTE Rio Branco I and Rio Branco II

3ANEEL Ordinance n 223 from 01/20/2014, declares as unservable the goods of UTE Rio Madeira.

 

 

Unit

Location

(State)

Beginning of

Operation

End of Operation

HPU Coaracy Nunes

AP

Oct/75

Dec/42

Complexo de Tucuruí

PA

Nov/84

Jul/24

HPU Samuel

RO

Jul/89

Sep/29

HPU Curuá-Uma

PA

Jul/77

Jul/28

TPU Rio Madeira3

RO

Apr/68

Sep/18

TPU Santana

AP

Jan/93

May/19

TPU Rio Branco I

AC

Feb/98

Jul/20

TPU Rio Branco II

AC

Apr/81

Jul/20

TPU Rio Acre

AC

Apr/94

Oct/18

TPU Senador Arnon Afonso Farias de Mello*

RR

1st Unit (mac. 2) Dec/90;

2ndUnit (mac. 1) Jun/91;

3rd Unit (mac. 3) Dec/93

Aug/24

TPU – Santarém

PA

Jun/14

Jun/34

1Ceded to Boa Vista Energia since 02/10/2010

2ANEEL Ordinance no 136 of 01/21/2010, recommends that MME the extinsion of the authorization of public service of UTE Rio Branco I and Rio Branco II

3ANEEL Ordinance n 223 from 01/20/2014, declares as unservable the goods of UTE Rio Madeira.

 

 

 

111


 
 

 

 

1.2.SPE

 

SPE

Unit

Installed Capacity (MW)

Guaranteed energy

(MW Average)

Energy generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

EAPSA - Energia Águas Da Pedra S.A.

HPU Dardanelos

261.00

154.9

544,046.35

465,653.50

98,142.47

129,698.67

1,237,540.99

Amapari Energia S.A.

TPU Serra do Navio

23.28

21.0

32,592.85

4,091.86

379.46

33.19

37,097.36

Brasventos Miassaba 3 Geradora de Energia S.A

Wind Plant Miassaba 3

68.47

22.8

43,316.00

30,074.00

59,361.00

61,045.00

193,796.00

Brasventos Eolo Geradora de Energia S.A.

Wind Plant Rei dos Ventos 1

58.45

21.9

22,572.00

23,435.00

46,517.00

51,252.00

143,776.00

Rei dos Ventos 3 Geradora de Energia S.A.

Wind Plant Rei dos Ventos 3

60.12

21.1

37,238.00

30,122.00

55,427.00

51,512.00

174,299.00

*The decrease in energy generation ocurred due to the enlargement of dry season, that affects the plants energy generation.

 

Unit

Participation

%

Location

(State)

Beginning of Operation

End of

Operation

EAPSA - Energia Águas da Pedra S.A. - HPU Dardanelos

24.50

MT

Aug/11

Jul/42

Amapari Energia S.A. - TPU Serra do Navio

49.00

AP

Jun/08

May/37

Brasventos Miassaba 3 Geradora de Energia S.A

24.50

RN

May/14

Aug/45

Brasventos Eolo Geradora de Energia S.A.

24.50

RN

May/14

Dec/45

Rei dos Ventos 3 Geradora de Energia S.A.

24.50

RN

May/14

Dec/45

2.Electric energy purchased for resale

2.1.Own assets

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

-

R$ million

-

-

-

-

-

Others

MWh

209,440.8

674,258.9

1,469,886.0

1,425,430.0

3,779,015.7

R$ million

22.8

105.0

920.4

910.6

1,958.8

Total

MWh

209,440.8

674,258.9

1,469,886.0

1,425,430.0

3,779,015.7

R$ million

22.8

105.0

920.4

910.6

1,958.8

2.2.SPE

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

 

 

R$ million

-

-

-

-

-

Others

MWh

-

-

-

-

-

R$ million

-

7,830.21

29,645.69

289,600.00

327,075.90

Total

MWh

-

4.84

17.72

36.85

59.41

R$ million

-

7,830.21

29,645.69

289,600.00

327,075.90

OBS: Only SPE EAPSA purchased energy for resale

 

 

 

112


 
 

 

 

3.Energy sold

3.1.Own assets

3.1.1. Energy sold by enterprises not affected by 12,783 Law

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

44.95

328,538

52.89

337,606

51.09

350,864

57.54

386,377

204.90

1,402,162

B

61.86

321,160

105.21

562,303

82.56

452,304

92.60

515,748

342.22

1,851,516

Others

A

461.78

3,452,536

528.91

3,561,841

611.71

3,905,937

640.57

4,057,428

2.244.55

14,978,963

B

506.62

4,467,065

475.91

4,092,407

475.20

4,047,546

485.10

4,036,538

1.942.72

16,643,556

Total

A

506.73

3,781,074

581.8

3,899,446

662.8

4,256,801

698.11

4,443,805

2.449,45

16,381,125

B

568.48

4,788,225

581.11

4,654,711

557.75

4,499,850

577.70

4,552,286

2.284,94

18,495,072

A – Regulated enviroment – Revenue not from quotas

B - Through contracts in free market or bilateral contracts

3.1.2. Energy sold by enterprises affected by 12,783 Law - O&M

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

-

-

-

-

-

-

-

-

-

-

B

18.19

290,130.68

17.76

309,242.93

22.34

348,928.96

28.71

347,365

87.00

1,295,667

Others

A

-

-

-

-

-

-

-

-

-

-

B

-

-

-

-

-

-

-

-

-

-

Total

A

-

-

-

-

-

-

-

-

-

-

B

18.19

290,130.68

17.76

309,242.93

22.34

348,928.96

28.71

347,365

87.00

1,295,667

A – Regulated enviroment – Revenue from quotas

B - Through contracts in free market or bilateral contracts

3.2.SPE

Amapari

 

Buyer

Sale model

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

A

R$ Million

-

-

-

-

-

MWh

-

-

-

-

-

B

R$ Million

-

-

-

-

-

MWh

-

-

-

-

-

Others

A

R$ Million

-

-

-

-

-

MWh

-

-

-

-

-

B

R$ Million

16.88

10.26

9.43

5.33

41.9

MWh

31,145,73

3,650,48

51,43

-

34,847,64

Total

A

R$ Million

-

-

-

-

-

MWh

-

-

-

-

-

B

R$ Million

16.88

10.26

9.43

5.33

41.90

MWh

31,145.73

3,650.48

51,43

0,00

34,847.64

 In the months of Oct, Nov and Dec 2014 there was no energy sold, the billing amount informed in 4Q14 referes to the charge of tha amount determined in the contact, the generation informed is only internal consumption.

 

 

 

 

113


 
 

 

 

EAPSA

 

Buyer

Sale model

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0,00

B

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

Others

A

R$ Million

52.7

50.2

52.9

57.8

213.6

MWh

327,333.00

306,799.00

315,136.7

338,451.73

1,287,720.10

B

R$ Million

0.00

0.00

0.00

0.00

0

MWh

0

0

0

0

0

Total

A

R$ Million

52.70

50.20

52.90

57.80

213.60

MWh

327,333.00

306,799.00

315,136.37

338,451.73

1,287,720.10

B

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0,00

0,00

0,00

0,00

0,00

 

 

Miassaba 3

 

Buyer

Sale model

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

B

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

Others

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

26.1

11.5

9.6

12.2

59.40

MWh

43,316.00

30,074.00

48,180.00

61,045.00

182,615.00

Total

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

26.10

11.50

9.60

12.20

59.40

MWh

43,316.00

30,074.00

48,180.00

61,045.00

182,615.00

 

Eolo

 

Buyer

Sale model

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

B

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

Others

A

R$ Million

0

0

0

0

0

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

15.3

8.7

9.2

10.3

43.5

MWh

22,572.00

23,438.00

45,990.00

51,512.00

143,512.00

Total

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

15.30

8.70

9.20

10.30

43.50

MWh

22,572.00

23,438.00

45,990.00

51,512.00

143,512.00

 

Rei dos Ventos 3

 

Buyer

Sale model

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras System

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

B

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0

0

0

0

0

Others

A

R$ Million

0

0

0

0

0

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

23.1

11.4

9.2

10.3

54.0

MWh

37,238.00

30,122.00

45,990.00

51,252.00

164,602.00

Total

A

R$ Million

0.00

0.00

0.00

0.00

0.00

MWh

0,00

0,00

0,00

0,00

0,00

B

R$ Million

23.10

11.40

9.20

10.30

54.00

MWh

37,238.00

30,122.00

45,990.00

51,252.00

164,602.00

 

114


 
 
 

4.CCEE settlement (Spot and MRE)

 

 

Unit

1Q14

2Q14

3Q14

4Q14

2014

Net

R$ Million

689.14

12.69

-649.74

-588.58

-536.49

MWh

5,619,594.03

4,465,301.54

-625,214.59

-3,164,844.35

6,294,836.63

MWaverage

2,600.46

2,044.55

-283.16

-1,433.35

2,928.50

                                                     

5.Fuel for production of electric energy

                                                     

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

 

R$ Million

Diesel oil

litre

40,244,000

98.6

39,932,000

98.7

51,706,000

131.0

67,845,000

 

178.5

Total

40,244,000

98.6

39,932,000

98.7

51,706,000

131.0

67,845,000

 

178.5

 

6.Losses in generation - %   

 

1Q14

2Q14

3Q14

4Q14

2014

0.07

0.88

1.06

1.09

0.78

 

7.Average price– R$/MWh

 

7.1.Own assets – Entrprises not affected by 12,783 law

 

1Q14

2Q14

3Q14

4Q14

2014

125.47

135.94

139.39

141.82

135.75

 

7.1.1.Own assets– Enterprises renewed in accordance with 12,783 Law – O&M

 

1Q14

2Q14

3Q14

4Q14

2014

62.68

57.44

64.04

82.65

67.15

 

7.2.SPE

 

SPE

1Q14

2Q14

3Q14

4Q14

2014

EAPSA

160.48

163.68

168.10

170.50

662.76

Amapari

517.97

2,506.67

24,846.96

18,383.27

46,254.87

Miassaba 3

603.77

383.87

199.48

199.48

1,386.60

Eolo

677.83

372.35

200.40

200.40

1,450.98

Rei dos Ventos

620.33

377.56

200.79

200.79

1,399.47

 

8.Extension of transmission lines - Km

8.1.Own assets

 

       8.1.1.Transmission line

 

8.1.1.1. Transmission line– enterprises not affected by 12,783 Law

 

From - To

Extension

(km)

Tension

(Kv)

Beginning of Operation

End of Concession

Isolated System

-

 

 

 

Isolated System Total

-

 

 

 

Interconnected System

 

 

 

 

São Luiz II - São Luiz III

35.94

230

May/10

Mar/38

Ribeiro Gonçalves – Balsas

95.00

230

Dec/11

Jan/39

Porto Velho - Abunã - C2

188.00

230

Feb/14

Nov/39

Abunã - Rio Branco - C2

302.00

230

Jan/14

Nov/39

Lechuga/Jorge Teixeira – C1

29.54

230

Feb/14

Jul/40

Lechuga/Jorge Teixeira – C2

29.54

230

Feb/14

Jul/40

 

 

 

 

 

Sub-Total 230 kV

680.02

 

 

 

Interconnected System Total

680.02

 

 

 

Basic Network Total

 

 

 

 

Isolated + Interconnected Systrem Total

680.02

 

 

 

 

115

 
                                                                                                                 

 
 

 

 

 

8.1.1.2. Transmission line– enterprises renewed in accordance with 12,783 Law – O&M

 

From - To

Extension

(km)

Tension

(Kv)

Beginning of Operation

End of Concession

Isolated System

 

 

 

 

Boa Vista- Santa Elena

190.20

230

Jun/01

Dec/42

Sub-Total 230 kV

190.20

 

 

 

Coaracy Nunes - Santana - C1

108.00

138

Oct/75

Dec/42

Coaracy Nunes - Santana - C2

109.00

138

Feb/05

Dec/42

Santana – Portuária

4.00

138

Apr/96

Dec/42

Coaracy Nunes - Tartarugalzinho

87.00

138

Jun/00

Dec/42

Sub-Total 138 kV

308.00

 

 

 

Santana - Macapá II

20.00

69

Nov/96

Dec/42

Santana – Equatorial

13.00

69

Aug/00

Dec/42

Tartarugalzinho – Calçoene

130.00

69

Dec/01

Dec/42

Tartarugalzinho – Amapá

17.00

69

Feb/02

Dec/42

Santana - Santa Rita

12.60

69

Dec/07

Dec/42

Equatorial - Santa Rita

5.09

69

Sep/08

Dec/42

Sub-Total 69 kV

197.69

 

 

 

Isolated System Total

695.89

 

 

 

Interconnected System

 

 

 

 

Colinas – Miracema

173.97

500

Mar/99

Dec/42

Imperatriz – Colinas

342.60

500

Mar/99

Dec/42

Imperatriz – Marabá - C1

181.09

500

Apr/81

Dec/42

Imperatriz – Marabá - C2

181.82

500

Mar/88

Dec/42

Tucuruí – Marabá – C1

222.14

500

Oct/81

Dec/42

Tucuruí – Marabá – C2

221.70

500

Feb/88

Dec/42

Tucuruí - Vila do Conde

327.10

500

Dec/81

Dec/42

Tucuruí (Usina) - Tucuruí (Se)

10.71

500

Nov/84 to May/05

Jul/24

Pres. Dutra - Boa Esparança

205.39

500

Jan/00

Dec/42

Imperatriz - Pres. Dutra - C1

386.60

500

Oct/82

Dec/42

Imperatriz - Pres. Dutra - C2

385.30

500

Jan/00

Dec/42

Miranda II - S.Antonio dos Lopes

142.60

500

nov/10

Dec/42

S.Antonio dos Lopes - Pres. Dutra

52.90

500

nov/10

Dec/42

Miranda II - Pres. Dutra – C2

195.80

500

Mar/86

Dec/42

São Luiz II - Miranda II – C1

106.80

500

Jul/84

Dec/42

São Luiz II - Miranda II – C2

106.80

500

Mar/86

Dec/42

Sub-Total 500 kV

3,243.32

500

 

Dec/42

Altamira – Rurópolis

330.02

230

Oct/88

Dec/42

Guamá - Utinga - C1

19.40

230

Dec/81

Dec/42

Guamá - Utinga - C2

19.40

230

Dec/81

Dec/42

Tucuruí – Altamira

317.60

230

Jun/98

Dec/42

Utinga - Castanhal

69.27

230

Dec/94

Dec/42

Castanhal - Santa Maria

25.04

230

Dec/94

Dec/42

Vila do Conde - Guamá - C1

49.30

230

Apr/81

Dec/42

Vila do Conde - Guamá - C2

49.30

230

Dec/82

Dec/42

Marabá - Carajás

145.00

230

Oct/04

Dec/42

Carajás – Integradora - C1

83.00

230

Aug/08

Dec/42

Carajás – Integradora - C2

85.35

230

Aug/13

Dec/42

Carajás – Integradora - C3

85.35

230

Aug/13

Dec/42

Imperatriz - Porto Franco

110.10

230

Oct/94

Dec/42

São Luiz II - Miranda II

105.30

230

Nov/02

Dec/42

São Luiz II - São Luiz I - C1

18.60

230

Jan/83

Dec/42

São Luiz II - São Luiz I – C2

19.00

230

Sep/88

Dec/42

Miranda II - Peritoró

94.20

230

Dec/02

Dec/42

Pres. Dutra - Peritoró

115.00

230

Mar/03

Dec/42

Peritoró - Coelho Neto

223.00

230

Jul/06

Dec/42

Coelho Neto - Teresina

127.10

230

Sep/06

Dec/42

São Luiz II - UTE São Luiz

0.05

230

Jan/82

Dec/42

Barra Peixe – Rondonópolis – C1

217.00

230

Oct/97

Dec/42

Rondonópolis - Coxipó - C1

187.80

230

Sep/88

Dec/42

Rondonópolis - Coxipó - C2

187.80

230

Jul/84

Dec/42

Coxipó - Nobres

112.41

230

Sep/96

Dec/42

Nobres – Nova Mutum - C1

104.57

230

Sep/96

Dec/42

Nova Mutum – Lucas do Rio Verde - C1

93.80

230

Sep/96

Dec/42

Lucas do rio Verde - Sorriso C-1

52.50

230

Sep/96

Dec/42

Sinop - Sorriso C-1

86.43

230

Sep/96

Dec/42

Barra Peixe – Rondonópolis – C2

216.79

230

Mar/08

Dec/42

Rio Verde (C. Magalhães) – Rondonópolis

177.83

230

Jul/83

Dec/42

Jauru - Coxipó - C1

366.00

230

Jun/03

Dec/42

Jauru - Coxipó - C2

366.00

230

Jun/03

Dec/42

Abunã - Rio Branco

302.00

230

Nov/02

Dec/42

Ariquemes - Jarú

83.82

230

Sep/94

Dec/42

Jarú - Ji-Paraná

80.69

230

Sep/94

Dec/42

Samuel - Ariquemes

151.60

230

Aug/94

Dec/42

Samuel - Porto Velho – C1

40.55

230

Jul/89

Dec/42

Samuel - Porto Velho – C2

40.55

230

Jul/89

Dec/42

Samuel (Usina) - Samuel (SE)

2.85

230

Jul/89

Sep/29

Porto Velho - Abunã

188.00

230

May/02

Dec/42

Ji-Paraná - Pimenta Bueno

117.80

230

Jun/08

Dec/42

Pimenta Bueno – Vilhena

160.20

230

Oct/08

Dec/42

Sub-Total 230 kV

5,427.37

 

 

 

Tucuruí-Vila - Cametá

214.21

138

Aug/98

Dec/42

Curuá-Uma - Tapajós-Celpa

68.80

138

Jan/06

Jul/28

Coxipó - São Tadeu

44.17

138

Jul/81

Dec/42

São Tadeu - Jaciara

77.92

138

Jul/81

Dec/42

Jaciara - Rondonopolis-Cemat

70.00

138

Jul/81

Dec/42

Couto Magalhães - Rondonopolis-Cemat

176.00

138

Apr/81

Dec/42

Sub-Total 138 kV

651.10

 

 

 

Tucuruí - Tucuruí Vila

2.30

69

Jul/97

Dec/42

Tucuruí (Usina) - Tucuruí (SE)

1.40

69

Jan/80

Dec/42

Tucuruí (Usina) - Tucuruí (SE)

1.40

69

Dec/85

Dec/42

Sub-Total 69 kV

5.10

 

 

 

Interconnected System Total

9,326.89

 

 

 

Total

10,022.78

 

 

 

Basic Network Total

 

 

 

 

General Total

10,702.80

 

 

 

 

116


 
 

 

 

 

8.1.2.Substation

 

8.1.2.1. Substation– enterprises not affected by 12,783 Law

 

Substation

Transformation capacity (MVA)

Location

Beginning of Operation

End of Operation

 

 

 

 

 

Ribeiro Gonçalves

350.00

Maranhão

Dec/11

Jan/39

Balsas

100.00

Maranhão

Dec/11

Jan/39

São Luis III

300.30

Maranhão

May/10

Mar/38

Miranda II (ATR1)

450.00

Maranhão

Nov/10

Jan/39

Lucas do Rio Verde

75.00

Mato Grosso

Apr/13

Jun/41

Nobres

200.00

Mato Grosso

Sep/13

Dec/41

Tucuruí

200.00

Pará

Dec/14

Dec/41

Total

1,675.30

 

 

 

 

 

SPE

Substation

Transformation Capacity (MVA)

Participation

(%)

Beginning of Operation

End of Operation

Estação Transmissora de Energia S.A.

(Shraes tranferred to Eletrobras Eletronorte - ANEEL Ordinance 3,532, from11/23/2010)

Converter Station 01 CA/CC, 500/±600 KV and Inverter Station 01 CC/CA,

±600/500 kV

7,295.20

100.00

Mar/13

Feb/39

 

117


 
 

 

 

8.1.2.2. Substation– enterprises renewed inaccordance with 12,783 Law –O&M

 

Substation

Transformation Capacity (MVA)

Location

Beginning of Operation

End of Operation

 

 

 

 

 

Altamira

120.30

Pará

Jun/98

Dec/42

Cametá

23.55

Pará

Aug/98

Dec/42

Carajás

0.30

Pará

Nov/06

Dec/42

Guamá

454.00

Pará

Dec/81

Dec/42

Marabá

1,063.80

Pará

Out/81

Dec/42

Rurópolis

200.60

Pará

Dec/98

Dec/42

Santa Maria

500.15

Pará

Sep/95

Dec/42

Tucuruí

619.00

Pará

Out/81

Dec/42

Transamazônica

60.30

Pará

Dec/98

Dec/42

Tucuruí-Vila

58.44

Pará

Jun/99

Dec/42

Utinga

602.00

Pará

Dec/81

Dec/42

Vila do Conde

3,549.40

Pará

Dec/81

Dec/42

São Luis I

401.73

Maranhão

Dec/82

Dec/42

São Luis II

2,829.00

Maranhão

Dec/82

Dec/42

Miranda II

500.60

Maranhão

Jun/98

Dec/42

Peritoró

300.11

Maranhão

Dec/82

Dec/42

Presidente Dutra

721.03

Maranhão

Dec/82

Dec/42

Coelho Neto

130.00

Maranhão

Jan/00

Dec/42

Imperatriz

1,842.17

Maranhão

Dec/82

Dec/42

Porto Franco

266.50

Maranhão

Feb/94

Dec/42

Colinas

1.50

Tocantins

Mar/99

Dec/42

Miracema

362.50

Tocantins

Mar/99

Dec/42

Barra do peixe

150.60

Mato Grosso

Nov/93

Dec/42

Couto Magalhães

15.11

Mato Grosso

Oct/81

Dec/42

Coxipó

571.20

Mato Grosso

Jul/87

Dec/42

Jauru

600.45

Mato Grosso

Jun/03

Dec/42

Nova Mutum

60.60

Mato Grosso

Sep/96

Dec/42

Rondonopolis

200.90

Mato Grosso

Jul/83

Dec/42

Sinop

356.00

Mato Grosso

Sep/96

Dec/42

Sorriso

60.60

Mato Grosso

Sep/96

Dec/42

Epitaciolândia

22.10

Acre

Mar/08

Dec/42

Sena Madureira

18.75

Acre

Oct/08

Dec/42

Rio Branco

422.95

Acre

Nov/12

Dec/42

Ariquemes

120.30

Rondônia

Aug/94

Dec/42

Ji-Paraná

380.60

Rondônia

Sep/94

Jan/42

Porto Velho

525.60

Rondônia

Jul/89

Dec/42

Abunã

110.60

Rondônia

May/02

Dec/42

Samuel

0.30

Rondônia

Jul/89

Dec/42

Pimenta Bueno

110.60

Rondônia

Jun/08

Dec/42

Vilhena

120.60

Rondônia

Oct/08

Dec/42

Jaru

30.15

Rondônia

Sep/97

Dec/42

Coaracy Nunes

40.08

Amapá

Nov/75

Dec/42

Portuária

20.05

Amapá

Apr/96

Dec/42

Amapá

10.08

Amapá

Dec/01

Dec/42

Tartarugalzinho

40.22

Amapá

Jun/00

Dec/42

Calçoene

10.08

Amapá

May/02

Dec/42

Santana

120.45

Amapá

Oct/75

Dec/42

Santa Rita

80.03

Amapá

Dec/07

Dec/42

Equatorial

79.95

Amapá

Aug/00

Dec/42

Macapá II

53.43

Amapá

Nov/96

Dec/42

Boa Vista

201.65

Roraima

Jul/01

Dec/42

Total

19,140.99

 

 

 

 

 

 

 

 

General Total

20,616.29

 

 

 

         

 

 

118


 
 

 

 

8.2.SPE

 

8.2.1.Transmission Lines

 

SPE

From – To

Participation

%

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

AETE - Amazônia Eletronorte Transmissora de Energia S.A.

Coxipó-Cuiabá-Rondonópolis (MT), SS Seccionadora Cuiabá

49.00

193

230

Aug/05

Feb/34

INTESA - Integração Transmissora de Energia S.A.

Colinas-Miracema-Gurupi-Peixe Nova-Serra da Mesa 2 (TO / GO)

37.00

695

500

May/08

Apr/36

BRASNORTE Transmissora de Energia S.A.

Jauru - Juba – C2 (MT) and Maggi - Nova Mutum (MT), SS Juba and SS Maggi - 230/138 kV

49.71

402

230

Sep/09

Mar/38

Transmissora Matogrossense de Energia S.A. – TME

TL Jauru / Cuiabá, in 230 kV, Mato Grosso

49.00

348

500

Nov/11

Nov/39

Manaus Transmissora de Energia S.A.

Oriximiná - Silves - Lechuga (AM), SS Silves (ex-Itacoatiara) andSS Lechuga (ex-Cariri)

30.00

559

500

Mar/13

Oct/38

Norte Brasil Transmissora de Energia S.A.

Coletora Porto Velho (RO) - Araraquara (SPE)

24.5

2,375

600

Nov/14

Feb/39

Isolated System Total

 

 

-

 

 

 

Basic Network Total

 

 

4,572.00

 

 

 

Isolated System Total + Basic Network

 

 

4,572.00

 

 

 

 

8.2.2.Substation

 

SPE

Substation

Transformation Capacity (MVA)

Participation

(%)

Beginning of Operation

End of Operation

AETE - Amazônia Eletronorte Transmissora de Energia S.A.

SS Seccionadora Cuiabá

-

 

49.00

Aug/05

Feb/34

BRASNORTE Transmissora de Energia S.A.

SS Juba and SS Maggi - 230/138 kV

300 and 100

 

49.71

Sep/09

MAr/38

Manaus Transmissora de Energia S.A.

SS Silves (ex-Itacoatiara) e SE Lechuga (ex-Cariri)

150 and 1,800

30.00

Mar/13

Oct/38

INTESA - Integração Transmissora de Energia S.A.

SS Peixe 2 and SS Serra da Mesa 2

-

37.00

May/08

Apr/36

Transmissora Matogrossense de Energia S.A. – TME

SS Jauru 500/230 kV

750

49.00

Nov/11

Nov/39

 

 

9.Transmission losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

1.57

1.69

1.10

0.88

1.35

 

10.Main investments of parent company – R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

Budget 2014

Generation

2,629,923

3,429,508

2,132,716

2,600,670

10,792,817

27,338,182

HPU Coaracy 2nd stage

0

362,617

174,288

217,736

754,641

1,500,000

Generation system maintenance

2,627,370

2,814,360

1,748,618

2,159,152

9,349,500

24,038,182

HPU Curuá-Una

2,553

252,531

209,810

223,781

688,676

1,500,000

Extension of Generation System

0

0

0

0

0

300,000

Transmission

57,356,010

58,454,858

85,982,513

147,753,604

349,546,986

518,614,623

TL Implementation Rio Branco - Cruzeiro do Sul

24,804,046

6,072

5,973,703

7,895,478

38,679,299

83,000,000

Reinforcement of the Isolated System

1,170,468

2,883,119

5,653,184

5,887,137

15,593,908

19,110,000

ST Implementation Porto Velho - Rio Branco

0

0

0

0

0

200,000

Implementation of Grinding Station Porto Velho

0

0

0

6,195,796

6,195,796

35,000,000

Implementation of Inverting Station Araraquara 2

0

0

0

6,195,796

6,195,796

35,000,000

ST Norte/Nordeste MA

49,692

360,577

1,835,528

2,517,365

4,763,162

5,000,000

Transmission System Maintenance

1,770,738

4,095,528

11,275,266

14,997,007

32,138,539

45,000,000

Interconnected System Improvement

29,561,066

51,109,562

61,244,832

104,065,026

245,980,485

296,304,623

Others

1,578,315

3,993,509

4,522,335

8,268,754

18,362,912

54,308,195

Preservation and conservation

1,074,447

2,897,141

2,637,378

3,877,121

10,486,087

36,740,195

Infrastructure

0

0

0

0

0

500,000

Infrastructure

849

83,658

20,180

49,770

154,457

500,000

Infrastructure

57,019

566,710

1,864,777

4,341,863

6,830,369

15,000,000

Headquarters

446,000

446,000

0

0

892,000

1,568,000

Total

61,564,248

65,877,875

92,637,564

158,623,028

378,702,715

600,261,000

 

119


 
 

 

 

 

11.New investments

 

11.1.Generation

 

11.1.1.Own assets– N/A

 

11.1.2.SPE

 

SPE

 Unit 

Location

(State)

Installed Capacity (MW)

Assured Energy (MW)

Beginning of Operation

Beginning of Construction

End of Concession

Norte Energia S.A.

HPU Belo Monte

PA

11,233

4,571.0

Nov/15

Aug/11

Aug/45

Cia. Energética Sinop S.A.

HPU Sinop

MT

400

239.8

Jan/18

Dec/13

Feb/49

 

11.1.2.1. SPE

 

SPE

 Unit 

Investiment

(R$ million)

Working Schedule (%)

Patricipation

(%)

Partners

Total

Up to 4Q14

Norte Energia S.A.

HPU Belo Monte

29,375.00

16,769.90

65.4

19.98

ELETROBRAS - 15% / CHESF - 15% / PRIVATES – 50.02%

Cia. Energética Sinop S.A.

HPU Sinop

1,804.81

244.06

13.7

24.50

CHESF – 24.5% / EDFNT - 51%

 

11.2.Transmission

 

11.2.1.Own assets

 

11.2.1.1.Transmission lines

 

From - To

Investiment

(R$ million)

Extension

of lines

(Km)

Tension

Beginning of Operation

End of Concession

Total

Up to 4Q14

Jorge Teixeira – Lechuga (AM) TL H

49.7

45.4

30

230

Feb/14

Jul/40

Jorge Teixeira – Lechuga (AM) SS Lechuga (auction 02/12

70.2

60.9

30

230

May/14*

May/42

*The TL is concluded and available to start Operationsince May/14. But, the conclusion forecast for the substation associated is Mar/15, when the groupmight be energized, becoming into Operation.

Pricing basis Dec/14 – Source: BW

 

120


 
 

 

 

11.2.1.2.Substations – N/A

 

11.2.2.SPE

 

11.2.2.1.Transmission lines

 

SPE

From-To

Participation

(%)

Investiment

(R$ million)

Extension

of lines (Km)

Tension

Beginning of Operation

End of Concession

Total

Up to 4Q14

Linha Verde Transmissora de Energia S.A.

Porto Velho (RO) – Samuel (RO) – Ariquemes (RO) - Ji-Paraná (RO) - Pimenta Bueno (RO) – Vilhena (RO) – Jauru (MT)

49.00

824.36

526.36*

987

230

Mar/15

Nov/39

Transnorte Energia S.A.

Eng. Lechuga (AM) - Equador (RR) and Equador (RR) - Boa Vista (RR), Double circuitandSS Equador (RR) Boa Vista (RR)

49.00

1,174.53

238.75

715

500

TL: Dec/16

Jan/42

CE: Feb/15

Belo Monte Transmissora de Energia S.A.

Converter Station CA/CC, ±800 kV, 4,000 MW, withSS 500 kV Xingu;
Converter Station CA/CC, ±800 kV, 3,850 MW, with SS 500 kV Estreito; and
Continuos current transmission line ±800 kV Xingu - Estreito.

24.50

5,049.00

-

2,092

±800

Feb/18

Jun/44

 

121


 
 

 

 

11.2.2.2.Substations – N/A

 

12.Loans and financing – R$ million

 

Local currency – LC

 

Creditor

Balance 03.31.14

Balance 06.30.14

Balance 09.30.14

Balance 12.31.14

Due Date

Index

Eletrobras ECF-2092/01

207.97

202.63

197.30

191.97

12/30/2023

RGR+8.42%p.y.

Eletrobras ECF-2272/02

317.37

298.33

279.29

260.24

05/30/2018

RGR+7% p.y..

Eletrobras ECF-2273/02

71.20

66.12

61.03

55.95

09/30/2017

RGR+7% p.y.

Eletrobras ECF-2710/08

7.95

7.00

6.04

5.09

04/30/2016

RGR+7% p.y.

Eletrobras ECF-2757/09

127.72

125.40

122.15

119.32

06/30/2021

IPCA+7%p.y.

Eletrobras ECF-2758/08

25.08

24.62

23.98

23.43

06/30/2021

IPCA+7% p.y.

Eletrobras ECF-2794/09

1,531.55

1,520.72

1,474.04

1.454.92

12/30/2029

IPCA+7% p.y.

Eletrobras ECF-2818/10

69.90

68.69

66.94

65.77

10/30/2021

IPCA+7% p.y.

Eletrobras ECF-2934/11

383.89

382.47

377.43

375.87

01/30/2023

IPCA+7% p.y..

Eletrobras ECF-3038/13

72.87

72.90

72.87

72.93

07/30/2020

SANDLIC

BNDES-03.2.782.3.1

255.06

229.64

204.17

178.69

09/15/2016

TJLP+3.5 % p.y.

BNDES-09.02.1355.1

30.24

29.28

28.34

27.40

11/15/2024

TJLP+2.5% p.y.

BNDES-10.20.2677

10.43

10.19

9.94

9.70

11/15/2024

TJLP+2.5% p.y.

Banco do Brasil

7.72

7.20

6.70

6.20

01/01/2018

8.5 % p.y.

Banco do Nordeste

67.64

66.53

65.58

64.68

06/03/2031

8.5% p.y.

Banco do Brasil

6.54

6.55

6.55

6.56

12/01/2026

8.5% p.y..

Banco da Amazônia

24.26

23.72

23.33

22.94

01/01/2029

8.5% p.y.

BNDES-11.2.13181.1

136.62

134.00

131.41

128.80

03/15/2027

TJLP+2.12% and 1.72%p.y.

BNDES-11.2.0281.-ETE

496.32

490.98

482.56

474.06

11/15/2028

TJLP+2.12 p.y.

BANCO DA AMAZÔNIA-ETE

242.10

222.99

244.77

241.52

07/10/2031

8.5% p.y.

BASA-043.11/0029-2-DEBENDURES

-

222.99

226.53

219.42

10/15/2031

TJLP+1.5%p.y.

BNDES-13.2.0672.1

-

-

17.21

17.07

10/15/2028

TJLP+3.05% and 3.05% p.y.

BNDES-13.2.0673.1

-

-

14.98

14.67

08/15/2028

TJLP+3.05% and 3.05% p.y.

BNDES-13.2.0679.1

-

-

4.45

4.35

03/15/2028

TJPL+3.05% and 3.05% p.y.

 

Foreign currency – FC

 

Creditor

Balance 03.31.14

Balance 06.30.14

Balance 09.30.14

Balance 12.31.14

Due Date

Index

Eletrobras ECR-257/97– BID

350.65

319.61

363.51

367.94

04/06/2025

US$+6.83%p.y.

Eletrobras ECR-259/98 – CAF

18.07

17.77

13.05

14.29

08/04/2015

Libor+3.58%p.y

Eletrobras ECR – 260/98– Eximbank

144.98

135.79

141.09

132.49

04/06/2025

Yen+3.5 % p.y.

Credit National 121/0118

0.00

0.00

0.00

0.00

12/31/2016

EUR+3.5% p.y.

Credit National 121/0122

0.04

0.03

0.03

0.01

12/31/2016

EUR+3.5% p.y.

D.M.L.P – National Treasure

0.47

*

*

*

04/15/2014

US$+8% p.y.

* The contract has ended on 04.30.2014.

 

 

122


 
 

 

 

13.Contracts

 

13.1.Loans and financing – R$ million

 

13.1.1.Parent company

 

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total (LC + FC)

By activity

 

 

 

 

 

 

 

 

Generation

299.53

286.18

218.02

178.17

153.08

155.44

1,175.04

2,465.46

Transmission

190.68

187.93

182.00

166.53

166.31

153.31

1,029.76

2,076.52

Energy tradings

14.29

   

 

 

 

 

14.29

By creditor

 

 

 

 

 

 

 

 

Eletrobras

311.86

309.45

309.13

255.86

230.93

224.05

1,396.60

3,037.88

Others

192.64

164.66

90.89

88.84

88.46

84.70

808.20

1,518.39

 

13.1.2.SPE

 

Enterprise

Creditor

Amount - End of Peeriod

2015

2016

2017

Brasnorte Transmissora de Energia S.A. (short term)

CEF

10,833,333.33

5,416,666.67

-

Norte Brasil Transmissora de Energia S.A. (long term)

BNDES

855,431,217.46

735,325,865.10

628,319,490.20

Norte Brasil Transmissora de Energia S.A. (long term)

Debentures

247,703,619.30

266,148,619.30

283,412,876.00

Linha Verde Transmissora S.A. (long term)

BASA

196,557,491.05

201,432,202.32

194,787,280.36

Manaus Transmissora de Energia S.A. (long term)

BASA (FNO)

347,641,941.05

325,333,399.13

303,024,857.22

BASA (FDA)

160,353,661.31

158,572,584.12

155,729,808.12

BNDES

344,974,811.25

313,476,638.24

282,057,680.59

Transmissora Matogrossense de Energia. S.A. (long term)

BANCO DO BRASIL (FCO)

81,263,264.36

75,459,007.28

69,258,379.45

BNDES

65,193,967.43

58,935,346.53

52,676,725.66

Brasventos Eolo Geradora de Energia S.A. (long term)

BNDES

114,877,990.94

106,573,557.86

98,269,124.78

Brasventos Miassaba 3 Geradora de Energia S.A. (long term)

BNDES

115,653,041.62

107,292,580.78

98,932,119.94

Rei dos Ventos 3 Geradora de Energia S.A.(long term)

BNDES

121,069,800.90

112,317,767.10

103,565,733.30

Norte Energia S.A. - TPU Belo Monte (long term)

BNDES

10,708,361,397

11,481,695,346

11,967,673,372

Norte Energia S.A. - TPU Belo Monte (long term)

CEF

5,672,747,566

6,135,076,493

6,473,226,581

Norte Energia S.A. - TPU Belo Monte (long term)

BTG

1,620,784,611

1,752,878,557

1,849,492,832

Transnorte Energia S.A.(bonds)

Itau BBA

-

-

 

 

14.Number of employees  

 

14.1.By tenure

 

Generation

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

21

18

19

5

6 to 10

236

239

240

236

11 to15

18

18

17

17

16 to 20

18

17

18

18

21 to 25

121

121

117

107

beyond 25

186

187

188

160

Total

600

600

599

543

 

 

123


 
 

 

 

Transmission

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

72

42

37

13

6 to 10

327

356

358

442

11 to15

57

57

60

60

16 to 20

42

42

41

49

21 to 25

159

158

157

174

beyond 25

446

447

444

491

Total

1,103

1,102

1,097

1,229

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

77

64

38

18

6 to 10

503

516

527

504

11 to15

8

8

9

9

16 to 20

16

16

15

8

21 to 25

304

301

298

286

beyond 25

458

462

462

436

Total

1,366

1,367

1,349

1,261

 

14.2.By region

 

State

1Q14

2Q14

3Q14

4Q14

Acre

133

133

134

135

Amazonas

11

12

14

14

Amapá

170

170

169

168

Maranhão

348

348

347

345

Mato Grosso

197

198

199

196

Pará

454

450

449

444

Rondônia

237

237

236

231

Roraima

48

48

48

48

São Paulo

37

36

36

37

Tocantins

54

54

54

53

Tucuruí

278

279

277

276

Distrito Federal

1,102

1,104

1,082

1,086

Total

3,069

3,069

3,045

3,033

 

14.3.By departments

 

Department

1T14

2T14

3T14

4T14

Administrative

1,031

1,702

1,696

1,261

Field

2,493

1,367

1,349

1,772

Total

3,524

3,069

3,045

3,033

 

15.Complementary work force

 

Operational

1Q14

2Q14

3Q14

4Q14

Personnel

380

399

394

382

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

0.23

0.05

0.29

0.28

124


 
 

 
 

Balance Sheet

(R$ thousand)

 

 

Assets

12.31.14

12.31.13

Current Assets

 

 

Availabilities

18,361

6,917

Clients (Consumers and Resellers)

254,200

107,608

Loans and Financing

-

-

Marketable securities

81,680

33,190

Deferred Fiscal Assets (Taxes and Contribution)

17,682

44,756

Income tax and Social Contribution

55,916

25,669

Reimbursement Right - CCC (12,111 Law)

-

-

Stored Material

57,564

129,133

Storage of Nuclear fuel

340,319

343,730

Financial Asset

-

-

Other

33,221

39,165

 

858,943

730,168

Non-Current Assets

 

 

Clients (Consumers and Resellers)

-

-

Loans and Financing

-

-

Marketable securities

-

-

Deferred Fiscal Assets (taxes and Contributions)

-

-

Income tax and Social Contribution

-

-

Reimbursement Right – CCC (12,111 law)

-

-

Linked deposits

60,206

45,650

Stored Nuclear fuel

661,489

507,488

Other

364,955

303,881

Advance for equity participation

-

-

 

1,086,650

857,019

Investment

-

-

Fixed Asset

10,511,388

9,263,371

Intangible

58,139

48,344

Non-Current Assets Total

11,656,177

10,168,734

Total Assets

12,515,120

10,898,902

 

 

125


 
 
 

 

 

 

Liabilities and Stockholders’ Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

403,163

159,114

Loans and financing - Principal

1,088,456

257,141

Loans and financing - Charges

12,924

6,183

Taxes and social contributions

51,423

67,363

Income tax and Social Contribution

-

-

Advance from clients (Energy sell in advance)

-

-

Remuneration to Shareholders (dividends to pay)

-

-

Estimated Obligations

271,099

76,878

Provision for contingencies

-

-

Post-employment benefits (Complementary Pension Fund)

11,832

8,587

Onerous Contracts

-

-

Sector charges (regulatory taxes)

-

-

Incentive to personnel retirement

31,649

49,857

Others

115,665

59,933

 

1,986,211

685,056

Non-Current Liabilities

 

 

Suppliers

-

-

Loans and Financing - Principal

4,044,862

2,964,709

Taxes and Social Contribution

-

-

Income tax and Social Contribution

-

-

Advance from Clients

-

-

Estimated Obligations

60,003

-

Provision for Contingencies

155,408

95,004

Provision for onerous contaract

-

-

Post-Employment Benefit (Complementary Pension Fund)

47,929

44,135

Leasing

-

-

Sectorial Charges (regulatory taxes)

-

-

Demobilization of asset obligation

1,314,480

1,136,342

Advance for future capital increase

-

-

Others

109,752

139,159

 

5,732,434

4,379,349

Stockholders’ Equity

 

 

Social capital

6,607,258

6,607,258

Capital Reserves

-

-

Profit Reserves

-

-

Additional Proposed Dividend

-

-

Accrued profit/losses

-1,759,129

-758,527

Other comprehensive income

-51,654

-14,234

Non-controlling shareholders participation

-

-

Stockholders’ Equity Total

4,796,475

5,834,497

Total Liabilities and Stockholders’ Equity

12,515,120

10,898,902

 

 

 

 

126


 
 

 

 

Statement of Income

(R$ thousand) 

 

 

12.31.14

12.31.13

Operating Revenue

   

Supply

2,192,242

1,941,502

Other Operating Revenue

220

233

Deductions to the Revenue

-265,700

-223,736

Net Operating Revenue

1,926,762

1,717,999

.

   

Operating Costs

   

Charges over the use of electric grid

-65,867

-53,807

Fuel for electric energy production - CCC

-308,605

-298,790

Operating expenses

   

Personnel, Material and Third-part related Service

-1,114,032

-869,639

Depreciation and Amortization

-360,440

-344,604

Donations and Contributions

-

-

Provisions

-682,299

-657,114

Realignment Headcount Plan

-219,299

-

Others

-70,419

-84,685

Operating Cost and Expenses

-2,820,961

-2,308,639

Operating Result before Financial Result

-894,199

-590,640

Financial result

-83,859

-72,576

Income before Income tax and Social Contribution

-978,058

-663,216

.

   

Current Income tax and Social contribution

-22,544

-6,906

Deferred Income tax and Social Contribution

-

-18,413

Net income for the period

-1,000,602

-688,535

 

 

127


 
 

 

 

Cash Flow

(R$ thousand)

 

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Profit/Loss before income tax and social contribution

-978,058

-663,216

Depreciation and amortization

360,440

344,604

Net monetary and currency variations

-3,245

31,966

Financial charges

46,501

37,108

Equity Equivalency Result

0

0

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

0

0

Provision for contingencies

60,218

21,791

Provision for staff realignment

219,299

0

Impairment

557,834

532,509

Global reversal reserve charges

0

0

Adjustment to present value / market value

79,145

46,226

Minority Participation in the Results

0

0

Charges on shareholders funds

0

0

Revenue of financing assets - IRR

0

0

Derivative financial instruments

0

0

Others

354,532

377,050

Variation in operating assets / liabilities

-407,578

-354,698

Cash generated in operating activities

289,088

373,340

 

   

Financial charges paid

-96,155

-75,558

Payment of global reversal reserve charges

0

0

Financial charges received

0

0

Remuneration received from equity participation

0

0

Financial asset revenue by RAP

0

0

Receiving compensation for financial asset

0

0

Payment of income tax and social contribution

-55,916

-50,988

Payment of pension fund

0

0

Lawsuits payment

0

0

Legal deposits

-20,509

-3,373

Net cash operating activities

116,508

243,421

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

1,785,433

739,969

Loans and financing payable – principal

-51,929

-59,116

Payment of Shareholders remuneration

0

0

Payment on refinancing of taxes and contributions - Principal

0

0

Receipt of Advance for future Capital Increase

0

0

Others

0

0

Net financing activities

1,733,504

680,853

 

   

INVESTMENT ACTIVITIES

   

Acquisition of fixed asset

-1,767,433

-1,512,129

Acquisition of intangible asset

-20,326

-17,776

Acquisition of Concession asset

0

0

Advance for future capital increase

0

0

Acquisition of equity participation

0

0

Others

-50,809

481,194

Net cash investment activities

-1,838,568

-1,048,711

 

   

Increase (decrease) in cash and cash equivalent

11,444

-124,437

 

   

Cash and cash equivalent – beginning of period – 12/31/13

6,917

131,354

Cash and cash equivalent – end of period – 12/31/14

18,361

6,917

 

11,444

-124,437

 

 

 

128


 
 
 
Analysis of the result

 

4Q14 x 3Q14

 

The Company presented the 4Q14 a result 3,100.8% lower than the one reported in the previous quarter, from a net profit of R$ 17.3 million in 3Q14 to a net loss of R$ 520.5 million in 4Q14, mainly due to factors described below.

 

Operating Revenue

 

In generation:

 

The electric energy supply increased by 10.5%, from R$ 519.4 million in 3Q14 to R$ 573.8 million in 4Q14, mainly due to the higher amount of energy sold in the period.

 

Operating Expense

 

The personnel expenses, materials and third-part related services increased by 8.6%, from R$ 311.6 million in 3Q14 to R$ 338.3 million in 4Q14, mainly due to expenses related to the early retirement program occurred in the period with the dismissals.

 

The fuel for electric energy production increased by 42.4% from R$ 61.9 million in 3Q14 to R$ 88.1 million in 4Q14, mainly due to higher energy generation in 4Q14.

 

The expenditures with the Early Retirement Program increased by 62.5%, from R$ 53 million in 3Q14 to R$ 86.1 million in 4Q14, mainly due to the greater quantity of employees off the 4Q14.

 

The operational provisions increased by 5,038%, from a provision of R$ 12.2 million in 3Q14 to a provision of R$ 602 million in 4Q14, mainly due to the register of impairment related to plant Angra 3 in the amount of R$ 558 million.

 

Financial Result

 

The debt charges increased by 164.4%, from R$ 8.1 million in 3Q14 to R$ 21.4 million in 4Q14, mainly due to new loans from Eletrobras.

 

The net exchange rate changes increased by 2,070.8%, from R$ 2.2 million in 3Q14 to R$ 48.6 million in 4Q14, mainly due to the appreciation of the dollar that positively impacted the advance purchase of equipment held by the company.

 

 

129


 
 

 

 

Market Data

1.Generation Assets and Energy generated

 

 

Unit

Installed Capacity (MW)

Guaranteed energy (Avg MW)

Energy generated (MWh)

Total 2014

1Q14

2Q14

3Q14

4Q14

Angra I

640

509,8

1,299,694

842,821

1,427,505

1,419,553

4,989,573

Angra II

1,350

1,204.7

2,939,049

2,926,158

1,586,080

2,992,387

10,443,674

Total

1,990

1,714.5

4,238,744

3,768,980

3,013,586

4,411,940

14,433,249

 

Unit

Location (State)

Beginning of Operation

End of Concession = Useful EconomicLife

Angra I

Rio de Janeiro

Jan/85

Dec/24

Angra II

Rio de Janeiro

Sep/00

Aug/39

 

2.Electric energy purchased for resale  - N/A

 

3.Energy sold

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

 

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

-

-

-

-

-

-

 

 

 

 

B

15.8

109,906

15.4

97,531

14.7

77,873

16.8

114,113

62.7

399,423

Others

A

-

-

-

-

-

-

 

 

 

 

B

542.3

3,765,422

526.6

3,341,422

504.6

2,667,960

581.0

3,939,555

2,154.5

13,714,359

Total

A

-

-

-

-

-

-

 

 

 

 

B

558.1

3,875,328

542

3,438,953

519.3

2,745,833

597.8

4,053,668

2,217.2

14,113,782

                         

A - Through auction

B - Through free market agreements or bilateral contracts

 

 

4.CCEE settlement (Spot and MRE) – N/A

 

5.Fuel used to produce electricity

 

Type

1Q14

2Q14

3Q14

4Q14

2014

Kg

R$ Million

Kg

R$

Million

Kg

R$

Million

Kg

R$

Million

Kg

R$

Million

Uranium

72,101

85.1

59,990

73.5

56,551

61.9

67,030

88.1

255,672

308.6

 

6.Losses in generation - %

 

1Q14

2Q14

3Q14

4Q14

2014

2.11

2.38

2.12

2.03

2.09

 

7.Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

143.76

157.69

189.12

147.33

157,09

 

8.Extension of transmission lines - Km – N/A


9.Transmission losses - % - N/A

 

 

130


 
 

 

 

10.Main investments– R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

Budget 2014

Generation

 

 

 

 

 

Angra 1 and 2 (Maintenance)

29,735.3

36,269.5

58,567.0

68,703.7

405,743.7

Angra 3

155,198.4

532,649.9

279,737.9

808,934.1

2,110,817.6

Others*

9,602.7

2,355.7

2,291.5

2,996.3

45,253.6

Total

194,536.4

571,275.1

340,596.4

880,634.1

2,561,814.9

 

11.New investments

 

Generation

 

Unit

Location

(State)

Investiment

(R$ million)

Installed capacity - MW

Guaranteed energy (MW)

Beginning of Operation

Beginning

of construction

End of Concession

Total

Up to 4Q14

Angra 3

RJ - Angra dos Reis

14,882 **

5,912.3

1,405

1,214.2

Dec/18

Jul/08

Dec/58*

* There is no Operation license yet for Angra 3. 40 years the same for Angra 2.

** Only direct costs

 

12.Loans and financing – R$ million

 

Local currency – LC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Date Due

Index

Eletrobras

1,083.6

1,062.2

1,048.0

1,033.9

01.30.2038

5%p.y./UFIR

Eletrobrás

-

-

-

445.4

09.30.2022

119.5% Tax DI Over

BNDES

2,118.8

2,260.6

2,358.3

2,629.5

06.15.2036

1.72%p.y.+TJLP

CEF

264.0

760.8

773.6

1,037.4

06.30.2015

6.7% p.y.

 

Foreign currency – FC– N/A

 

13.Contracts

 

13.1.Loans and financing – R$ million

 

 

Loans and financing

2015

2016

2017

2018

2019

2020

After2020

Total

(LC + FC)

By activity

1,101.2

99.9

180.2

212.6

220.6

226.6

3,105.1

5,146.2

Generation

1,101.2

99.9

180.2

212.6

220.6

226.6

3,105.1

5,146.2

By creditor

1,101.2

99.9

180.2

212.6

220.6

226.6

3,105.1

5,146.2

Eletrobras

56.6

65.9

108.4

135.7

138.1

138.1

836.5

1,479.3

BNDES

7.2

34.0

71.8

76.9

82.5

88.5

2,268.6

2,629.5

CEF

1,037.4

-

-

-

-

-

-

1,037.4

 

131


 
 

 

 

14.Number of employees

 

14.1.By tenure

 

Generation 

 

Tenure in years

1Q14

2Q14

3Q14

4Q14

Up to 5

397

416

412

399

6 to 10

345

351

330

322

11 to15

304

306

337

348

16 to 20

166

166

165

160

21 to 25

126

126

117

84

beyond 25

504

501

449

394

Total

1,842

1,866

1,810

1,707

 

Administration

 

Tenure in years

1Q14

2Q14

3Q14

4Q14

Up to 5

148

149

147

146

6 to 10

137

139

136

133

11 to15

59

60

66

68

16 to 20

10

11

11

11

21 to 25

79

79

65

35

beyond 25

280

282

245

163

Total

713

720

670

556

 

14.2.By region

 

State

Number of employees

1Q14

2Q14

3Q14

4Q14

Rio de Janeiro

2,550

2,581

2,475

2,261

Distrito Federal

05

05

05

02

 

14.3.By departments

 

Departments

Number of employees

1Q14

2Q14

3Q14

4Q14

Field

1,842

1,866

1,810

1,707

Administrative

713

720

670

556

 

15.Complementary work force - N/A

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.0043

0.0081

0.0284

0.0505

0.0919

 

 

132


 
 

 

 

Balance Sheet  

(R$ thousand)

 

Assets

Consolidated

12.31.14

12.31.13

Current Assets

   

Availabilities

26,960

773,711

Clients (Consumers and resellers)

188,497

246,241

Financing and Loans

1,400

1,339

Marketable Securities

143,798

-

Dividends to Receive (Remuneration from equity participations)

4,715

2,057

Fiscal Assets Deferred (Taxes and Contributions)

17,340

28,675

Income Tax and Social Contribution

39,260

41,407

Linked Deposits

127,739

25,671

Stored Material

35,133

35,745

Financial Asset

64,349

62,760

Receivable 12,783/13 Law

420,730

391,107

Others

100,800

64,674

Total Current Assets

1,170,721

1,673,387

.

   

Non-Current Assets

   

Clients (Consumers and resellers)

521,710

374,261

Financing and Loans

4,113

5,375

Marketable Securities

174

143

Fiscal Assets Deferred (Taxes and Contributions)

28,738

25,901

Income Tax and Social Contribution

-

161,226

Derivatives

-

-

Reimbursement Rights – CCC (12,111 law)

-

-

Linked Deposits

155,209

139,224

Financial Asset – Annual Allowed Revenue (transmission)

2,087,925

2,088,177

Receivables 12,783/13 Law

-

228,146

Others

101,756

1,198

Advances for equity participation

503,987

208,629

 

3,403,612

3,232,280

INVESTMENTS

2,826,445

2,468,677

FIXED

2,616,344

2,378,241

INTANGIBLE

171,575

180,261

Non-Current Assets Total

9,017,976

8,259,459

Assets Total

10,188,697

9,932,846

 

 

133


 

 

 

 

Liabilities and Stockholders’ Equity

Consolidated

12.31.14

12.31.13

Current Liabilities

   

Suppliers

76,685

62,863

Loans and financing

290,344

389,167

Bonds

255,159

-

Taxes and Social Contributions

59,024

53,373

Income tax and Social Contribution

335

103

Derivatives

-

-

Advance from consumers (Energy sell in advance)

-

-

Remuneration to shareholders (dividends to pay)

9,307

63,466

Estimated obligations

78,621

84,102

Provisions for contingencies

-

-

Post-employment benefit (Supplementary Pension Fund)

2,171

11,733

Onerous Contracts

-

-

Concessions to pay - UBP

2,084

1,977

Sectorial Charges (regulatories fees)

41,868

32,685

Incentive for personnel retirement

-

-

Others

136,633

176,063

Total of current Liabilities

952,231

875,532

 

   

Non-Current Liabilities

   

Suppliers

-

-

Loans and financing - principal

3,315,064

2,800,672

Taxes and Social Contributions

56,759

72,400

Income tax and Social Contribution

29,064

-

Advance from consumers (Energy sell in advance)

-

-

Estimated obligations

13,397

20,638

Provisions for contingencies

74,933

55,903

Provisions for uncovered liabilities on invested companies

97,449

-

Provision for Onerous Contracts

-

427,746

Post-employment benefit (Supplementary Pension Fund)

160,551

67,174

Leasing

-

-

Concessions to pay - UBP

23,938

22,814

Advance for future capital increase

63,985

59,284

Incentive for personnel retirement

-

-

Others

118,278

24,216

Non-Current Total

3,953,418

3,550,847

 

   

Stockholders’ Equity

   

Social Capital

4,295,250

4,295,250

Capital reserve

-

-

Profit reserve

1,074,209

1,072,411

Additional proposed dividends

25,623

188,660

Accumulated Profit/Losses

-

-

Others comprehensive Results

-126,391

-63,387

Non-Controlling shareholders participation

14,357

13,533

 

   

Total Stockholders’ Equity

5,283,048

5,506,467

 

   

Total Liabilities and Stockholders’ Equity

10,188,697

9,932,846

 

 

 

134

 
                                                                                                                 

 

 

 

 

Statement of Income

(R$ thousand)

 

 

Consolidated

12.31.14

12.31.13

Operating Revenue

   

Generation

   

Supply for Distributors

325,497

-

Supply

-

289,280

Short Term Electric Energy

46,058

48,516

 

   

Transmission

   

O&M Revenue Renewed Lines

497,480

430,595

O&M Revenue

93,520

84,045

Construction Revenue – Transmission

59,820

117,925

Return on Investment - T

206,377

175,808

Others Operating Revenues

27,613

51,415

 

   

Deductions to Revenue

-137,708

-113,142

Net Operating Revenue

1,118,657

1,084,442

 

   

Operating Costs

   

Electric Energy purchased for resale

-62,677

-41,864

Charges over the electric energy network usage

-13,601

-17,242

Fuel for electric energy production - CCC

-

-

Construction Cost

-59,820

-117,925

Operating Expenses

   

Personnel, Material and Third-part services

-472,497

-491,378

Remuneration and Reimbursement

-9,139

-8,607

Depreciation and Amortization

-125,941

-91,809

Donations and Contributions

-5,541

-4,743

Provisions

352,162

234,545

Others

-13,833

-50,101

Operating Costs and Expenses

-410,887

-589,124

 

   

Equity Participation Results

-319,232

-20,778

Operating Result before Financial result

388,538

474,540

 

   

Financial Result

-123,682

-84,193

Result before Income tax and Social Contribution

264,856

390,347

 

   

Current Income tax and Social Contribution

-3,184

-32,970

Deferred Income tax and Social Contribution

-222,500

-90,114

Net Profit of the period

39,172

267,263

 

 

135


 
 

 

 

Cash Flow - Consolidated

(R$ thousands)

 

Cash Flow

12.31.14

12.31.13

Operating Activities

   

Income before income tax, social contribution

264,856

390,347

Depreciation and amortization

125,941

92,575

Monetary / Exchange net variation

-38,394

4,302

Financial Charges

190,642

163,074

Equity method result

416,682

20,778

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

-557

36

Provision for contingencies

-5,083

-27,819

Provision for realignment of staff plan

196

13,147

Provision for impairment

-57,610

247,578

Provision for onerous contract

-407,893

-502,531

Charges of reversal global reserve

0

0

Adjustment to present value / market value (sum to Others item)

4,260

-6,536

Minority participation in the result

0

0

Charges on shareholders funds

25,449

5,131

Revenue of Financial Asset by IRR

-206,377

-175,808

Derivatives

0

0

Others

-563,319

-437,861

Increase/Decrease in operating assts/liabilities

-259,756

81,668

Cash from operating activities

-510,963

-131,919

 

   

Payment of financing charges

-252,084

-244,520

Payment of charges of reversal global reserve

0

0

Financial charges receiving

448

566

Receiving of investment remuneration on equity participation

7,725

12,902

Receiving of annual allowed revenue (financial asset)

842,071

755,900

Receiving of indemnities of financial asset

311,447

1,504,383

Payment of income tax and Social Contribution

-21,231

-32,095

Payment of complementary pension fund

0

0

Payment of lawsuit contingencies

0

-21,995

Lawsuits deposits

-20,710

-4,106

Net cash from operating activities

356,703

1,839,116

 

   

Financing Activities

   

Loans and Financing obtained

974,207

595,578

Payment of loans and Financing - Principal

-400,355

-266,893

Payment to shareholders

-279,195

-70,135

Payment of refinancing of taxes and social contributions - principal

-18,633

-31,751

Receiving of future capital increase

0

0

Others

-11,828

-10,843

Net cash from financing activities

264,196

215,956

 

   

Investment Activities

   

Fixed Asset Acquisition

-332,632

-154,246

Intangible Asset Acquisition

-3,548

-1,673

Concession Asset Acquisition

-59,820

-117,925

Concession of cash in advance for future capital Increase

-554,807

-374,849

Acquisition/Contribution of Capital in equity participation

-416,843

-843,656

Others

0

0

Net cash from Investment Activities

-1,367,650

-1,492,349

 

   

Increase (decrease) in cash and cash equivalent

-746,751

562,723

 

   

Cash and cash equivalent – beginning of period - 12/31/13

773,711

210,988

Cash and cash equivalent – end of period – 12/31/14

26,960

773,711

 

-746,751

562,723

 

136


 
 

 

 

Analysis of the result

 

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net loss 157.5% lower than reported in the previous quarter, from R$ 42 million in 3Q14 to R$ 107 million in 4Q14, mainly due to the factors described below.

 

Operating Revenue

 

In Generation:

 

The short-term energy increased by 919.4%, from R$ 4 million in 3Q14 to R$ 37 million in 4Q14, mainly due to higher volume of energy traded in CCEE. This energy comes from the Power Purchase Agreement - PPA signed with SPS ESRB, which the company has a 20% stake.

 

In Transmission:

 

The transmission segment revenues (operation and maintenance) remained at the same level as the previous quarter.

 

The construction revenue showed an increase of 134.5%, from R$ 13 million in 3Q14 to R$ 31 million in 4Q14, which has correspondence of equal value in the construction expense, not affecting net income of the company.

 

Operating Expenses

 

The personnel expenses increased by 13.8%, from R$ 119.5 million in 3Q14 to R$ 136.1 million in 4Q14, mainly due to the increase on the agreement on the company's operating policy as retroactive indemnities payments and does not constitute future increase in expenses such as the recognition of pension provision in the 4Q14.

 

The electric energy purchased for resale showed an increase of 84.5% from R$ 16 million in 3Q14 to R$ 29 million in 4Q14, mainly due to purchased energy of HPU Jirau, mentioned above.

 

The operational provisions fell by 66%, from R$ 110 million in 3Q14 to R$ 37 million in 4Q14, mainly due to recognition of onerous contracts reversals in the amount of R$ 108 million in 3Q14, partially offset by the reversal of impairment of R$ 58 million in 4Q14.

 

Financial Result

 

The net financial result increased by 133.7%, from an expense of R$ 31 million in 4Q14 to an expense of R$ 71 million in 4Q14, mainly due to uptake of the order loans of R$ 723 million, burdening the cost of charges debt and financial transaction tax - IOF.

 

 

137


 
 

 

 

Market Data

 

1.Generation Assets and Energy generated

 

1.1.Own assets

 

Plant

Installed

Capacity

(MW)

Guaranteed energy

(MW Average)

Energy generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

HPU Passo São João

77.00

41.10

67,052.70

119,228.20

143,053.76

132,251.75

461,586.41

HPU Mauá*

177.9

96.90

186,075.20

253,601.70

302,507.46

310,219.74

1,052,404.11

HPU São Domingos

48.00

36.40

50,819.70

48,277.80

48,202.47

47,390.41

194,690.40

SHU Barra do Rio Chapéu

15.15

8.61

13,740.00

18,764.00

14,723.88

13,081.29

60,309.18

SHU João Borges

19.00

10.14

12,760.30

25,586.70

19,297.30

22,043.24

79,687.54

WPP Cerro Chato I

30.00

11.00

22,236.20

24,042.30

28,611.65

22,482.89

97,373.03

WPP Cerro Chato II

30.00

11.00

23,209.40

25,445.50

30,441.54

24,666.74

103,763.19

WPP Cerro Chato III

30.00

11.00

22,391.00

24,640.50

29,583.30

24,451.09

101,065.88

Megawatt Solar

0.93

-

-

34.64

171.52

305.80

510.96

* The reported values ​​refer to the Company's interest in the project ( Consorcio Maua 49% Eletrosul).

 

Plant

Location (State)

Beginning of Operation

End of Operation

HPU Passo São João

RS

Mar/12

Aug/41

HPU Mauá*

PR

Nov/12

Jul/42

HPU São Domingos

MS

Jun/13

Dec/37

SHU Barra do Rio Chapéu

SC

Feb/13

May/34

SHU João Borges

SC

Jul/13

Dec/35

WPP Cerro Chato I

RS

Nov/11

Aug/45

WPP Cerro Chato II

RS

Sep/11

Aug/45

WPP Cerro Chato III

RS

Jun/11

Aug/45

Megawatt Solar

SC

Sep/14

-

* Mauá Consortium (49% Eletrosul)

 

1.2.SPE

 

SPE

Plant

Installed

Capacity

MW

Guaranteed energy MW Average

Energy generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

ESBR Participações S.A.

HPU Jirau*

3,750.0

 

2,184.6

289,282.53

730,294.27

1,028,828.00

1,602,518.00

3,650,922.80

WPP Livramento

WPP**

78.0

29.0

4,089.30

8,181.40

20,238.8

7,940.8

40,450.3

* The UHE Jirau is operating with 1,500 MW capacity.

** The wind farms refer to plants of the Holding Livramento , operating with 38 MW of installed capacity.

 

 

Plant

Participation %

Location

(State)

Beginning of Operation

End of Concession

HPU Jirau

20

RO

Sep/13

Aug/43

WPP –Livramento Holding S/A

52.53

RS

Nov/13

Mar/47

 

 

138


 
 

 

 

2.Electric energy purchased for resale 

 

2.1.Own assets

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

-

-

-

-

 

R$ million

-

-

-

-

 

Others*

MWh

16,717.65

15,366.71

69,536.37

134,620.34

236,241.07

R$ million

5.25

2.60

16.40

25.89

50.14

TOTAL

MWh

16,717.65

15,366.71

69,536.37

134,620.34

236,241.07

R$ million

5.25

2.60

16.40

25.89

50.14

* Includes compensation Klabin (SHU Salto Mauá ) . As the Concession Agreement No. 001/2007 - MME- HPP Maua , Maua enterprise must reimburse to Klabin SA for the loss of generation in Hydroelectric Plant Salto Mauá .

 

2.2.SPE

 

Livramento Holding S.A.

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

17,176.7

47,403.70

42,181.63

27,193.68

133,955.71

R$ million

11.537

27.363

25.702

18.645

83.25

Others

MWh

-

-

-

-

-

R$ million

-

-

-

-

-

Total

MWh

17,176.7

47,403.70

42,181.63

27,193.68

133,955.71

R$ million

11.537

27.363

25.702

18.645

85.80

 

3.Energy sold

 

3.1.Own assets

 

3.1.1. Energy sold by enterprises not affected by 12,783 Law(not from quotas)

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

-

-

-

-

 

 

 

 

 

 

B

-

-

-

-

 

 

 

 

 

 

Others

A

76.0

454,414

69.5

417,141

73.9

429,127

76.4

452,019

295.8

1,752,701

B*

7.3

59,728

7.4

58,000

7.5

61,374

7.5

61,252

29.7

240,354

Total

A

76.0

454,414

69.5

417,141

73.9

429,127

76.4

452,019

295.8

1,752,701

B

7.3

59,728

7.4

58,000

7.5

61,374

7.5

61,252

29.7

240,354

A - Sale of energy in regulated enviroment.

B - Through free market agreements or bilateral contracts

*  Includes compensation Klabin (SHU Salto Maua) . As the Concession Agreement No. 001/2007 - MME- HPP Maua , Maua enterprise must reimburse the Klabin SA for the loss of generation in Hydroelectric Plant Salto Mauá.

 

 

 

139


 
 

 

 

3.1.2. Energy sold by enterprises affected by 12,783 Law – O&M – N/A

 

3.2.SPE

 

ESBR Participações S.A.      

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

3.2

32,900

8.3

88,100

12.7

126,204

18.2

183,578

41.8

430,774

B

1.6

9,500

3.7

21,900

16.7

98,000

38.3

226,219

60.2

355,634

Others

A

28.2

299,400

76.5

799,600

112.6

1,146,325

159.7

1,598,318

376.9

3,843,624

B

2.4

14,200

5.6

32,900

24.3

143,481

57.4

339,328

89.7

529,931

Total

A

31.4

332,300

84.8

887,700

124.7

1,272,529

177.9

1,781,896

418.8

4,274,425

B

4.0

23,700

9.3

54,800

41.0

241,482

95.7

592,082

149.9

912,064

CCEE TOTAL

 

91.4

-66,756

97.6

-212,177

4.0

-485,182

45.5

-771,461

189.0

-1,050,394

A - Through auctions

B - Through free market contracts or bilateral contracts

 

Livramento Holding S.A.

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A

0.762

2,761.78

1.60

6,847.90

0.347

6,923.16

0.266

6,920.00

2.975

23,452.84

B

 

 

 

 

 

 

 

 

 

 

Others*

A

6.290

22,781.82

13.203

56,488.10

2.868

57,108.84

2.194

57,083.00

24.555

193,461.76

B

   

 

 

 

 

 

 

 

 

Total

A

7.053

25,543.60

14.804

63,336.00

3.216

64,032.00

2.460

64,003

27.533

216,914.60

B

   

 

 

 

 

 

 

 

 

A - Through auctions

B - Through free market contracts or bilateral contracts

 

4.CCEE settlement (Spot and MRE – Regulated Market)

 

 

Unit

1Q14

2Q14

3Q14

4Q14

2014

Net

R$ million

-10.33

-10.30

-0.04

40.50

19.82

MWh

-117,100.99

52,020.60

169,390.74

230,675.27

334,985.63

MWaverage

-54.19

23.82

76.72

104.52

150.87

 

5. Fuel used to produce electricity - N/A

 

6. Losses in generation - %

 

1Q14

2Q14

3Q14

4Q14

2014

3.31

3.35

3.16

2.94

3.20

 *Considered Basic Network and Internal losses.

 

 

7.Average price– R$/MWh

 

7.1.Own assets –enterprises not affected by 12,783 Law

 

1Q14

2Q14

3Q14

4Q14

2014

166.11

168.50

173.74

175.77

171.03

 

 

140


 
 

 

 

7.1.1 Own assets – enterprises renewed in accordance with  12,783 Law – O&M – N/A

 

7.2.SPE

 

SPE

1Q14

2Q14

3Q14

4Q14

2014

ESBR Participações S.A.

99.31

99.87

109.35

117.15

109.65

Livramento Holding S.A.

274.85

232.66

50.01

38.45

126.93

 

8.Extension of transmission lines – Km

 

8.1.Own assets

 

8.1.1.Transmission lines – Enterprises not affected by 12,783 law

 

From - To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Blumenau – Biguaçu /Campos Novos

357.8

525

Sep/06

Mar/35

Salto Santiago/Ivaiporã

168.5

525

Out/05

Feb/34

Ivaiporã/Cascavel Oeste

203.4

525

Out/05

Feb/34

Campos Novos(SC)/Nova S.Rita(RS)

257.4

525

Mai/09

Apr/36

Sub/Total 525 kV

987.1

 

 

 

Coletora Porto Velho / P. Velho (RO)

44.0

500/230

Aug/12

Feb/39

Sub/Total 500/230 kV

44.0

 

 

 

Presidente Médice/Santa Cruz

237.4

230

Jan/10

Mar/38

Monte Claro /Garibaldi

33.5

230

Sep/13

Oct/40

Sub/Total 230 kV

270.9

 

 

 

Basic Network Total

1,302.0

 

 

 

General Total

1,302.0

 

 

 

 

8.1.1.2.Transmission lines – enterprises renewed in terms of the 12,783 law – O&M

 

From - To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Areia/Bateias

220.3

525

Jun/00

Dec/42

Areia/Campos Novos

176.3

525

Sep/82

Dec/42

Areia/Curitiba

235.8

525

Jun/00

Dec/42

Areia/Ivaiporã

173.2

525

May/82

Dec/42

Areia / /Segredo

57.8

525

Aug/92

Dec/42

Blumenau / /Curitiba

135.7

525

Dec/83

Dec/42

Campos Novos / /Machadinho

50.2

525

Jan/02

Dec/42

Campos Novos / /Caxias

203.3

525

Dec/01

Dec/42

Caxias / /Gravataí

78.7

525

Dec/01

Dec/42

Caxias / /Itá

256.0

525

Feb/02

Dec/42

Curitiba –Bateias

33.5

525

Jun/00

Dec/42

Itá – Nova Santa Rita

314.8

525

Apr/06

Dec/42

Gravataí – Nova Santa Rita

29.1

525

Apr/06

Dec/42

Itá / /Machadinho

70.1

525

Jan/02

Dec/42

Itá / /Salto Santiago

186.8

525

Sep/87

Dec/42

Ivaiporã / /Londrina

121.9

525

Apr/88

Dec/42

Ivaiporã / /Salto Santiago

165.6

525

May/82

Dec/42

Ivaiporã Eletrosul / Ivaiporã Furnas

0.8

525

Sep/82

Dec/42

Ivaiporã Eletrosul / Ivaiporã Furnas

0.8

525

Feb/92

Dec/42

Ivaiporã Eletrosul / Ivaiporã Furnas

0.8

525

Jun/04

Dec/42

Salto Santiago //Segredo

60.9

525

Aug/92

Dec/42

Salto Santiago //Segredo

2.1

525

Aug/92

Dec/42

Areia / /Gov. Bento Munhoz

10.7

525

Sep/80

Dec/42

Areia / /Gov. Bento Munhoz

10.9

525

Aug/81

Dec/42

Cascavel D'Oeste /Guaíra

126.2

525

Apr/01

Dec/42

Campos Novos / /Machadinho 2

39.9

525

Jan/02

Dec/42

Ivaiporã / /Londrina 2

122.1

525

Apr/88

Dec/42

Itá / /Salto Santiago 2

187.6

525

Sep/87

Dec/42

Sub/Total 525 kV

3,071.9

 

 

 

141


 
 

 

 

 

From - To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Anastácio – Dourados

210.9

230

Aug/94

Dec/42

Areia / Ponta Grossa Norte

181.6

230

Oct/76

Dec/42

Areia / Salto Osório

156.3

230

Jan/77

Dec/42

Areia / Salto Osório

156.2

230

Dec/76

Dec/42

Areia / São Mateus do Sul

129.0

230

Jul/90

Dec/42

Assis / Londrina Copel

114.3

230

Mar/79

Dec/42

Blumenau –Jorge Lacerda B

129.5

230

Oct/80

Dec/42

Biguaçu – Blumenau 2

116.4

230

Jun/79

Dec/42

Blumenau – Itajaí

37.5

230

Jan/02

Dec/42

Blumenau – Itajaí

37.5

230

Mar/02

Dec/42

Blumenau – Joinville

67.0

230

Sep/79

Dec/42

Blumenau – Joinville Norte

72.8

230

Apr/79

Dec/42

Blumenau – Palhoça

133.9

230

Jan/84

Dec/42

Campo Mourão / Apucarana

114.5

230

Feb/76

Dec/42

Campo Mourão /Maringá

79.9

230

Feb/76

Dec/42

Campo Mourão /Salto Osório 1

181.2

230

Feb/76

Dec/42

Campo Mourão /Salto Osório 2

181.3

230

May/76

Dec/42

Canoinhas /São Mateus do Sul

47.7

230

Feb/88

Dec/42

Cascavel /Cascavel D'Oeste

9.9

230

Apr/01

Dec/42

Caxias / Caxias 5

22.5

230

Jun/09

Dec/42

Curitiba –Joinville

99.7

230

Jun/77

Dec/42

Curitiba /São Mateus do Sul

116.7

230

Jul/90

Dec/42

Farroupilha /Caxias 5

17.9

230

Oct/05

Dec/42

Monte Claro – Passo Fundo

211.5

230

Sep/04

Dec/42

Farroupilha /Monte Claro

31.0

230

Sep/04

Dec/42

Farroupilha /Monte Claro2

31.0

230

Sep/04

Dec/42

Monte Claro – Nova Prata

30.9

230

Sep/04

Dec/42

Jorge Lacerda A /Jorge Lacerda

0.8

230

Dec/79

Dec/42

Jorge Lacerda "B"/ Palhoça

120.6

230

Aug/05

Dec/42

Jorge Lacerda / Siderópolis 1

49.4

230

Jun/79

Dec/42

Jorge Lacerda / Siderópolis 2

47.3

230

Aug/79

Dec/42

Londrina(Eletrosul) / Assis

156.5

230

May/05

Dec/42

Londrina(Eletrosul) / Maringá

95.3

230

May/05

Dec/42

Londrina – Apucarana

40.4

230

Apr/88

Dec/42

Londrina Eletrosul / Londrina Copel

31.6

230

Apr/88

Dec/42

Atlândida 2 / Osório 2

36.0

230

May/07

Dec/42

Passo Fundo / Nova Prata 2

199.1

230

Nov/92

Dec/42

Passo Fundo – Xanxerê

79.3

230

May/75

Dec/42

Passo Fundo – Xanxerê

79.2

230

Nov/79

Dec/42

Passo Fundo / Passo Fundo 1

0.4

230

Mar/73

Dec/42

Passo Fundo / Passo Fundo 2

0.4

230

May/73

Dec/42

Salto Osório / Pato Branco

85.9

230

Dec/79

Dec/42

Salto Osório – Xanxerê

162.0

230

Oct/75

Dec/42

Salto Osório / Salto Osório (1 a 6)

2.2

230

Nov/75

Dec/42

Lajeado Grande / Forquilhinha

116.5

230

Sep/03

Dec/42

Lajeado Grande / Caxias 5

65.6

230

Oct/05

Dec/42

Xanxerê / Pato Branco

79.6

230

Dec/79

Dec/42

Joinville / Vega do Sul 1

44.1

230

Nov/02

Dec/42

Joinville / Vega do Sul 2

44.1

230

Nov/02

Dec/42

Gravataí 2/ / Gravataí 3

2.1

230

Nov/07

Dec/42

Complexo Industrial Automotivo Gravataí /Gravataí 3

2.1

230

Dec/07

Dec/42

Jorge Lacerda A / Jorge Lacerda B 2

0.8

230

Oct/07

Dec/42

Jorge Lacerda B / Jorge Lacerda C 1

0.5

230

Feb/97

Dec/42

Jorge Lacerda B / Jorge Lacerda C 2

0.5

230

Feb/97

Dec/42

Biguaçu –Palhoça

2.7

230

Oct/08

Dec/42

Biguaçu –Palhoça (Circuito Duplo)

17.7

230

Oct/08

Dec/42

Biguaçu – Desterro Circiuto Duplo

17.7

230

Dec/08

Dec/42

Biguaçu – Desterro (Continente)

21.0

230

Dec/08

Dec/42

Biguaçu – Desterro (Marítimo)

4.3

230

Dec/08

Dec/42

Biguaçu – Desterro (Ilha)

13.6

230

Dec/08

Dec/42

Curitiba /Joinville Norte (Circuito Duplo)

1.0

230

Nov/76

Dec/42

Curitiba /Joinville Norte (Circuito Simples)

95.4

230

Nov/76

Dec/42

Joinville – Joinville Norte (Circuito Duplo)

1.0

230

Nov/76

Dec/42

Joinville – Joinville Norte (Circuito Simples)

4.3

230

Nov/76

Dec/42

142


 
 

 

 

 

From - To

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Dourados –Guaíra (Estaiada)

209.6

230

Nov/91

Dec/42

Dourados –Guaíra (Circiuto Duplo)

16.9

230

Nov/91

Dec/42

Atlântida 2/Gravataí 3

64.2

230

Apr/08

Dec/42

Atlântida 2/Gravataí 3 (Circuito Duplo)

36.0

230

Apr/08

Dec/42

Livramento / Rivera

1.9

230

Jan/01

Dec/42

El Dorado / Guaíra

16.9

230

Oct/82

Dec/42

Siderópolis / Forquilhinha

27.6

230

Oct/11

Dec/42

Campos Novos / Barra Grande

34.6

230

Sep/05

Dec/42

Sub/Total 230 kV

4,847.3

 

 

 

Blumenau / Ilhota

40.2

138

Oct/88

Dec/42

Campo Grande / Mimoso 2

108.3

138

Oct/83

Dec/42

Biguaçu – Camboriú – Morro do Boi

50.3

138

Feb/02

Dec/42

Biguaçu – Florianópolis

19.5

138

Feb/02

Dec/42

Campo Grande / Mimoso 3

108.3

138

Sep/83

Dec/42

Campo Grande / Mimoso 4

108.3

138

Sep/83

Dec/42

Dourados das Nações / Ivinhema

94.7

138

Dec/83

Dec/42

Florianópolis / Itajaí Fazenda

58.4

138

Oct/90

Dec/42

Florianópolis / Palhoça 1

9.6

138

Nov/83

Dec/42

Florianópolis / Palhoça 2

9.6

138

Nov/83

Dec/42

Blumenau / Gaspar

29.0

138

Sep/89

Dec/42

Ilhota – Picarras

14.8

138

Apr/94

Dec/42

Ilhota / Itajaí 1

7.9

138

Mar/02

Dec/42

Ilhota / Itajaí 2

7.9

138

Jan/02

Dec/42

Itajaí / Camboriú Morro do Boi

13.3

138

Feb/02

Dec/42

Itajaí / Itajaí Fazenda

5.4

138

Mar/02

Dec/42

Ivinhema / Porto Primavera

91.0

138

Mar/82

Dec/42

Jorge Lacerda A / Imbituba

45.7

138

Oct/80

Dec/42

Jorge Lacerda A / Palhoça

108.6

138

Oct/83

Dec/42

Joinville / Joinville Santa Catarina

11.0

138

Oct/99

Dec/42

Joinville Santa Catarina / Picarras

50.0

138

Oct/99

Dec/42

Jupiá – Mimoso 2

218.7

138

Feb/92

Dec/42

Jupiá – Mimoso 3

218.7

138

Jan/82

Dec/42

Jupiá – Mimoso 4

218.7

138

Jan/82

Dec/42

Palhoça – Imbituba

74.0

138

Oct/83

Dec/42

Anastácio / Aquidauana 1

11.1

138

Nov/06

Dec/42

Anastácio / Aquidauana 2

11.1

138

Nov/06

Dec/42

LI Araquari/Joinville GM

19.3

138

May/12

Dec/42

Biguaçu/ Florianópolis 2

19.5

138

May/11

Dec/42

Ilhota/Araquari Hyosung

47.7

138

Sep/11

Dec/42

Ilhota/Gaspar

11.2

138

Oct/88

Dec/42

Joinville/Joinville GM

8.7

138

May/12

Dec/42

Sub/Total 138 kV

1,850.5

 

 

 

Conversora de Uruguaiana / Passo de Los Libres

12.5

132

Sep/94

Jul/21

Salto Osório / Salto Santiago

56.2

69

Oct/78

Dec/42

Sub/Total (132 and 69 kV)

68.7

 

 

 

Basic Network Total

7,919.2

 

 

 

General Total

9,838.4

 

 

 

143


 
 

 

 

8.1.2.Substations

 

8.1.2.1. Substations  – enterprises not affected by 12,783 law

 

 

Substations

Transformation Capacity

Location

Beginning of Operation

End of

Operation

SS – Missões

150

RS

Nov/10

Jan/39

SS – Biguaçu

1,344

SC

Abr/08

Mar/35

SS – Foz do Chapecó *

100

RS

Dez/12

Out/40

SS – Caxias 6

330

RS

Ago/12

Out/40

SS – Ijuí 2

166

RS

Abr/13

Out/40

SS – Lageado Grande *

75

RS

Nov/12

Out/40

SS – Nova Petrópolis 2

83

RS

Nov/12

Out/40

SS – Coletora Porto Velho

800

RO

Ago/12

Fev/39

SS Biguaçu –ampliação

150

SC

Out/12

Dez/42

SS Tapera 2 - ampliação

83

RS

Nov/12

Dez/42

SS Joinville Norte - ampliação

150

SC

Set/13

Dez/42

SS Nova Santa Rita –ampliação

672

RS

Dez/13

Dez/42

Total

4,103

     

* Transormers installed in third-part related substations

 

8.1.2.2. Substations  – enterprises renewed in terms of 12,783 law – O&M

 

Substations

Transformation capacity

Location

Beginning of Operation

End of

Operation

SS - Campos Novos

2,466

SC

Sep/1982

Dec-42

SS – Caxias

2,016

RS

Dec/2001

Dec-42

SS – Gravataí

2,016

RS

Sep/1982

Dec-42

SS - Nova Santa Rita

2,016

RS

Aug/2009

Dec-42

SS – Blumenau

1,962

SC

Apr/1979

Dec-42

SS – Curitiba

1,344

PR

Oct/1980

Dec-42

SS – Londrina

1,344

PR

Apr/1988

Dec-42

SS - Santo Ângelo

1,344

RS

Dec/1999

Dec-42

SS – Biguaçu

300

SC

Apr/2008

Dec-42

SS – Joinville

691

SC

Nov/1974

Dec-42

SS – Areia

672

PR

Aug/1980

Dec-42

SS – Xanxerê

600

SC

Jun/1983

Dec-42

SS – Itajaí

525

SC

Jan/2002

Dec-42

SS - Jorge Lacerda "A"

399.8

SC

Jun/1973

Dec-42

SS – Palhoça

384

SC

Jan/1984

Dec-42

SS - Canoinhas

375

SC

Feb/1988

Dec-42

SS – Siderópolis

352

SC

Apr/1975

Dec-42

SS - Assis *

336

SP

Mar/1979

Dec-42

SS - Joinville Norte

300

SC

Jun/2009

Dec-42

SS – Dourados

300

MS

Nov/1987

Dec-42

SS - Atlântida 2

249

RS

May/2007

Dec-42

SS - Caxias 5 *

215

RS

Jun/2005

Dec-42

SS - Passo Fundo

168

RS

Nov/1992

Dec-42

SS - Tapera 2

166

RS

Mar/2005

Dec-42

SS - Gravataí 3

165

RS

Nov/2007

Dec-42

SS – Desterro

150

SC

Dec/2008

Dec-42

SS – Anastácio

150

MS

Aug/1994

Dec-42

Uruquaiana Frequency Converter

109.7

RS

Sep/1994

Dec-42

SS – Ilhota

100

SC

Dec/1976

Dec-42

SS – Farroupilha

88

RS

Jun/1973

Dec-42

SS – Charqueadas

88

RS

Jan/1972

Dec-42

SS – Alegrete

83

RS

May/1971

Dec-42

SS – Itajaí - Enlargement

75

SC

Sep/2014

Dec-42

SS – Florianópolis

75

SC

Dec/1974

Dec-42

SS – Salto Osório

33.3

PR

Oct/1975

Dec-42

SS – Salto Santiago

15

PR

Nov/1980

Dec-42

SS – Itararé

42

SC

May/2013

Dec-42

Total

21,714.8

 

 

 

* Transformers installed inthird-part related substations

 

8.2.SPEs

 

144

 
                                                                                                                 

 
 

 

 

8.2.1. Transmission Lines

 

SPE

From - To

Participation

(%)

Extension

(km)

Tension

(kV)

Beginning of Operation

End of Concession

Etau

TL (Campos Novos (SC) – Barra Grande (SC) – Lagoa Vermelha (RS) – Santa Marta (RS))

27.42

188

230

Jul/05

Dec/32

Uirapuru

TL (Ivaiporã (PR) – Londrina (PR))

75.00

120

525

Jul/06

Mar/35

Transmissora Sul Brasileira de Energia – TSBE

TL 525 KV Salto Santiago – Itá

80.00

188

525

Feb/14

May/42

TL 525KV Itá – Nova Santa Rita

307

525

Aug/14

TL 230KV Nova Santa Rita – Camaquã

121

230

Dec/14

TL 230KV Camaquã – Quinta

167

230

Dec/14

Costa Oeste

TL Cascavel Oeste – Umuarama, CS

49.00

144.4

230

Aug/14

Jan/42

Transmissora Sul Litorânea de Energia - TSLE

TL Povo Novo – Marmeleiro, CS

51.00

152

525

Dec/14

Aug/42

TL Marmeleiro – Santa Vitória do Palmar

48

525

Dec/14

Norte Brasil Transmissora de Energia S.A.*

TL Coletora Porto Velho (RO) – Araraquara 2 (SP), em CC

24.5

2,412

600

Sep/14

Feb/39

* Development completed in September / 2014 , but its power is awaiting authorization from the ONS that the principle is estimated to April / 2015 , it depends on systemic conditions that will only be met from that date.

 

8.2.2. Substations

 

SPE

Substation

Participation (%)

Transformation Capacity

(MVA)

Beginning of Operation

End of Operation

Etau

SS Lagoa Vermelha 2 230/138KV

27.42

150

Jul/05

Dec/32

SS Barra Grande 230/138 KV

-

Transmissora Sul Brasileira de Energia – TSBE

EnlargementSS 525 KV Salto Santiago

80.0

-

Feb/14

May/42

Enlargement SS 525 kV Itá and

Enlargement SS 525/230kV Nova Santa Rita

-

Aug/14

SS Camaquã 3 230/69Kv

166

Dec/14

Enlargement SS 230 kV Quinta

-

Dec/14

Costa Oeste

SS Umuarama 230/138 kV – 2X150 MVA

49.0

300

Jul/14

Jan/42

Transmissora Sul Litorânea de Energia - TSLE

SS Povo Novo525/230 kV

51.0

672

Dec/14

Aug/42

SS Santa Vitória do Palmar 525/138 kV

75

Dec/14

 

9.Transmission losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

1.81

1.59

1.60

1.64

1.66

 

 

 

 

 

 

 

 

 

145


 
 

 

 

10.Main investments of parent company– R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

2014

Generation

1.7

18.4

4.2

186.6

210.9

267.2

Installation of Solar Megawatt Project

0.3

2.5

0.3

0.8

3.9

3.9

Electric energy generation maintenance

0.5

4.1

0.4

2.4

7.4

19.5

Hydro Complex Hidreletrico Alto da Serra installation with 37.0 MW and Associateof transmissionsystem in 138 KV, with 54

0.9

1.2

2.7

0.7

5.5

43.8

Implementation of Wind Power Plant Coxilha Seca (30MW), Capão do Inglês (10MW) and Galpões (8MW)

-

10.7

0.8

182.6

194.1

200.0

Transmission

11.1

16.0

16.9

20.9

64.9

122.1

Expansion of South transmission system

6.2

9.3

10.0

17.5

43.0

80.7

Reinforcement and Improvement of Transmuission System in South Region

0.1

0.4

0.5

0.5

1.5

4.0

Brazil-Uruguay-Electric Interconnection (Eletrosul Activities)

4.7

5.7

6.2

1.9

18.5

22.2

Maintenance of electric energy transmission system

0.0

0.6

0.2

1.0

1.8

15.2

Infrastructure

0.6

2.2

1.8

10.5

15.1

31.8

Total

13.4

36.6

22.9

218.0

290.9

421.1

 

11.New investments

 

11.1.Generation

 

11.1.1.Own assets

 

Unit - Own assets

Location

(State)

Investment

(R$ million)

Installed capacity (MW)

Guaranteed energy

Beginning of Operation

Beginning

of construction

End of Concession

Total

Up to 4Q14

R$ million

SHU Santo Cristo*

SC

227.47

16.87

19.5

10.5

-

-

Jun/42

SHU Coxilha Rica**

SC

-

10.08

18.0

10.1

-

-

Jun/42

Cerro Chato – Wind Parks Capão do Inglês, Coxilha Seca and Galpões***

RS

270.00

194.1

48.0

18.7

May/15

Jul/14

Jun/42

* In Installation License phase. Top of planned Operation for 22 months after issuance of the Installation License

** Start of construction and indefinite Operation in negative opinion of the function of Historic and Artistic Institute - IPHAN .

***Construction and operation permit granted to SPE Wind Coxilha Seca S/A through ANEEL Auction 009/2013 . Grant Transfer Agreement of Wind Coxilha Seca for Eletrosul on 08/08/2014 , and is therefore transferred the total ownership of Ordinance MME # 192 , 204 and 210. The transfer of the grant awaits approval by ANEEL .

 

11.1.2.SPE

 

SPE

Unit

Location

(State)

Installed capacity (MW)

Guaranteed energy

Beginning of Operation

Beginning of construction

End of Concession

ESBR Participações S/A*

HPU Jirau

RO

3,750

2,184.6

Sep/13

Dec/09

Aug/43

Teles Pires Participações S.A.**

HPU Teles Pires

MT

1,820

915.4

Jul/15

Aug/11

Jun/46

Eólica –Chuí Holding S/A

Wind Parks Chuí I to V, (98MW) and Minuano VI and VII (46MW).

RS

144

59.8

Mar/15

Feb/14

Apr/47

Eólica –Livramento Holding S/A***

Wind Parks Cerro Chato IV, V, VI, Ibirapuitã and Trindade

RS

78

29.0

Nov/13

Jan/12

Mar/47

Eólica – Santa Vitória do Palmar S/A****

Wind Parks Geribatu from I to X

RS

258

109.0

Feb/15

Nov/12

Apr/47

Hermene-

gildo I

Wind Parks Verace 24 to 27

RS

57.3

27.4

May/15

Aug/14

Jun/49

Hermene-

gildo II

Wind Parks Verace 28 to 31

RS

57.3

26.6

Jun/15

Aug/14

Jun/49

Hermene-

gildo III

Wind Parks Verace 34 to 36

RS

48.3

22.2

Sep/15

Aug/14

Jun/49

Chuí IX

Wind Park Chuí IX

R$

17.9

7.8

Apr/15

Aug/14

May/49

Coxilha Seca****

Coxilha Seca, Galpões and Capão do Inglês.

RS

48.0

18.7

May/15

Mar/14

May/49

* In commercial Operation : 1,500 MW. In test phase : 225 MW.
** UG 1 available to operate in January / 2015 , but the start condition to the completion of the transmission system .
*** In commercial Operation : 42 MWm .
****Testing Requested on Jun/14 authorization to Aneel for the realization of the enterprise by Eletrosul.

146


 
 

 

 

11.1.2.1  SPE

 

SPE

Unit

Investment

(R$ million)

Working Schedule (%)

Participation (%)

Partners

Total

Up to 4Q14

ESBR Participações S/A

HPU Jirau

18,969.0

18,780.7

95.54

20.00

Suez – 40%. Chesf – 20% and Mitsui – 20%

Teles Pires Participações S.A.

HPU Teles Pires

4,512.4

4,131.6

97.20

24.72

Neoenergia – 50.6% and Furnas – 24.7%

Wind Park –Chuí Holding S.A.

Wind Parks of Chuí I to V, (98MW) and Minuano VI and VII (46MW).

805.6

661.31

73.40

49.00

Rio Bravo Investimentos 51%

Wind Park –Livramento Holding S.A.

Wind Parks Cerro Chato IV, V, VI, Ibirapuitã and Trindade

490.3

349.04

93.50

52.53

Rio Bravo Investimentos - 41% and Fundação Elos – 6.47%

Wind Park – Santa Vitória do Palmar S.A. *

Wind Parks Geribatu I to X

1,099.1

1,003.14

99.50

49.00

Brave Winds Geradora – 51%

Hermene-

gildo I

Wind Parks Verace 24 to 27

287.26

109.55

19.7

99.99

Renobrax – 0.01%

Hermenegildo II

Wind Parks Verace 28 to 31

287.26

65.76

8.0

99.99

Renobrax – 0.01%

Hermenegildo III

Wind Parks Verace 34 to 36

244.9

69.27

0.8

99.99

Renobrax – 0.01%

Chuí IX

Wind Park Chuí IX

81.6

44.79

52.7

99.99

Renobrax – 0.01%

*Testing phase: 258 MW

 

11.2.Transmission

11.2.1.Own assets

11.2.1.1.Transmission lines

From - To

Total of investment

(R$ million)

Invest. up to 4Q14 (R$ million)

Extension

of lines (Km)

Tension

(kV)

Beginning of Operation

End of Concession

PortioningTL JLA – PAL, SS GAROPABA

7.61

0.70

5.4

138

Forecasted

Dec/15

Dec/42

PortioningTL JLA – PAL, SS PALHOÇA – PINHEIRA

5.48

3.52

3.7

138

Forecasted

Sep/15

Dec/42

Portioning TL Passo Fundo / Monte Claro

9.29

4.98

11.0

230

Forecasted

Mar/15

Dec/42

PortioningTL Araquari Hyosung – Joinville GM, SS Joinville SC

5.13

0.20

1.0

138

Forecasted

Sep/15

Dec/42

Portioning Porto Primavera - Ivinhema, na SE IVINHEMA 2, double circuit

3.42

0.60

3.5

138

Forecasted

Jan/16

Jan/44

Portioning PORTO PRIMAVERA - IVINHEMA, SS NOVA ANDRADINA (Enersul), andImplantation of 2 modulesof line entrance

12.39

0.34

11.0

138

Forecasted

Jan/16

Dec/42

Electrical Interligation Brasil – Uruguai – TL Candiota-Melo

50.78

49.01

60.0

525

Nov/14*

Feb/40

Electrical InterligationBrasil – Uruguai – TL Presidente Médici-Candiota

7.59

7.54

2.8

230

Nov/14*

Feb/40

PortioningTL Blumenau - Palhoça, SS Gaspar 2

15.81

0.04

2.0

230

Forecasted

Sep/16

Jan/44

TL Capivari do Sul-Gravataí,

46.6

-

83.0

525

Mar/18

Nov/44**

TL Capivari do Sul-Viamão 3

99.7

-

65.0

230

Mar/18

Nov/44**

TL Guaíba 3-Capivari do Sul

205.7

-

178.0

525

Mar/18

Nov/44**

TL Osório 3 - Gravataí 3

46.8

-

66.0

230

Mar/18

Nov/44**

TL Porto Alegre 8 - Porto Alegre 1 (underground)

33.8

-

3.4

230

Mar/18

Nov/44**

TL Porto Alegre 12 - Porto Alegre 1 (underground)

39.8

-

4.0

230

Mar/18

Nov/44**

TL Livramento 3 - Alegrete 2

64.4

-

125.0

230

Mar/18

Nov/44**

TL Livramento 3-Cerro Chato

4.1

-

10.0

230

Mar/18

Nov/44**

TL Livramento 3 - Santa Maria 3

124.3

-

247.0

230

Mar/18

Nov/44**

TL Livramento 3 - Maçambará 3

110.2

-

205.0

230

Mar/18

Nov/44**

TL Guaíba 3 - Gravataí

143.5

-

127.0

525

Mar/18

Nov/44**

TL Guaíba 2-Guaíba 3 C1 and C2

29.0

-

38.0

230

Mar/18

Nov/44**

TL Guaíba 3 Candiota CD

445.7

-

279.0

525

Mar/18

Nov/44**

TL Guaíba 3 – Povo Novo C2

248.6

-

245.0

525

Mar/18

Nov/44**

TL Marmeleiro 2 – Santa Vitória do Palmar 2

56.9

-

48.0

525

Mar/18

Nov/44**

TL Povo Novo – Marmeleiro 2

168.9

-

152.0

525

Mar/18

Nov/44**

TL Nova Santa Rita-Guaíba 3 C2

56.3

-

40.0

525

Mar/18

Nov/44**

Portioning Osório 2 - Lagoa dos Barros em Osório 3

2.1

-

4

230

Mar/18

Nov/44**

PortioningTL Passo Fundo - Nova Prata 2 C1 and C2 em Vila Maria

2.6

-

1.0

230

Mar/18

Nov/44**

Portioning Santo Ângelo - Maçambará

2.8

-

3.3

230

Mar/18

Nov/44**

Portioning. Bajé – Pres. Médici SS CTA

3.9

-

-

230

Mar/18

Nov/44**

Portioning TL Nova Santa Rita – Povo Novo in Guaíba 3

11.8

-

-

525

Mar/18

Nov/44**

Development completed in Sep / 14 , however the commercial Operation depends on the completion of the SE Candiota .
** Through ANEEL energy auction , from new projects , the Company won in 2014 , the lot "A" Auction 004/2014 , with projects in Rio Grande do Sul .

147


 
 

 

 

 

11.2.1.2.Substations

 

SS

Investment

(R$ million)

Up to 4Q14

(R$ million)

Transformation Capacity

Location

Beginning of Operation

End of Concession

SS Garopaba –Implementation of 2 EL modules

6.23

0.62

0.00

SC

Forecasted

Dec/15

Dec/42

SS Palhoça Pinheira Implementation of 2 EL modules

5.20

3.22

0.00

SC

Forecasted

Sep/15

Dec/42

SS Nova Prata 2 Implementation of 2 EL modules

9.31

5.55

0.00

RS

Forecasted

Mar/15

Dec/42

SS Joinville Norte –Enlargement and Installation of 2 capacitors 230kV – 2x100MVA

12.31

7.04

200

SC

Forecasted

Feb/15

Dec/42

SS – Foz do Chapecó Enlargement of 3rd generator / 230/138kV

11.79

6.53

100

RS

Forecasted

May/15

Jun/44

SS Alegrete–Generator transfer /69/13.8/13.8kV

7.56

6.10

17

RS

Nov/14*

Dec/42

SS Joinville SC – Implementation of two modules of line entrance

3.55

0.15

0.00

SC

Forecasted

Sep/15

Dec/42

SS Ivinhema 2 (enlargement / 230/138 kV)

24.90

2.78

300

MS

Forecasted

Jan/16

Jan/44

SS Siderópolis – enlargement K – – Implementation of two modules of line entrance 69 KV

1.53

0.06

0.00

SC

Forecasted

Dec/15

Dec/42

SS Foz do Chapecó – enlargement D – – Implementation of one modules of line entrance 138 KV

1.69

0.33

0.00

RS

Forecasted

Dec/15

Jun/44

SS Biguaçu – Enlargement “G” – 230/138/13.8 KV

14.68

0.14

150

SC

Forecasted Apr/16

Dec/42

SS Biguaçu - Enlargement "J"

46.91

0.13

672

SC

Sep/16

Mar/35

SS Canoinhas - Enlargement "G"

7.24

0.11

50

SC

Sep/16

Dec/42

SS Desterro - Enlargement "A"

11.92

0.31

150

SC

Sep/16

Dec/42

SS Joinville Norte - Enlargement "E"

13.23

0.11

150

SC

Sep/16

Dec/42

SS LAJEADO GRANDE II –Installation of the 2nd self -transformer 230/138 kV - 75 MVA andconnections 230kV and 138kV.

12.26

0.02

75

SC

Nov/16

Oct/40

SSs Reinforcements: Gravataí, Gravataí 2, Salto Osório, Curitiba, Areia

3.40

2.31

0.00

PR

Jun/15

Dec/42

SS Canoinhas - Enlargement "F"

7.93

-

150

SC

Jan/18

Dec/42

SSs Reinforcement: Farroupilha, Florianópolis, Ilhota, Palhoça, Areia

1.47

0.05

0.00

RS and SC

2016

Dec/42

SS Viamão 3 EL 230

6.1

-

-

RS

Mar/18

Nov/44**

SS 525/230/138 kV Capivari do Sul 525/230 (3+1)x 224 MVA e 230/138 kV 2x100 MVA

188.6

-

1,096

RS

Mar/18

Nov/44**

SS Gravataí EL 525

14

-

-

RS

Mar/18

Nov/44**

SS Guaíba 3 EL 525

16.9

-

-

 

Mar/18

Nov/44**

SS 230 kV Vila Maria – 2xATF 230/138 kV

41.9

-

150

RS

Mar/18

Nov/44**

SS Gravataí 3 EL 230 OSO3

3.9

-

-

RS

Mar/18

Nov/44**

SS 230 kV Osório 3 – nova

17.5

-

-

RS

Mar/18

Nov/44**

SS 230 kV Porto Alegre 1 (isolated to SF6 – new) – 230/69 kV

76.7

-

166

RS

Mar/18

Nov/44**

SS Porto Alegre 12 EL 230

5.4

-

-

RS

Mar/18

Nov/44**

SS Porto Alegre 8 EL 230

3.3

-

-

RS

Mar/18

Nov/44**

SS Alegrete 2 EL 230 LVE3

4.1

-

-

RS

Mar/18

Nov/44**

SS Cerro Chato EL 230 LVE3

2.8

-

-

RS

Mar/18

Nov/44**

SS Livramento 2 Adequation SA

0.1

-

-

RS

Mar/18

Nov/44**

SS 230 kV Livramento 3 - compensator (-100/+100) MVAr

130.4

-

-

RS

Mar/18

Nov/44**

SS 230 kV Maçambará 3

28.3

-

-

RS

Mar/18

Nov/44**

SS Santa Maria 3 EL 230 LVE3

10.4

-

-

RS

Mar/18

Nov/44**

SS Guaíba 2 2EL GUA3

6.4

-

-

RS

Mar/18

Nov/44**

SS 525/230 kV Candiota 2 – with ATR transformator and bar reactors 525 kV (6+1 res) x 224 MVA – (3+1 res) x50 MVAr

127.8

-

1,768

RS

Mar/18

Nov/44**

SS 525 kV/230 kV Guaíba 3 ATR (6+1) x 224 MVA

261.8

-

1,568

RS

Mar/18

Nov/44**

SS Gravataí EL 525 GUA3

9.4

-

-

RS

Mar/18

Nov/44**

SS Marmeleiro 2 2EL 525 SPA2 PNO

49.8

-

-

RS

Mar/18

Nov/44**

SS Nova Santa Rita EL 525 GUA3

10.5

-

-

RS

Mar/18

Nov/44**

SS Povo Novo 2EL 525 GUA3 MRO2

50.6

-

-

RS

Mar/18

Nov/44**

SS Sta Vitória do Palmar 2EL 525 MRO2

22.7

-

-

RS

Mar/18

Nov/44**

* Powered pending procedures for immobilization and its revenue by the NOS.
** Through ANEEL energy auction , from new projects , the Company won in 2014 , the lot "A" Auction 004/2014 , with projects in Rio Grande do Sul .

148


 
 

 

 

 

11.2.2.SPEs

 

11.2.2.1.Transmission lines

 

SPE

From - To

Participation

%

Total of investment

R$ million

Invest. up to 4Q14 R$ million

Extension

of lines - Km

Tension

(kV)

Beginning of Operation

End of Concession

Marumbi Transmissora de Energia S/A

TL 525 KV Curitia / Curitiba Leste (PR)

20

60.47

51.18

28

525

Mar/15

May/42

Transmissora Sul Litorânea de Energia S/A

TL Nova santa Rita – Povo Novo, CS

51

265.53

235.70

268

525

Mar/15

Aug/42

Fronteira Oeste Transmissora de Energia S.A.*

TL Santo Ângelo/Maçambará, in 230 Kv

TL Pinhalzinho/Foz do Chapecó, simgle circuit, C1 and C2 PortioningTL 138KV Alegrete 1 – Santa Maria 1

51

95.87

8.35

205

230

Apr/16

Jan/44

40

230

Feb/16

2

230

Jul/15

Paraíso Transmissora de Energia S/A**

TL Paraíso 2-Chapadão C2

24.5

137.4

-

65

230

Sep/17

Nov/44

TL Campo Grande 2-Paraíso 2 C2

200

230

Mar/18

Portioning TL Campo Grande 2 – Chapadão - Paraíso 2

-

230

Sep/17

* TL Sant'Angelo - Maçambará is scheduled for Apr / 16 while the TL Pinhalzinho / Foz do Chapecó is scheduled for Feb / 16.
** Part E" ANEEL Auction 004/2014 , with the winner the Consortium , formed by Eletrosul , Elecnor and Copel.

149


 
 

 

 

11.2.2.2. Substations

 

 

SPE

SS

Participation

(%)

Investiment

(R$ million)

Transformation capacity (MVA)

Location (State)

Beginning of Operation

End of Concession

Marumbi Transmissora de Energia S/A

SS Curitiba Leste1 banco 3x224MVA 525/230kV

20

56.79

672

PR

Mar/15

May/42

Transmissora Sul Litorânea de Energia S.A.

SS Marmeleiro 2 525 kV / Compensator ±200 Mvar

51

211.16

-

RS

Jan/15

Aug/42

EnlargementSS Nova Santa Rita 525KV

19.86

-

RS

Mar/15

Aug/42

Fronteira Oeste Transmissora de Energia S.A. *

SS Pinhalzinho, em 230/138 kV (ATF1), SS Pinhalzinho, in 230/138 kV (ATF 2 and ATF3) and enlargement SS Maçarambá, Foz do Chapecó and Santo Angelo

51

58.69

450

RS

Feb/16

Jan/44

Enargement ofSS Santa Maria 3, 230/138 kV

23.75

166

RS

Jul/15

Jan/44

Paraíso Transmissora de Energia S/A**

SS Campo Grande 2 EL 230 PAR2

 

60.1

-

RS

Mar/18

Jan/44

SS Chapadão EL PAR2

24.5

-

RS

Mar/18

SS 230/138 kV Paraíso 2

 

300

RS

Sep/17

* The expansion of SEs Maçambará and Sant'Angelo and the SE Pinhalzinho , are scheduled for Apr / 16.

** Part E" ANEEL Auction 004/2014 , with the winner the Consortium , formed by Eletrosul , Elecnor and Copel. SPE in constitution.

 

 

 

 

 

 

 

 

 

150


 
 

 

 

12.Loans and financing – R$ million

 

Local currency – LC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Index

BNDES/BRDE

22.7

21.4

20.8

20.1

May/2019

TJLP + 4.5% p.y.

BNDES

1,116.9

1,094.3

1,073.8

1,053.4

Until Aug/2028

Currency Basket + 4% p.y.

BNDES/Banco do Brasil

377.2

365.7

354.8

343.7

Until Jan/2028

TJLP + 2.65% p.y.

Banco do Brasil

251.1

251.1

251.3

251.4

Nov/2023

115% of CDI

Eletrobras

1,114.3

1,117.0

1,131.4

1,716.6

Until Mar/2030

RGR/IPCA + 7% py/Interest rate + 0.5% p.y.

Finep

-

-

-

3.6

Oct/2021

TJLP + 2.00% p.y.

 

Foreign currency – FC

 

Credor

Balance

03.31.13

Balance

06.30.13

Balance

09.30.13

Balance

12.31.13

Due Date

Currency

Eletrobras

186.1

178.6

184.7

191.2

Until Dec/2042

Euros

 

13.Contracts

 

13.1.Loans and financing

 

13.1.1.Parent company – R$ million

 

Loans and financing

2015

2016

2017

2018

2019

2020

After

2020

Total

(LC + FC)

By activity

284.2

306.0

405.0

404.6

379.2

349.8

1,451.0

3,579.8

Generation

133.5

146.9

194.4

194.2

182.0

167.9

696.5

1,715.4

Transmission

150.7

159.1

210.6

210.4

197.2

181.9

754.5

1,864.4

By creditor

284.2

306.0

405.0

404.6

379.2

349.8

1,451.0

3,579.8

Eletrobras

100.0

122.1

220.5

224.6

220.2

209.9

822.2

1,819.5

Others

184.2

183.9

184.5

180.0

159.0

139.9

628.8

1,476.1

 

13.1.2.SPE – R$ million

 

Uirapuru Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

6.1

6.0

6.0

6.0

1.5

-

-

Generation

         

-

-

Transmission

6.1

6.0

6.0

6.0

1.5

-

-

By creditor

6.1

6.0

6.0

6.0

1.5

-

-

BRDE

6.1

6.0

6.0

6.0

1.5

-

-

 

Transmissora Sul Litorânea de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

476.5

-

-

-

-

-

-

Generation

 

-

-

-

-

-

-

Transmission

476.5

-

-

-

-

-

-

By creditor

476.5

-

-

-

-

-

-

Santander

127.1

-

-

-

-

-

-

Banco ABC Brasil

137.6

-

-

-

-

-

-

Banrisul

211.8

-

-

-

-

-

-

151


 
 

 

 

Transmissora Sul Brasileira de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

20.8

20.8

20.8

20.8

20.8

20.8

141.1

Generation

           

 

Transmission

20.8

20.8

20.8

20.8

20.8

20.8

141.1

By creditor

20.8

20.8

20.8

20.8

20.8

20.8

141.1

BNDES

20.8

20.8

20.8

20.8

20.8

20.8

141.1

 

Teles Pires Participações

 

Loans and financing

2015

2016

2017

2018

2019

2020

After2020

By activity

47.318

154.443

166.451

167.296

176.584

176.584

2.497.772

Generation

47.318

154.443

166.451

167.296

176.584

176.584

2.497.772

Transmission

           

 

By creditor

47.318

154.443

166.451

167.296

176.584

176.584

2.497.772

BNDES

22.999

106.040

118.048

118.893

128.181

128.181

1.941.271

Bonds

24.319

48.403

48.403

48.403

48.403

48.403

556.501

 

Santa Vitória do Palmar Holding S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

16.1

38.8

38.8

39.7

38.8

38.8

502.9

Generation

16.1

38.8

38.8

39.7

38.8

38.8

502.9

Transmission

           

 

By creditor

16.1

38.8

38.8

39.7

38.8

38.8

502.9

BNDES

10.7

25.8

25.8

25.8

25.8

25.8

273.0

BRDE

5.4

13.0

13.0

13.0

13.0

13.0

137.1

Bonds

     

0.9

   

92.8

 

Norte Brasil Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

74.396

72.020

70.585

72.190

80.902

87.780

820.248

Generation

           

 

Transmission

74.396

72.020

70.585

72.190

80.902

87.780

820.248

By creditor

74.396

72.020

70.585

72.190

80.902

87.780

820.248

BNDES

72.114

70.020

70.020

70.020

70.020

70.020

631.256

Bonds

2.282

-

565

2.170

10.882

17.760

188.992

 

Marumbi Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

2.5

5.0

4.8

4.6

4.4

4.3

9.2

Generation

           

 

Transmission

2.5

5.0

4.8

4.6

4.4

4.3

9.2

By creditor

2.5

5.0

4.8

4.6

4.4

4.3

9.2

BNDES

2.5

5.0

4.8

4.6

4.4

4.3

9.2

 

Livramento Holding S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

10.7

10.2

10.2

10.2

10.2

10.2

97.2

Generation

10.7

10.2

10.2

10.2

10.2

10.2

97.2

Transmission

           

 

By creditor

10.7

10.2

10.2

10.2

10.2

10.2

97.2

BNDES

10.7

10.2

10.2

10.2

10.2

10.2

97.2

 

 

 

 

152


 
 

 

 

Empresa de Transmissão do Alto Uruguai S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

7.4

7.2

7.2

0.6

9.9

 

 

Generation

           

 

Transmission

7.4

7.2

7.2

0.6

9.9

 

 

By creditor

7.4

7.2

7.2

0.6

9.9

 

 

BNDES

7.3

7.2

7.2

0.6

   

 

BNPP (Bonds)

       

9.9

 

 

 

ESBR Participações S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

Generation

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

Transmission

 

           

Energy Trading

 

           

By creditor

570.4

570.4

570.4

570.4

570.4

570.4

7,985.3

BNDES

284.0

284.0

284.0

284.0

284.0

284.0

3,975.6

Banco do Brasil

80.8

80.8

80.8

80.8

80.8

80.8

1,130.7

CEF

80.8

80.8

80.8

80.8

80.8

80.8

1,130.7

Bradesco

58.2

58.2

58.2

58.2

58.2

58.2

814.1

Banco Itaú BBA

54.5

54.5

54.5

54.5

54.5

54.5

763.2

BNB

12.2

12.2

12.2

12.2

12.2

12.2

171.0

 

Chuí Holding S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

103.6

         

 

Generation

103.6

         

 

Transmission

           

 

By creditor

103.6

         

 

Banco ABC Brasil S.A – SPEs

51.8

         

 

Banrisul

51.8

         

 

                                               

Costa Oeste Transmissora de Energia S.A.

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

4.7

4.6

4.4

4.2

4.1

3.9

9.6

Generation

           

 

Transmission

4.7

4.6

4.4

4.2

4.1

3.9

9.6

By creditor

4.7

4.6

4.4

4.2

4.1

3.9

9.6

BNDES

4.7

4.6

4.4

4.2

4.1

3.9

9.6

 

Fronteira Oeste Transmissora de Energia

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

-

-

-

-

-

-

-

Generation

-

-

-

-

-

-

-

Transmission

-

-

-

-

-

-

-

By creditor

-

-

-

-

-

-

-

BNDES

-

-

-

-

-

-

-

* There is no loan and financing on 12.31.14

 

 

 

 

 

 

153


 
 

 

 

Chuí IX

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

25.634

         

 

Generation

25.634

         

 

Transmission

           

 

By creditor

25.634

         

 

Bonds

25.634

         

 

 

Hermenegildo I

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

81.105

         

 

Generation

81.105

         

 

Transmission

           

 

By creditor

81.105

         

 

Bonds

81.105

         

 

 

Hermenegildo II

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

81.105

         

 

Generation

81.105

         

 

Transmission

           

 

By creditor

81.105

         

 

Bonds

81.105

         

 

 

Hermenegildo III

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

By activity

68.493

         

 

Generation

68.493

         

 

Transmission

           

 

By creditor

68.493

         

 

Bonds

68.493

         

 

 

14.Number of employees

 

14.1.By tenure

 

Generation

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

42

39

36

38

6 to 10

35

41

46

46

11 to 15

05

05

05

6

16 to 20

01

02

02

2

21 to 25

09

10

10

10

beyond 25

01

01

01

1

Total

93

98

100

103

 

 

 

 

 

 

 

154


 
 

 

 

Transmission

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

82

79

70

70

6 to 10

202

200

204

202

11 to 15

133

115

114

115

16 to 20

37

58

62

61

21 to 25

154

152

151

145

beyond 25

86

86

87

85

Total

694

690

688

678

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

168

155

141

139

6 to 10

126

135

148

147

11 to 15

61

51

50

51

16 to 20

2

14

15

15

21 to 25

133

134

135

130

beyond 25

61

61

60

55

Total

551

550

549

537

 

14.2.By region

 

State

1Q14

2Q14

3Q14

4Q14

Santa Catarina

994

994

995

983

Rio Grande do Sul

129

132

133

131

Paraná

144

143

142

138

Mato Grosso do Sul

49

47

45

44

Rondônia

22

22

22

22

 

14.3.By departments

 

Departments

1Q14

2Q14

3Q14

4Q14

Field

787

788

788

781

Administrative

551

550

549

537

 

15.Complementary work force - N/A

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.04

0.00

0.18

0.71

0.93

 

155


 
 

 
 

Balance Sheet

(R$ thousands)

 

Assets

12.31.14

12.31.13

Current Assets

 

 

Availabilities

25,717

17,103

Clients (Consumers and Resellers)

98,614

72,854

Financing and Loans

-

-

Marketable Securities

-

-

Dividends to receive (Remuneration from equity participation)

-

-

Fiscal Assets diferred (taxes and contributions)

3,860

26,720

Income tax and Social Contribution

-

-

Reimbursement Right

62,346

-

Stored Materials

53,134

113,942

Financial Asset

-

-

Receivables – 12,783/13 law

-

-

Others

1,312

42,755

Current Assets Total

244,983

273,374

 

 

 

Non-Current Assets

 

 

Clients (Consumers and Resellers)

-

-

Financing and Loans

-

-

Marketable Securities

-

-

Fiscal Assets diferred (taxes and contributions)

27,834

19,741

Income tax and Social Contribution

-

-

Reimbursement Right – CCC (12,111 law)

-

-

Linked deposits

6,653

11,954

Financial Asset

-

-

Receivables – 12,783/13 law

-

-

Others

105,778

-

Advance to equity participation

-

-

 

140,265

31,695

INESTMENTS

-

-

FIXED ASSETS

1,571,944

1,570,907

INTANGIBLES

2,314

1,720

 

 

 

Non-Current Assets Total

1,714,523

1,604,322

Assets Total

1,959,506

1,877,696

 

156


 
 

 

 

 

Liabilities and Stockholders’ Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

264,375

208,185

Loans and financing

224,318

271,350

Taxes and social contributions

14,123

9,098

Income tax and Social Contribution

-

-

Advance from clients (Advance sell of energy)

-

-

Remuneration to shareholders (dividends to pay)

66,195

59,687

Estimated Obligations

14,823

20,442

Provisions for Contingencies

32,082

23,654

Post-employment Benefit (Complementary Pension Fund)

-

3,346

Onerous Contracts

-

-

Concessions to pay - UBP

-

-

Sectorial Charges (regulatory taxes)

1,863

12,308

Incentive to personnel retirement

-

-

Others

19,486

24,889

 

637,265

632,959

Non-Current Liabilities

 

 

Suppliers

21,284

-

Loans and financing

1,830,496

1,304,622

Taxes and social contributions

-

-

Income tax and Social Contribution

-

-

Derivatives

-

-

Advance from clients (Advance sell of energy)

-

-

Estimated Obligations

1,611

5,042

Provisions for Contingencies

-

-

Provision for Onerous Contracts

-

-

Post-employment Benefit (Complementary Pension Fund)

3,511

26,583

Leasing

-

-

Sectorial Charges (regulatory taxes)

-

-

Advance for future capital increase

18,391

6,218

Incentive to personnel retirement

-

-

Others

-

-

 

1,875,293

1,342,465

Stockholders’ Equity

 

 

Social Capital

845,510

845,510

Capital reserve

-

-

Profit Reserve

2,596

2,596

Additional proposed Dividend

-

-

Accrued income (losses)

-1,369,341

-889,229

Other comprehensive income

-31,817

-56,605

Non-controlling shareholders participation

-

-

Stockholders’ Equity Total

-553,052

-97,728

Total Liabilities and Stockholders’ Equity

1,959,506

1,877,696

 

                                                                                                                                                                                      
 

157


 
 

 

 

Statement of Income 

(R$ thousands)

 

 

12.31.14

12.31.13

Operating Revenue

 

 

Supply for Distributors

513,741

334,524

Supply

-

-

Short term Electric Energy

-

-

Other Operating Revenue

3,582

3,624

Deductions to Revenue

-43,169

-39,794

Net Operating Revenue

474,154

298,354

 

 

 

Operational Costs

 

 

Electric Energy purchased for resale

-311,114

-186,395

Charges on the use of electric grid

-32,074

-26,237

Fuel for production of electric Energy - CCC

-52,464

-9,658

Construction Cost

-

-

 

 

 

Operating Expenses

 

 

Personnel, material and third party services

-276,603

-289,746

Remuneration and Reimbursement

-

-

Depreciation and amortization

-74,106

-70,971

Donations and Contributions

-

-

Provisions

78,179

-82,703

Others

-22,098

-13,826

Operating Costs and Expenses

-690,280

-679,536

 

 

 

Operating Result before Financial Result

-216,126

-381,182

 

 

 

Financial Result

-263,987

-90,861

Result before Income tax and Social Contribution

-480,113

-472,043

 

 

 

Current Income tax and Social Contribution

-

-

Diferred Income tax and Social Contribution

-

-

Net income for the period

-480,113

-472,043


 

 

 

158


 
 

 

 

Cash Flow  

(R$ thousands)

 

Cash Flow

12.31.14

12.31.13

Operating Activities

   

Income before income tax, social contribution

-480,109

-472,043

Depreciation and amortization

78,181

76,188

Amortization of Intangible assets – Distribution / Transmission

0

0

Monetary / Exchange net variation

16,129

-14,990

Financial Charges

175,517

47,852

Equity method result

0

0

Provision for uncovered liability

0

0

Provision for credits of questionable liquidation

0

0

Provision for contingencies

8,428

2,558

Provision for realignment of staff plan

0

0

Provision for impairment

-87,294

74,012

Provision for onerous contract

0

0

Provision for losses of financial asset

0

0

Charges of reversal global reserve

0

0

Adjustment to present value / market value

0

0

Minority participation in the result

0

0

Charges on shareholders funds

6,508

4,535

Revenue of Financial Asset by IRR

0

0

Derivatives

0

0

Others

50,355

-3,394

Increase/Decrease in operating assets/liabilities

-36,769

-48,192

Cash from operating activities

-269,054

-333,474

 

   

Payment of financing charges

-55,720

-35,130

Payment of charges of reversal global reserve

0

0

Financial charges receiving

0

0

Receiving of investment remuneration on equity participation

0

0

Receiving of annual allowed revenue (financial asset)

0

0

Receiving of indemnities of financial asset

0

0

Payment of income tax and Social Contribution

0

0

Payment of complementary pension fund

0

0

Payment of lawsuit contingencies

0

0

Lawsuits deposits

5,301

-1,027

Net cash from operating activities

-319,473

-369,631

 

   

Financing Activities

   

Loans and Financing obtained

989,875

473,238

Payment of loans and Financing - Principal

-631,072

-110,563

Payment to shareholders

0

0

Payment of refinancing of taxes and social contributions - principal

0

0

Receiving of future capital increase

13,794

60,395

Others

0

0

Net cash from financing activities

372,597

423,070

 

   

Investment Activities

   

Fixed Asset Acquisition

-43,500

-62,957

Intangible Asset Acquisition

-1,010

-174

Concession Asset Acquisition

0

0

Concession of cash in advance for future capital Increase

0

0

Acquisition/Contribution of Capital in equity participation

0

0

Others

0

0

Net cash from Investment Activities

-44,510

-63,131

 

   

Increase (decrease) in cash and cash equivalent

8,614

-9,692

 

   

Cash and cash equivalent – beginning of period - 12/31/13

17,103

26,795

Cash and cash equivalent – end of period – 12/31/14

25,717

17,103

 

8,614

-9,692

 

 

 

 

159


 
 

 

 

Analysis of the result

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 113.6% lower than reported in the previous quarter, from a net loss of R$ 65.1 million in 3Q14, to a net loss of R$ 139.2 million in 4Q14, mainly due to factors described below.

 

Operating Revenue

 

The electric energy supply increased by 120.3%, from R$ 105.7 million in 3Q14 to R$ 232.9 million in 4Q14, mainly due to register of revenues in previous quarters of Candiota III plant.

 

Operating Expenses

 

The electric energy purchased for resale increased by 1,316.5%, from R$ 12.2 million in 3Q14 to R$ 172.9 million in 4Q14, mainly due to the increase of energy purchased from third parties.

 

The fuel for electric energy production, net of the CCC fund reimbursement, increased by 1,978.3%, from R$ 2.2 million in 3Q14 to R$ 44.9 million in 4Q14, mainly due to transfers to reduce CCC funding.

 

The personnel expenses, materials and third-part related services decreased by 24.8%, from R$ 71.8 million in 3Q14 to R$ 54 million in 4Q14, mainly due to the reduction of personnel expenses.

 

The operational provisions decreased by 15,011.4% from a provision of R$ 0.5 million in 3Q14 to a reversal of R$ 78.7 million in 4Q14, mainly due to the reversal of impairment of Candiota Stage B.

 

Financial Result

 

The debt charges increased by 42%, from R$ 53.3 million in 3Q14 to R$ 75.6 million in 4Q14, mainly due to the increase in charges arising from borrowings from Eletrobras.

 

The net exchange variations decreased by 397.6%, from a revenue of R$ 13.2 million in 3Q14 to an expense of R$ 39.3 million in 4Q14, mainly due to the devaluation of the Real, which affected the import of equipment balances.

 

160


 
 

 

 

Market Data

 

1. Generation Assets and Energy generated

 

 

Unit

Installed Capacity

(MW)

Guaranteed Energy

(MW Average)

Energy Generated (MWh)

1Q14

2Q14

3Q14

4Q14

2014

P. Médici (Candiota)

446

251,500

111,708.68

109,236.18

122,418.14

166,757.12

510,120.12

Candiota III – Fase C

350

303,500

449,521.64

575,398.52

542,829.85

385,068.83

1,952,818.84

S. Jerônimo (Candiota)

20

12,600

-

-

-

-

-

Nutepa (Candiota)

24

6,100

-

-

-

-

-

Total

840

573,7

561,230.32

684,634.70

665,247.99

551,825.95

2,462,938.96

 

 

Unit

Location

(State)

Beginning of Operation

End of Operation

P. Médici (Candiota)

RS

Jan/74

Jul/15

Candiota III – Fase C

RS

Jan/11

Jul/41

S. Jerônimo (Candiota)

RS

Apr/53

Jul/15

Nutepa (Candiota)

RS

Feb/68

Jul/15

 

2. Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

81,840,000

359,640,000

298,080,000

297,945,000

1,037,505,000

R$ million

14.700

64.690

47.773

47.852

175.015

Others

MWh

-

-

-

-

-

R$ million

-

-

-

-

-

Total

MWh

81,840,000

359,640,000

298,080,000

297,945,000

1,037,505,000

R$ million

14.700

64.690

47.773

47.852

175.015

 

3. Energy sold

 

Buyer

Sale model

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Eletrobras System

A 1ºLEN

A 2ºLEE

A 4ºLEE

120.943

28.82

10.42

639,436.16

229,561.42

77,009.02

123.457

26.017

9.114

639,478,838

202,989,578

66,306,220

126.386

27.932

9.698

644,736,000

213,081,329

68,637,344

128.249

29.485

10.317

664,736,000

221,427,56

71,752,18

499.035

112.254

39.549

2,588,387.00

867,059.89

283,704.76

B

-

-

-

-

-

-

 

 

 

 

Others

A

-

-

-

-

-

-

 

 

 

 

B

-

-

-

-

-

-

 

 

 

 

Total

A

160.183

946,007

158.588

908,775

164.016

926,455

168.051

957,916

650.838

3,739,151

B

-

-

-

-

-

-

-

 

 

 

A - Through auction

B - Through free market agreements or bilateral contracts

 

161


 
 

 

 

 

4. CCEE settlement (Spot and MRE)

 

 

Unit

1Q14

2Q14

3Q14

4Q14

2014

Net

R$ million

93.527

61.647

78.551

103.448

150.119

MWh

141,119,012

174,736,111

101,250,793

134,738,006

269,605,898

MWaverage

64,704

80,007

45,856

61,023

30.777

 

5. Fuel used to produce electricity

 

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Coal

T

614,886

38

657,706

39

617.907

36

521,221

48

2,346,210

161

Fuel oil

Kg

3,740,690

11

9,899,120

16

9,026.120

14

7,339,550

10

33,828,970

51

Diesel Oil

L

10,000

-

20,000

-

12.600

-

4,300

-

54,400

-

Total

 

 

49

 

55

 

50

 

58

 

212

 

6. Losses in generation - %

 

 

1Q14

2Q14

3Q14

4Q14

2014

P. Médici (Candiota)

25.82

28.47

25.65

20.35

23.73

Candiota III – Fase C

12.08

11.47

11.43

12.20

11.72

S. Jerônimo

100

100

100

100

100

Nutepa

100

100

100

100

100

 

7. Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

150.23

153.30

156.54

159.85

154.98

 

8. Extension of transmission lines - Km  - N/A

 

9. Transmission losses - % - N/A

 

10. Main investments of parent company– R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

Budget 2014*

Generation

 

 

 

 

 

-

Generation system maintenance - MSGEE

1.546

8.858

2.872

341

13.617

74.000

Environmental impact mitigation

2.394

2.352

3.210

1.143

9.099

50.237

Phase A/B UPME revitalization

846

1.856

591

-8

3,285

18.000

Other

56

100

2.465

2

2.623

4.000

Total

4.842

13.166

9.138

1.478

28.624

146.237

 

11.New investments – N/A

 

 

162


 
 

 

 

12.Loans and financing – R$ million

 

Local currency – LC

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Index

Eletrobras

539

548

523.501

85.718

12/30/2021

IPCA + Spread+1.25%p.y.

Eletrobras

155

156

108.918

516.106

06/20/2016

IPCA + Spread + 1.80% p.y.

Eletrobras

102

104

92.189

79.824

12/20/2022

IPCA + Spread+6.60p.y.

Eletrobras

84

77

69.774

59.661

01/30/2017

5% p.y.

Eletrobras

25

24

22.515

20.373

05/30/2018

5% p.y.

Eletrobras

56

58

59.469

61.243

12/30/2024

Selic + 0.5% p.y.

Eletrobras

39

40

41.620

42.862

12/30/2024

Selic + 0.5% p.y.

Eletrobras

10

11

10.761

11.082

12/30/2024

Selic + 0.5% p.y.

Eletrobras

14

14

14.428

14.858

12/30/2024

Selic + 0.5% p.y.

Eletrobras

10

11

11.010

11.339

12/30/2024

Selic + 0.5% p.y.

Eletrobras

43

44

45.696

47.059

12/30/2024

Selic + 0.5% p.y.

Eletrobras

30

32

32.344

27.030

12/30/2024

Selic + 0.5% p.y.

Eletrobras

202

209

214.594

220.996

12/30/2024

Selic + 0.5% p.y.

Eletrobras

9

9

9.282

9.559

12/30/2024

Selic + 0.5% p.y.

Eletrobras

43

44

45.708

0.000

12/30/2024

Selic + 0.5% p.y.

Eletrobras

13

14

14.156

14.578

12/30/2024

Selic + 0.5% p.y.

Eletrobras

44

45

46.467

47.854

12/30/2024

Selic + 0.5% p.y.

Eletrobras

14

14

14.377

14.806

12/30/2024

Selic + 0.5% p.y.

Eletrobras

21

21

22.007

22.663

12/30/2024

Selic + 0.5% p.y.

Eletrobras

36

37

38.458

39.605

12/30/2024

Selic + 0.5% p.y.

Eletrobras

11

11

11.613

11.960

12/30/2024

Selic + 0.5% p.y.

Eletrobras

27

28

29.042

29.908

12/30/2024

Selic + 0.5% p.y.

Eletrobras

26

27

27.470

28.289

12/30/2024

Selic + 0.5% p.y.

Eletrobras

41

42

43.123

44.419

12/30/2024

Selic + 0.5% p.y.

Eletrobras

20

20

20.879

0.000

12/30/2024

Selic + 0.5% p.y.

Eletrobras

15

15

15.426

0.000

12/30/2024

Selic + 0.5% p.y.

Eletrobras

5

5

5.516

0.000

12/30/2024

Selic + 0.5% p.y.

Eletrobras

8

8

8.305

0.000

12/30/2024

Selic + 0.5% p.y.

Eletrobras

44

45

44.699

0.000

03/30/2017

Selic + 0.5% p.y.

Eletrobras

5

5

4.646

0.000

03/30/2017

Selic + 0.5% p.y.

Eletrobras

-

37

36.996

0.000

04/30/2018

Selic + 0.5% p.y.

Eletrobras

-

7

7.112

0.000

04/30/2016

Selic + 0.5% p.y.

Eletrobras

-

7

6.508

0.000

02/29/2016

Selic + 0.5% p.y.

Eletrobras

-

34

34.320

0.000

03/30/2017

Selic + 0.5% p.y.

Eletrobras

-

7

6.882

0.000

05/30/2016

Selic + 0.5% p.y.

Eletrobras

-

22

22.403

0.000

05/30/2018

Selic + 0.5% p.y.

Eletrobras

-

37

36.483

0.000

06/30/2018

Selic + 0.5% p.y.

Eletrobras

-

-

22.058

0.000

09/30/2022

Selic + 0.5% p.y.

Eletrobras

-

-

49.643

0.000

12/30/2021

Selic + 0.5% p.y.

Eletrobras

-

-

7.185

0.000

06/30/2022

Selic + 0.5% p.y.

Eletrobras

-

-

51.311

52.290

12/30/2020

Selic + 0.5% p.y.

Eletrobras

-

-

10.177

0.000

09/30/2022

Selic + 0.5% p.y.

Eletrobras

-

-

6.881

0.000

06/30/2022

Selic + 0.5% p.y.

Eletrobras

-

-

-

58.333

03/22/2015

Selic

Eletrobras

-

-

-

482.399

07/30/2022

Interest rate CDI 119.5% p.y.+ Administrative rate 0.50%p.y.

 

163


 
 

 

 

Foreign currency – FC – N/A

 

13.Contracts

 

13.1.Loans and financing – R$ million

 

Loans and financing

2015

2016

2017

2018

2019

2020

After 2020

Total

(LC + FC)

By activity

 

 

 

 

 

 

 

 

Generation

224,318

183,573

204,512

198,665

196,170

299,126

748,449

2,054,814

By creditor

 

 

 

 

 

 

 

 

Eletrobras

224,318

183,573

204,512

198,665

196,170

299,126

748,449

2,054,814

 

14.Number of employees

 

14.1.By tenure

 

Generation

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

2014

Up to 5

255

260

262

259

259

6 to 10

59

58

58

58

58

11 to 15

-

01

01

01

01

16 to 20

25

25

25

24

25

21 to 25

25

24

4

04

14

beyond 25

146

147

164

160

154

Total

510

515

514

506

511

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

2014

Up to 5

50

50

52

52

51

6 to 10

52

52

53

54

53

11 to 15

7

7

7

7

7

16 to 20

2

2

3

3

3

21 to 25

2

2

1

1

2

beyond 25

10

9

13

11

11

Total

123

122

129

128

127

 

14.2.By region

 

State

Number of employees

1Q14

2Q14

3Q14

4Q14

2014

Rio Grande do Sul

637

637

643

634

638

 

14.3.By departments

 

Department

Number of employees

1Q14

2Q14

3Q14

4Q14

2014

Campo

511

515

514

506

511

Administrativo

126

122

129

128

127

 

 

164


 
 

 

 

15.Complementary work force

 

Operational

1Q14

2Q14

3Q14

4Q14

2014

559

558

388

389

473

 

16.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

3.30

0.55

0.55

0.63

1.26

 

165


 
 

 

 

2. Distribution Companies

 

Company

Net

Operating Revenue

Service

Result

Income/Loss for

the Period

EBITDA

(R$ million)

EBITDA

Margin

2014

2013

2014

2013

2014

2013

2014

2013

2014

2013

Amazonas Energia

3,610

2,711

803

-852

-415

-1.655

1.085

-697

30.0

-25.7

Distribuição Alagoas

1,342

921

-21

-183

-95

-209

11

-157

0.8

-17.1

Distribuição Piauí

1,292

1,019

170

-373

37

-

201

-344

15.6

-33.7

Distribuição Rondônia

1,309

1,070

414

-279

293

-323

448

-248

34.2

-23.2

Distribuição Roraima

207

190

-64

24

-76

29

-55

33

-26.4

17.2

Distribuição Acre

374

343

94

-105

34

-152

108

-94

28.8

-27.4

Celg D*

1,259

-

253

-

125

-

282

-

22.4

-

* Information relating to the 4th quarter 2014.

 

Eletrobras System Distribution

 

Company

Extension of Distribution Lines (Km)

Number of Clients assisted

Number of municipalities served

Number of substations

Amazonas Energia

44,519

860,737

62

55

Distribuição Acre

19,052

240,039

22

15

Distribuição Alagoas

41,734

1,013,971

102

40

Celg-D

211,243

2,716,003

237

337

Distribuição Piauí

87,500

1,144,730

224

83

Distribuição Rondônia

57,129

580,859

52

57

Distribuição Roraima

3,508

102,078

01

03

 

Extension of Transmission Lines – Km

 

Company

Own

(a)

SPEs

(b)

Physical aggregation in 2014

Total

(a+b)

Amazonas

701

-

28

701

Geration and Transmission Companies

61,441

5,449

3,199

66,890

Total

62,142

5,449

3,227

67,591

(b) Company's participation in the enterprise

 

Installed Capacity – MW

 

Company

Own

(a)

SPEs

(b)

Physical aggregation in 2014

Total

(a+b)

Amazonas Energia

2,083

-

-

2,083

Distribuição Rondônia

03

-

-

03

Eletrobras

-

13

-

13

Generation and Transmission companies

39,179

2,878

1,048

42,587

Total

41,264

2,891

1,169

44,156

(b) Company's participation in the enterprise

* The physical aggregation of 2014 of distribution companies refers to the transfer of TPU Electron from Eletronorte to Amazonas Energia.

 

Energy sold – MWh*

 

 

2014

2013

Amazonas Energia**

6,191,116

5,843,457

Distribuição Acre

875,470

815,767

Distribuição Alagoas

3,335,540

3,190,949

Distribuição Piauí

3,016,471

2,800,824

Distribuição Roraima

701,637

619,300

Distribuição Rondônia

2,992,056

2,821,856

Total

17,112,446

16,092,153

Celg-D

3,034,958

-

* Do not consider the amount of “Own Consumption”

** Do not consider the short term energy

 

166


 
 

 

 

                                                                              

Balance Sheet

(R$ thousands)

 

Asset

Consolidated

12.31.14

12.31.13

Current Assets

   

Availabilities

62,606

84,656

Clients (Consumers and Resellers)

436,063

372,341

Marketable Securities

131,715

-

Deferred fiscal asset (taxes and Contributions)

27,099

34,063

Income Tax and Social Contributions

-

-

Reimbursement rights - CCC (12,111 law)

2,523,243

10,195,291

Linked Deposits

12,315

-

Stored materials

103,542

141,381

Financial Asset – Indemnitiable Concessions

89,590

-

Others

579,971

152,906

Current Assets Total

3,966,144

10,980,638

.

   

Non-current Assets

   

Clients (Consumers and Resellers)

78,774

53,619

Deferred fiscal asset (taxes and contributions)

2,100,973

1,749,861

Reimbursement rights - CCC (12,111 law)

2,959,326

-

Linked Deposits

338,333

270,213

Financial asset – Annual allowed revenue (Transmission)

3,024,112

3,039,230

Others

9,072

9,071

Advance for equity participation

-

-

 

8,510,590

5,121,994

INVESTMENT

12,938

7,678

FIXED ASSETS

1,376,407

1,257,715

INTANGIBLE ASSETS

620,842

194,303

Non-current Assets total

10,520,777

6,581,690

Assets total

14,486,921

17,562,328

 

167

 
                                                                                                                 

 
 

 

 

 

Liabilities and Stockholders’ Equity

Consolidated

12.31.14

12.31.13

Current Liability

   

Suppliers

2,439,763

4,841,004

Loans and Financing

646,856

472,434

Taxes and Social Contribution

47,341

60,835

Income Tax and Social Contribution

4,949

2,392

Reimbursement Obligations- CCC (12,111 Law)

-

7,783,701

Costumers advance

-

-

Fuel Consumption Account - CCC

-

-

Shareholders remuneration (dividends to pay)

-

-

Estimated Obligations

58,707

48,028

Provisions for contingencies

-

-

Post-Employment Benefits (Complementary Pension Fund)

-

1,022

Leasing

74,507

181,596

Onerous Contracts

-

-

Sector charges

3,072

-

Incentive to Early Retirement

-

-

Others

124,500

922,292

Current Liability Total

3,399,695

14,313,304

 

   

Non-Current Liability

   

Suppliers

7,326,768

599,631

Loans and Financing

1,517,563

715,349

Taxes and Social Contribution

-

-

Income Tax and Social Contribution

-

-

Reimbursement Obligations - CCC (12,111 Law )

2,208,958

2,009,423

Costumers advance

-

-

Estimated obligations

-

4,849

Provisions for contingencies

341,313

200,135

Provision for Onerous Contracts

-

295,259

Post-Employment Benefits (Complementary Pension Fund)

1,321

343

Leasing

1,252,154

1,891,628

Concessions to pay - UBP

-

-

Sector charges (regulatory taxes)

-

-

Other Comprehensive Income

-

-

Advance for future capital increase

-

-

Others

458,530

24,909

Non-Current Liability Total

13,106,607

5,741,526

 

   

Stockholders’ Equity

   

Social Capital

4,610,171

4,610,171

Capital Reserves

-

-

Profit reserves

-

-

Additional proposed dividend

-

-

Acumulated profit/loss

-6,627,299

-7,100,264

Other Comprehensive Income

-2,253

-2,409

Non-Controlling shareholders participation

-

-

 

   

Stockholders’ Equity Total

-2,019,381

-2,492,502

 

   

Non-Current Liability and Stockholders’ Equity Total

14,486,921

17,562,328

 

168


 
 

 

 

Statement of Income 

(R$ thousands)

 

 

Consolidated

12.31.14

12.31.13

Operating Revenue

   

Supply – Generation

1,093,805

1,137,447

Short term electric energy

1,769,706

299,589

Construction Plants Revenue

60,797

563,180

Electric Energy Supply - Distribution

689,159

577,656

Constructuion Revenue - Distribution

329,115

425,395

Other Operating Revenues

354,117

247,513

Deduction to Revenue

-686,663

-539,296

Net Operating Revenue

3,610,036

2,711,484

.

   

Operating Costs

   

Energy purchased for resale

-1,336,890

-406,444

Charges on electric grid usage

-53

-

Construction Cost

-389,912

-988,576

Fuel

-188,981

-140,420

Operating Expenses

   

Personnel, Material and Third-part related Service

-642,452

-661,366

Remuneration and Reimbursement

-7,197

-6,363

Depreciation and Amortization

-281,561

-154,067

Donations and Contributions

-

-

Provisions

693,633

-535,589

Others

-653,606

-670,192

Operating Costas and Expenses

-2,807,019

-3,563,017

.

   

Operating Result before Financial Result

803,017

-851,533

.

   

Financial Result

-1,218,441

-803,293

Result before Income tax and Social Contribution

-415,424

-1,654,826

.

   

Current Income Tax and Social Contribution

-

-

Deferred Income Tax and Social Contribution

-

-

Net Profit of Period

-415,424

-1,654,826

 

 

 

169


 
 

 

 

Cash Flow                                                                                         

(R$ thousands)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

-397,450

-1,464,211

Depreciation and amortization

270,537

154,067

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

-52,265

-1,308

Financing charges

578,003

475,046

Equity Method

-5,125

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-4,293

39,427

Provisions for contingencies

18,447

-22,407

Provision for staff realignment

0

-92,528

Provision for impairment of assets

-758,034

-167,653

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

891

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

-23,204

552,987

Variation in operating assets / liabilities

35,569

1,280,418

Net cash from operating activities

-337,815

754,729

 

   

Financing charges – payment

-173,409

-93,525

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

-16,434

Legal deposits

-20,626

-57,071

Net cash from Operational activities

-531,850

587,699

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

1,462,326

329,924

Loans and financing payable – principal

-544,828

-173,234

Payment of Shareholders remuneration

0

0

Loans and financing amortization – principal

0

0

Capital increase – receivable

0

0

Others

0

0

Net cash from financing activities

917,498

156,690

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-8,158

-47,636

Intangible acquisition

-12,128

-14,920

Acquisition ofConcession Asset

-387,276

-987,844

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

-10

Others

-136

0

Net Cash from investment activities

-407,698

-1,050,410

 

   

Increase (Decrease) in Cash and Cash Equivalents

-22,050

-306,021

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

84,656

390,677

Cash and cash equivalents at end of the period – 12/31/14

62,606

84,656

.

-22,050

-306,021

 

170


 
 

 

 

Analysis of the result

 

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 261.3% higher than that registered in the previous quarter, from a loss of R$ 290.8 million in 3Q14 to a profit of R$ 469.1 million in 4Q14, mainly due to the factors below described.

 

Operating Revenue

 

Emphasis on energy sales revenue in the spot market, from R$ 307.4 million in 3Q14 to R$ 633.9 million in 4Q14 mainly due to increase in the price of electric energy.

 

Operating Expenses

 

Electric energy purchased for resale increased by 77.5% from R$ 176.1 million in 3Q14 to R$ 312.7 million in 4Q14, mainly due to increased demand and energy prices.

 

Operational provisions increased by 609.8%, from a provision of R$ 65 million in 3Q14 to a reveral of R$ 331.3 million in 4Q14, mainly due to the reversal of a provision for impairment in the amount of R$ 300 million in 4Q14

 

Financial Result

 

The debt charges increased by 153.5%, from R$ 44.3 million in 3Q14 to R$ 112.3 million in 4Q14, mainly due to new contracts.

 

 

 

 

 

171


 
 

 

 

Market Data

 

1.Generation Assets and Energy generated

 

Own assets

 

Unit

Fuel

Installed Capacity

(MW)

Assured Energy

(Avg MW)

Generated Energy (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Parintins

Biodiesel BS1800

33.16

10.083

25,635

26,634

30,285

32,549

115,103

Itacoatiara

Biodiesel BS1800

34.83

6.328

22,865

24,636

29,572

33,769

81,300

Manacapuru

Biodiesel BS1800

28.93

10.868

-

-

-

-

0

Barreirinha

Biodiesel BS1800

3.71

0.729

2,935

3,043

3,483

3,645

9,626

Coari

Biodiesel BS1800

20.85

7.572

19,607

21,982

23,591

23,370

88,550

Maués

Biodiesel BS1800

12.43

3.822

9,597

10,180

11,304

11,890

42,971

Humaitá

Biodiesel BS1800

15.37

4.661

12,494

12,460

14,435

14,518

53,907

Urucará

Biodiesel BS1800

4.67

1.484

3,272

3,399

3,915

4,193

14,779

Benjamin Constant

Biodiesel BS1800

7.32

2.549

6,834

7,180

7,157

7,557

28,728

Tefé

Biodiesel BS1800

18.2

6.783

17,844

18,513

20,513

21,089

77,959

Manicoré

Biodiesel BS1800

7.67

2.489

6,139

6,989

7,489

7,604

28,221

Autazes

Biodiesel BS1800

6.07

1.753

5,907

5,734

6,137

6,282

24,060

Codajás

Biodiesel BS1800

7

1.653

2,886

4,580

4,952

5,064

17,482

Eirunepé

Biodiesel BS1800

10.62

1.996

4,876

5,456

5,456

5,952

21,740

Nova O. do Norte

Biodiesel BS1800

6.52

1.996

4,942

5,242

5,862

6,004

22,050

Atalaia do Norte

Biodiesel BS1800

1.19

0.05

-

-

-

-

-

Barcelos

Biodiesel BS1800

4.87

1.367

3,511

3,644

3,994

4,156

15,305

Lábrea

Biodiesel BS1800

9.54

2.611

7,470

7,740

8,084

8,698

31,992

São P. de Olivença

Biodiesel BS1800

3.79

0.986

2,510

2,650

2,732

2,963

10,855

Santo Antônio do Içá

Biodiesel BS1800

3.22

1.04

2,776

2,959

3,156

3,286

12,177

Carauari

Biodiesel BS1800

7.18

2.036

5,380

5,699

5,818

6,045

22,942

Fonte Boa

Biodiesel BS1800

6.23

1.662

3,781

3,684

4,044

4,571

16,080

Boca do Acre

Biodiesel BS1800

8.22

2.538

6,647

7,024

7,302

7,833

28,806

São G. da Cachoeira

Biodiesel BS1800

8.42

3.021

7,992

8,261

7,941

8,908

33,102

Itapiranga

Biodiesel BS1800

3.06

0.985

2,361

2,434

2,768

2,976

10,539

Anori

Biodiesel BS1800

4.16

1.073

1,215

2,892

3,375

3,454

10,936

Silves

Biodiesel BS1800

2.5

0.498

1,712

1,773

1,867

1,889

7,241

Augusto Montenegro

Biodiesel BS1800

0.6

0.055

175

181

182

248

786

Nhamundá

Biodiesel BS1800

4.58

0.961

2,562

2,783

3,360

3,544

12,249

Tabatinga

Biodiesel BS1800

15.43

5.336

12,973

14,030

14,497

15,225

56,725

172


 
 

 

 

 

Unit

Fuel

Installed Capacity

(MW)

Assured Energy

(Avg MW)

Generated Energy (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Novo Aripuanã

Biodiesel BS1800

5.69

1.584

3,972

4,052

4,645

4,897

17,566

Borba

Biodiesel BS1800

3.6

1.851

4,874

5,244

5,671

5,936

21,725

Santa I.do Rio Negro

Biodiesel BS1800

2.42

0.676

1,726

1,798

1,861

2,019

7,404

Jutaí

Biodiesel BS1800

6.18

1.182

2,794

2,839

3,259

3,371

12,263

Novo Airão

Biodiesel BS1800

5.27

1.206

3,441

3,735

4,037

3,994

15,207

Ipixuna

Biodiesel BS1800

3.04

0.597

1,499

1,690

1,774

1,920

6,883

Envira

Biodiesel BS1800

3.38

0.856

2,380

2,432

2,462

2,759

10,033

Cucuí

Biodiesel BS1800

0.57

0.073

200

243

219

252

914

Japurá

Biodiesel BS1800

0.18

0.044

137

141

161

172

611

Maraã

Biodiesel BS1800

3.69

0.628

1,805

2,100

2,258

2,365

8,528

Juruá

Biodiesel BS1800

2.49

0.462

1,335

1,546

1,594

1,657

6,132

Tapauá

Biodiesel BS1800

3.71

1.155

2,914

3,493

3,969

3,727

14,103

Canutama

Biodiesel BS1800

2.23

0.613

1,519

1,621

1,766

1,820

6,726

Pauini

Biodiesel BS1800

2.62

0.698

1,878

2,022

2,111

2,063

8,074

Careiro

Biodiesel BS1800

2.5

0.859

1,783

1,942

1,977

2,246

7,948

Amaturá

Biodiesel BS1800

1.8

0.446

1,189

1,323

1,407

1,475

5,394

Estirão do Equador

Biodiesel BS1800

0.72

45.207

108

142

138

145

533

Palmeiras

Biodiesel BS1800

0.72

0.053

92

99

107

111

409

Ipiranga

Biodiesel BS1800

0.42

0.054

118

134

114

133

499

Vila Bittencourt

Biodiesel BS1800

0.57

0.068

138

132

132

150

552

Iauaretê

Biodiesel BS1800

01

0.178

197

239

254

258

948

São S. do Uatumã

Biodiesel BS1800

2.64

0.638

1,526

1,536

1,714

1,855

6,631

Tonantins

Biodiesel BS1800

3.46

0.944

1,799

2,041

2,059

2,181

8,080

Alvarães

Biodiesel BS1800

2.72

0.641

1,950

2,138

2,165

2,260

8,513

Beruri

Biodiesel BS1800

2.97

0.756

2,171

2,510

2,660

3,034

10,375

Caapiranga

Biodiesel BS1800

2.06

0.493

2,637

2,001

2,191

1,964

8,793

Uarini

Biodiesel BS1800

1.94

0.615

1,885

2,073

2,091

2,116

8,165

Urucurituba

Biodiesel BS1800

2.84

0.787

2,755

2,835

3,035

2,992

11,617

Pedras

Biodiesel BS1800

0.57

0.102

291

321

332

379

1,323

Anamã

Biodiesel BS1800

1.73

0.54

785

1,826

1,935

2,196

6,742

Itamarati

Biodiesel BS1800

2.56

0.405

1,270

1,371

1,427

1,498

5,566

Castanho

Biodiesel BS1800

12.72

4.195

12,166

13,163

13,536

13,094

51,959

Rio Preto da Eva

Biodiesel BS1800

11.21

3.389

9,633

10,126

10,807

11,201

41,767

173


 
 

 

 

 

Unit

Fuel

Installed Capacity

(MW)

Assured Energy

(Avg MW)

Generated Energy (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Limoeiro

Biodiesel BS1800

1.79

0.335

1,005

1,009

1,062

1,200

4,276

Boa Vista do Ramos

Biodiesel BS1800

2.31

0.738

2,571

2,714

2,828

2,881

10,994

Manaquiri

Biodiesel BS1800

3.01

1.118

3,290

3,707

3,969

3,986

14,952

Caviana

Biodiesel BS1800

0.58

0.122

329

344

348

378

1,399

Campinas

Biodiesel BS1800

0.43

0.06

176

198

219

224

817

Caiambé

Biodiesel BS1800

0.88

0.121

386

399

388

418

1,591

Murituba

Biodiesel BS1800

0.3

0.033

73

78

77

86

314

Apuí

Biodiesel BS1800

7.19

1.381

3,521

4,097

4,341

4,486

16,445

Mocambo

Biodiesel BS1800

0.89

0.188

-

-

-

-

0

Belém do Solimões

Biodiesel BS1800

0.84

0.213

438

448

438

614

1,938

Itapeaçú

Biodiesel BS1800

0.85

0.153

-

-

-

-

0

Caborí

Biodiesel BS1800

0.78

0.095

755

828

910

945

3,438

Cametá

Biodiesel BS1800

0.612

0.136

-

-

-

-

0

Sacambú

Biodiesel BS1800

0.448

0.064

225

236

252

242

955

Novo Remanso

Biodiesel BS1800

4.06

1.331

4,455

4,849

4,839

5,225

19,368

Tuiué

Biodiesel BS1800

0.71

0.096

276

341

308

362

1,287

Jacaré

Biodiesel BS1800

0.34

0.164

569

589

769

639

2,566

Novo Céu

Biodiesel BS1800

01

0.404

1,740

1,740

1,740

1,912

7,132

Zé Açú

Biodiesel BS1800

   

-

-

-

-

0

Vila Amazônia

Biodiesel BS1800

2.08

0.341

1,285

1,227

1,455

1,582

5,549

Terra Nova

Biodiesel BS1800

   

-

-

-

-

0

Axinim

Biodiesel BS1800

0.66

0.107

307

333

302

373

1,315

Vila Urucurituba

Biodiesel BS1800

0.38

0.059

148

150

150

176

624

Arara

Biodiesel BS1800

0.332

0.052

142

159

159

178

638

Feijoal

Biodiesel BS1800

0.778

0.062

210

265

236

330

1,041

Lindoia

Biodiesel BS1800

01

0.304

888

1,035

1,070

966

3,959

Moura

Biodiesel BS1800

0.52

0.065

158

166

197

194

715

Santana

Biodiesel BS1800

0.31

0.051

116

139

152

147

554

Sucunduri

Biodiesel BS1800

0.16

0.048

128

159

189

156

632

Carvoeiro

Biodiesel BS1800

0.33

0.016

44

48

51

47

190

Itapuru

Biodiesel BS1800

0.31

0.02

67

83

91

119

360

Betânia

Biodiesel BS1800

0.43

0.111

264

235

270

282

1,051

Vila de Matupí

Biodiesel BS1800

1.85

0.619

1,907

1,993

2,295

2,475

8,670

Auxiliadora

Biodiesel BS1800

0.468

0.079

239

247

275

244

1,005

174


 
 

 

 

 

Unit

Fuel

Installed Capacity

(MW)

Assured Energy

(Avg MW)

Generated Energy (MWh)

1Q14

2Q14

3Q14

4Q14

2014

Tamaniquá

Biodiesel BS1800

0.468

0.079

65

65

63

65

258

Santa Rita Well

Biodiesel BS1800

0.62

0.183

512

510

469

537

2,028

Parauá

Biodiesel BS1800

0.568

0.096

224

245

242

205

916

Belo Monte

Biodiesel BS1800

0.246

0.044

114

117

124

148

503

Vila de Alterosa

Biodiesel BS1800

0.33

0.067

225

260

253

260

998

Camaruã

 

   

101

103

116

134

454

HPU Balbina

Water

277.5

132.3

283,428

251,959

437,394

341,407

1,314,189

TPU Aparecida

OCTE, GN

282.5

150.0

295,750

301,358

302,117

285,536

1,184,761

TPU Mauá

Block 1 - OC1A / Block 3 Natural Gas (Alternative OCTE) / Block4 – OPGE / Block 5 – Biodiesel / Block 6 – Biodiesel / Block 7 - Biodiesel

738.1

311.0

398,686

369,361

407,293

349,608

1,514,948

TPU Electron

OCTE

121.1

18.0

809

4,339

18,288

8,517

31,953

TPU CO Cidade Nova

Diesel/Biodiesel

29.6

19.4

13,839

20,285

17,521

23,714

75,359

TPU AS São José

Diesel/Biodiesel

73.4

47.5

40,054

45,019

34,389

38,327

157,790

TPU FO Flores

Diesel/Biodiesel

124.7

78.3

78,129

104,490

84,677

95,424

362,719

TPU Distrito

Biodiesel (B S1800)

51.3

38.3

36,129

45,778

31,119

36,260

149,286

TPU Iranduba

Diesel/Biodiesel

66.6

47.1

40,323

62,150

47,607

41,940

192,021

Total

 

2,204.22

1,012.0

1,493,966

1,528,095

1,729,862

1,293,683

5,256,778

 

175


 
 

 

 

Unit

Location

(State)

Beginning of Operation

End of Operation

Parintins

Amazonas

Dec/65

Undefined

Itacoatiara

Amazonas

Sep/66

Undefined

Manacapuru

Amazonas

Jan/67

Undefined

Barreirinha

Amazonas

Jun/67

Undefined

Coari

Amazonas

Sep/67

Undefined

Maués

Amazonas

Dec/67

Undefined

Humaitá

Amazonas

Jul/68

Undefined

Urucará

Amazonas

Jun/68

Undefined

Benjamin Constant

Amazonas

Aug/68

Undefined

Tefé

Amazonas

Aug/68

Undefined

Manicoré

Amazonas

May/69

Undefined

Autazes

Amazonas

Jun/69

Undefined

Codajás

Amazonas

Sep/69

Undefined

Eirunepé

Amazonas

Sep/69

Undefined

Nova Olinda do Norte

Amazonas

Oct/69

Undefined

Atalaia do Norte

Amazonas

Mar/70

Undefined

Barcelos

Amazonas

Jul/70

Undefined

Lábrea

Amazonas

Aug/70

Undefined

São Paulo de Olivença

Amazonas

Jan/71

Undefined

Santo Antônio do Içá

Amazonas

Jan/71

Undefined

Carauari

Amazonas

Jan/71

Undefined

Fonte Boa

Amazonas

Jan/71

Undefined

Boca do Acre

Amazonas

Feb/71

Undefined

São Gabriel da Cachoeira

Amazonas

Mar/71

Undefined

Itapiranga

Amazonas

Oct/71

Undefined

Anori

Amazonas

Oct/71

Undefined

Silves

Amazonas

Oct/71

Undefined

Augusto Montenegro

Amazonas

Oct/71

Undefined

Nhamundá

Amazonas

Nov/71

Undefined

Tabatinga

Amazonas

Nov/71

Undefined

Novo Aripuanã

Amazonas

Jun/72

Undefined

Borba

Amazonas

May/72

Undefined

Santa Isabel do Rio Negro

Amazonas

Oct/72

Undefined

Jutaí

Amazonas

May/72

Undefined

Novo Airão

Amazonas

Jul/73

Undefined

Ipixuna

Amazonas

Jul/73

Undefined

Envira

Amazonas

Aug/73

Undefined

Cucuí

Amazonas

Oct/73

Undefined

Japurá

Amazonas

Oct/73

Undefined

Maraã

Amazonas

Oct/73

Undefined

Juruá

Amazonas

Oct/73

Undefined

Tapauá

Amazonas

Dec/73

Undefined

Canutama

Amazonas

Dec/73

Undefined

Pauini

Amazonas

Sep/74

Undefined

Careiro

Amazonas

Sep/74

Undefined

Amaturá

Amazonas

Nov/74

Undefined

Estirão do Equador

Amazonas

Dec/74

Undefined

Palmeiras

Amazonas

Dec/74

Undefined

Ipiranga

Amazonas

Jan/75

Undefined

Vila Bittencourt

Amazonas

Dec/75

Undefined

Iauaretê

Amazonas

Apr/75

Undefined

São Sebastião do Uatumã

Amazonas

Apr/75

Undefined

Tonantins

Amazonas

Apr/75

Undefined

Alvarães

Amazonas

May/75

Undefined

Beruri

Amazonas

Dec/75

Undefined

Caapiranga

Amazonas

Jan/75

Undefined

Uarini

Amazonas

Feb/76

Undefined

Urucurituba

Amazonas

Jan/75

Undefined

Pedras

Amazonas

Aug/76

Undefined

Anamã

Amazonas

Jan/76

Undefined

Itamarati

Amazonas

Feb/76

Undefined

Castanho

Amazonas

Dec/79

Undefined

Rio Preto da Eva

Amazonas

Jun/04

Undefined

Limoeiro

Amazonas

Nov/82

Undefined

Boa Vista do Ramos

Amazonas

Mar/86

Undefined

Manaquiri

Amazonas

Jun/84

Undefined

Caviana

Amazonas

Jul/86

Undefined

Campinas

Amazonas

Jul/86

Undefined

Caiambé

Amazonas

Aug/76

Undefined

 

176


 
 

 

 

Unit

Location

(State)

Beginning of Operation

End of Operation

Murituba

Amazonas

Aug/86

Undefined

Apuí

Amazonas

Sep/86

Undefined

Mocambo

Amazonas

Mar/87

Undefined

Belém do Solimões

Amazonas

Mar/87

Undefined

Itapeaçú

Amazonas

Mar/87

Undefined

Caborí

Amazonas

Sep/92

Undefined

Cametá

Amazonas

Sep/92

Undefined

Sacambú

Amazonas

Dec/92

Undefined

Novo Remanso

Amazonas

Aug/98

Undefined

Tuiué

Amazonas

Sep/98

Undefined

Jacaré

Amazonas

Aug/98

Undefined

Novo Céu

Amazonas

Aug/98

Undefined

Zé Açú

Amazonas

Sep/98

Undefined

Vila Amazônia

Amazonas

Sep/98

Undefined

Axinim

Amazonas

Oct/98

Undefined

Vila Urucurituba

Amazonas

May/99

Undefined

Arara

Amazonas

Apr/00

Undefined

Feijoal

Amazonas

Feb/00

Undefined

Lindoia

Amazonas

Jul/00

Undefined

Moura

Amazonas

Apr/04

Undefined

Santana

Amazonas

Jul/05

Undefined

Sucunduri

Amazonas

Oct/06

Undefined

Carvoeiro

Amazonas

Mar/06

Undefined

Itapuru

Amazonas

Oct/10

Undefined

Betânia

Amazonas

Jul/06

Undefined

Vila de Matupí

Amazonas

Aug/06

Undefined

Auxiliadora

Amazonas

Oct/06

Undefined

Santa Rita Well

Amazonas

Nov/06

Undefined

Parauá

Amazonas

Sep/03

Undefined

Belo Monte

Amazonas

Oct/06

Undefined

Vila de Alterosa

Amazonas

Oct/06

Undefined

HPU Balbina

Amazonas

Jan/89

Mar/27

TPU Aparecida

Amazonas

Feb/84

Undefined

TPU Mauá

Amazonas

Apr/73

Undefined

TPU Electron

Amazonas

Jun/05

Undefined

UT CO Cidade Nova

Amazonas

Aug/08

Undefined

UT AS São José

Amazonas

Feb/08

Undefined

UT FO Flores

Amazonas

Aug/08

Undefined

TPU Distrito

Amazonas

Oct/10

Undefined

TPU Iranduba

Amazonas

Nov/10

Undefined

2. Electric energy purchased for resale

System

Unit

1Q14*

2Q14*

3Q14

4Q14

2014

Eletrobras (Guajará)

MWh

1,490

1,471

1,566

1,716

6,244

R$ million

3.1

-

-1.5

0.42

2.02

Others (PIE'S-Independent Producer.- Self producer)

MWh

673,823

690,572

687,838

669,200

2,689,096

R$ million

21.7

24.3

26.7

25.5

98.2

Total

MWh

675,313

692,043

689,404

670,916

2,695,340

R$ million

24.8

24.3

25.2

n/a

n/a

*Do ot consider the energy traded in the short term market.

177


 
 

 

 

3. Number of Consumer Units Serviced

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Residential

167.3

460,793

169.0

479,342

189.0

531,763

253.7

539,504

678.2

2,011,401

Industrial

100.4

443,444

97.5

427,642

142.7

463,765

156.1

451,658

418.9

1,786,509

Commercial

99.3

301,043

105.6

320,395

122.2

344,854

158.1

343,790

423.6

1,310,082

Rural

4.1

19,924

3.9

19,643

4.1

20,172

5.7

20,786

15.5

80,525

Public Utilities

39.3

132,084

42.4

149,118

46.9

167,182

64.4

163,791

169.4

612,175

Public Ilumination

13.6

32,905

10.2

43,908

10.3

44,603

12.0

44,681

31.4

166,097

Public Service

4.1

51,237

7.8

49,311

8.2

49,516

15.4

48,461

42.3

198,526

Own Consumption

3.8

6,913

3.5

6,132

2.7

6,440

633.9

6,317

1,769.7

25,801

CCEE Others

264.9

567,433

563.5

644,979

307.4

577,835

253.7

534,940

678.2

2,325,188

Total

697

2,015,776

1,003

2,140,470

834

2,206,130

1,299.3 

2,153,928

3,549.0 

8,516,304

 

4. Consumer units attended

 

1Q14

2Q14

3Q14

4Q14

2014

837,609

848,613

860,545

860,737

860,737

 

5. Expansion of Network – Number of new connections

 

1Q14

2Q14

3Q14

4Q14

2014

14,765

6,968

3,876

3,251

28,860

 

6. Substations

 

1Q14

2Q14

3Q14

4Q14

2014

54

54

54

55

54

 

7. Fuel used to produce electricity

 

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Diesel Oil

Litre

100,773,392

960.5

152,682,088

1,074.3

92,334,839.90

1,026.1

101,976,563

1,293.7

447,766,882.9

4,354.6

 

8. Losses  - %

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

2.44

35.42

1.5

37.08

1.00

39.20

0.97

38.91

1.44

38.87

 

9.Extension of transmission lines – 12.31.14

 

From - To

Extension

(Km)

Tension

(Kv)

Beginning of Operation

End of Concession

Balbina–Cristiano Rocha

158.513

230

Nov/06

Mar/27

Manaus–Cristiano Rocha

22.704

230

Nov/06

Mar/27

Ramal de Transmissão–Presidente Figueiredo

0.124

230

Sep/08

Mar/27

Balbina – Manaus I

180.344

230

Mayi/89

Mar/27

Balbina – Balbina – Circuit 1

0.590

230

Feb/89

Mar/27

Balbina – Balbina – Circuit 2

0.635

230

Apr/89

Mar/27

Balbina – Balbina – Circuit 3

0.635

230

Apr/89

Mar/27

Balbina – Balbina – Circuit 4

0.680

230

Sep/89

Mar/27

Balbina – Balbina – Circuit 5

0.680

230

Jul/89

Mar/27

Mauá Três – Jorge Teixeira

13,42

230

Set/14

Jul/15

 

178


 
 

 

 

Subtransmission

 

Line

Extension

(Km)

Tension

(kV)

Beginning of Operation

End of Concession

Manaus I – São José

7.285

69

Feb/01

Jul/15

Manaus I – Mauá

11.815

69

Oct/91

Jul/15

Manaus I – Distrito I – Circuit 1

4.685

69

Oct/91

Jul/15

Manaus I – Distrito I – Circuit 2

4.682

69

Nov/06

Jul/15

Manaus I – V8 – Circuit 1

1.160

69

Oct/91

Jul/15

Manaus I – V8 – Circuit 2

1.160

69

Oct/91

Jul/15

Manaus I – Cachoeirinha

6.112

69

Jul/92

Jul/15

Manaus I – Seringal Mirim – Circuit 1

6.649

69

Sep/97

Jul/15

Manaus I – Seringal Mirim – Circuit 2

7.277

69

Oct/97

Jul/15

Manaus I– Flores – Circuit 1

4.460

69

Feb/89

Jul/15

Manaus I – Flores – Circuit 2

4.565

69

Nov/01

Jul/15

Manaus I – Flores – Circuit 3

4.810

69

Dec/07

Jul/15

Manaus I – Cidade Nova

7.463

69

Jan/96

Jul/15

Manaus I – Santo Antônio

9.516

69

Apr/05

Jul/15

Flores – Redenção

1.469

69

Nov/08

Jul/15

Redenção – Ponta Negra

4.515

69

Nov/08

Jul/15

Flores – Ponta Negra

5.959

69

Dec/07

Jul/15

Aparecida – Ponta Negra

8.610

69

Jul/83

Jul/15

Aparecida – Seringal Mirim

3.796

69

Feb/97

Jul/15

Aparecida – Cachoeirinha

3.994

69

Apr/05

Jul/15

Aparecida – El Paso

0.153

69

Nov/99

Jul/15

Mauá – Distrito I – Circuit 1

7.481

69

Apr/77

Jul/15

Mauá – Distrito I – Circuit 2

6.728

69

Apr/99

Jul/15

Mauá – Distrito II – Circuit 1

4.122

69

Nov/97

Jul/15

Mauá – Distrito II – Circuit 2

4.107

69

Apr/04

Jul/15

Mauá – Marapatá

6.489

69

Nov/11

Jul/15

Marapatá – Cachoeirinha

2.894

69

Nov/11

Jul/15

Mauá – Cidade Nova

26.016

69

Aug/06

Jul/15

Mauá – Mauá Geração – Circuit 1

0.533

69

Feb/04

Jul/15

Mauá – Mauá Geração – Circuit 2

0.226

69

Feb/04

Jul/15

Mauá – El Paso

0.200

69

Mar/04

Jul/15

Mauá Geração – São José

8.924

69

Mar/04

Jul/15

Mauá Geração – Consumidores Especiais

9.362

69

Jul/04

Jul/15

Eletro – Cachoeirinha

0.357

69

Jan/81

Jul/15

Distrito I – Consumidores Especiais

7.723

69

Mar/96

Jul/15

Distrito II – Cachoeirinha – Circuit 1

7.421

69

Nov/97

Jul/15

Distrito II – Cachoeirinha – Circuit 2

7.830

69

Sep/11

Jul/15

Seringal Mirim – Cachoeirinha

3.980

69

Feb/97

Jul/15

Santo Antônio – Sivam

5.326

69

Mar/95

Jul/15

Ponta Do Ismael – Iranduba

18.043

69

Jun/06

Jul/15

Flores – Ambev

0.161

69

Mar/03

Jul/15

Iranduba – Manacapuru

70.000

69

Aug/12

Jul/15

Jorge Teixeira - Mutirão

7,1

138

Mai/14

Jul/15*

Mutirão – Cachoeira Grande

7,2

138

Mai/14

Jul/15*

Total

322.358

 

 

 

 

10. Extension of Distribution Lines - Km

 

1Q14

2Q14

3Q14

4Q14

44,420

44,462

45,492

44,519

 

11. DEC- Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

13.28

27.89

44.20

61.60

61.60

 

12. FEC – Frequency of interruptions – Number of outages

 

1Q14

2Q14

3Q14

4Q14

2014

8.72

19.13

29.39

39.84

39.84

179


 
 

 

 

 

13. TMA – Average response time – in minutes

 

1Q14

2Q14

3Q14

4Q14

2014

296.01

276.88

282.27

363.12

363.12

 

14. Average price – R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

277.64

278.10

278.32

276.68

277.69

 

15. Main investments – R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

Budget 2014

Distribution

68.64

73.71

62.86

95.61

300.80

357.27

Extension of Urban distribution

22.96

28.67

20.10

35.21

106.94

110.87

“Light for All” Program

24.94

29.18

25.92

44.93

124.97

130

Maintenance of the distribution system

9.67

6.85

8.90

5.77

31.19

55.92

Maintenance of the urban network

11.07

9.01

7.92

9.70

37.70

60.48

Others (infrastructure)

2.89

1.88

6.43

3.05

14.25

17.43

Generation

0.79

0.46

0.43

55.48

57.16

326.96

Transmission

 

 

 

40.43

40.43

47.75

Total

72.32

76.05

69.72

194.57

412.64

749.41

 

16. New Investments

 

16.1. Generation

 

16.1.1. Own assets

 

Unit

Location (State)

Investiment

(R$ million)

Installed Capacity (MW)

Assured Energy (MW Avg)

Beginning of Operation

Beginning of construction

Total

Up to 4Q14

Open cycle

Comb. cycle

Open cycle

Combined cycle

Open cycle

Combined cycle

TEU Mauá 3

AM

1,114.33

527.4

379,76

589,61

375,0

570,4

Sep/15

May/16

 

Sep/12

 

17. Loans and financing – R$ million

 

Creditor

Balance

03.31.14

Balance 06.30.14

Balance 09.30.14

Balance 12.31.14

Due Date

Index

Eletrobras

1,455.7

1,435.7

1,861.7

2,164.4

01.2014

RGR

 

18. Contract obligations – 12.31.14

 

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

Após 2020

646.9

237.9

305.7

253.2

203.4

189.5

327.8

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

Após 2020

R$ million

601.306

634.727

669.269

706.078

744.913

786.315

4,024.202

MWh

2,671,800

2,679,120

2,671,800

2,671,800

2,671,800

2,679,120

11,799,840

 

 

180

 
                                                                                                                 

 
 

 

 

19. Default

 

Class

R$ million

Public Utility Service

 

Industrial

21.05

Residential

83.34

Commercial

31.38

Rural

2.60

Public Entities

27.63

Public Ilumination

1.05

Public Service

20.84

Others

-

Total

187.88

 

19.Number of employees

 

18.1.By tenure

 

Generation and Transmission

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

76

47

21

21

6 to 10

298

257

283

283

11 to 15

80

71

56

56

16 to 20

124

186

197

189

21 to 25

114

116

119

129

beyond 25

208

229

231

232

Total

900

906

907

910

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

73

45

26

26

6 to 10

229

229

246

243

11 to 15

55

23

13

15

16 to 20

81

87

94

90

21 to 25

72

107

103

105

beyond 25

185

202

209

206

Total

695

693

691

685

 

Administration

 

Tenure (years)

1Q14

2Q14

3Q14

4Q14

Up to 5

56

110

60

62

6 to 10

204

239

279

276

11 to 15

41

6

3

3

16 to 20

52

36

34

31

21 to 25

64

37

40

35

Beyond 25

132

105

108

108

Total

549

533

524

515

 

18.2. By region

 

State

.

1Q14

2Q14

3Q14

4Q14

Amazonas

2,144

2,132

2,122

2,110

 

 

181


 
 

 

 

18.3. By departments

 

Department

 

1Q14

2Q14

3Q14

4Q14

Field

1,595

1,599

1,598

1,595

Administrative

549

533

524

515

 

21.Complementary work force

 

1Q14

2Q14

3Q14

4Q14

2014

1,740

1,740

1,740

1,740

1,740

 

22.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.37

0.61

0.19

0.26

0.26

 

 

182


 
 

 

 

Balance Sheet

(R$ thousands)

 

 

Asset

12.31.14

Current Assets

 

Availabilities

115,527

Clients (Consumers and Resellers)

659,119

Deferred Fiscal Assets (Taxes and Contributions)

5,292

Income Tax and Social contributions

-

Reimbursement rights – CCC (12,111 law)

95,161

Linked Deposits

89,405

Stored material

33,433

Financial Asset – Indemnitiable Concessions

114,325

Others

218,990

Current Total

1,331,252

   

Non-current Assets

 

Clients (Consumers and Resellers)

55,574

Deferred Fiscal Assets (Taxes and Contributions)

173,724

Marketable Securities

16,192

Reimbursement rights – CCC (12,111 law)

-

Linked Deposits

-

Financial Asset – Annual Allowed Revenue (Transmission)

1,991,973

Others

601,174

Advance to equity participation

-

 

2,838,637

INVESTMENT

-573

FIXED ASSET

150,344

INTANGIBLE

74,068

   

Non-Current Asset Total

3,062,476

Total Asset

4,393,728

 

183


 
 

 

 

Liabilities and Stockholders Equity

12.31.14

Current Liability

 

Suppliers

593,783

Loans and financings

302,885

Bonds

57,151

Taxes and social contributions

195,282

Income tax and Social Contribution

-

Reimbursement Obligations – CCC (12,111 law)

-

Advance to clients

-

Remuneration to shareholders (dividends to pay)

-

Estimated obligations

51,399

Provisions for Contingencies

-

Post-employment benefit (Complementary Pension Fund)

30,863

Leasing

-

Onerous Contracts

-

Sectorial Charges (regulatory taxes)

233,941

Incentive to personnel retiremnt

-

Others

299,245

Current Liability Total

1,764,549

   

Non-current Liability

 

Suppliers

874,025

Loans and financings

332,989

Bonds

228,195

Taxes and social contributions

30,486

Income tax and Social Contribution

37,487

Derivatives

-

Reimbursement Obligations – CCC (12,111 law)

-

Advance to clients

-

Estimated obligations

2,622

Provisions for Contingencies

595,445

Provision for onerous contract

-

Post-employment benefit (Complementary Pension Fund)

118,162

Sectorial Charges (regulatory taxes)

179,594

Advance for future capital increase

-

Others

16,495

Non-current Liability Total

2,415,500

   

Stockholders Equity

 

Social capital

3,475,679

Capital reserves

-

Profit Reserves

-

Additional Proposed Dividend

-

Accured losses/profit

-3,445,144

Other comprehensive Income

183,145

Non-controlling shareholders participation

-

   

Stockholders Equity Total

213,680

Liabilities and Stockholders’ Equity Total

4,393,728

 

 

184


 
 

 

 

Statement of Income

(R$ thousands)

 

 

 

09.30.2014 to 12.31.14

Operating Revenue

 

Electric Energy Supply - Distribution

1,634,246

Construction Revenue - Distribution

96,644

Other Operating Revenue

65,891

Deductions to Revenue

-537,630

Net Operating Revenue

1,259,151

Operating Costs

 

Electric Energy purchased for resale

-511,931

Construction Cost

-96,644

Operating Expenses

 

Personnel, Material and third-part related Service

-206,412

Charges on electric network usage

-39,232

Depreciation and Amortization

-28,537

Donations and Contributions

-

Provisions

-113,335

Others

-9,611

Operating Costs and Expenses

-1,005,702

Operating Result before Financial Result

253,449

Financial Result

-128,004

Result before Income tax and Social Contribution

125,445

Current Income tax and Social Contribution

-

Deferred Income tax and Social Contribution

-

Net Result of the period

125,445

 

185


 
 

 

 

Cash Flow

(R$ thousands)

 

Cash Flow

09.30.2014 to 12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

-397,450

-1,464,211

Depreciation and amortization

270,537

154,067

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

-52,265

-1,308

Financing charges

578,003

475,046

Equity Method

-5,125

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-4,293

39,427

Provisions for contingencies

18,447

-22,407

Provision for investment losses

0

-92,528

Provision for impairment of assets

-758,034

-167,653

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

891

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

-23,204

552,987

Variation in operating assets / liabilities

35,569

1,280,418

Net cash from operating activities

-337,815

754,729

 

   

Financing charges – payment

-173,409

-93,525

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

-16,434

Legal deposits

-20,626

-57,071

Net cash from Operational activities

-531,850

587,699

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

1,462,326

329,924

Loans and financing payable - principal

-544,828

-173,234

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

0

0

Others

0

0

Net cash from financing activities

917,498

156,690

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-8,158

-47,636

Intangible Asset acquisition

-12,128

-14,920

Concession Asset Acquisition

-387,276

-987,844

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

-10

Others

-136

0

Net Cash from investment activities

-407,698

-1,050,410

 

   

Increase (Decrease) in Cash and Cash Equivalents

-22,050

-306,021

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

84,656

390,677

Cash and cash equivalents at end of the period – 12/31/14

62,606

84,656

.

-22,050

-306,021

 

 

186


 
 

 

 

1.  Generation Assets and Energy generated – N/A

 

2.  Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

1,107,189

1,193,912

1,275,760

1,227,321

4,804,181

R$ million

154.209

168.342

185.298

183.872

691.721

Others (1)

MWh

2,103,150

2,205,169

2,340,527

2,281,621

8,930,467

R$ million

614.994

563.802

532.859

570.115

2,281.770

Total

MWh

3,210,338

3,399,081

3,616,287

3,508,942

13,734,649

R$ million

769.203

732.144

718.157

753.987

2,973.491

(1) Includes PROINFA and Short Term.

 

3. Energy Sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Residential

463,997

1,081,471

457,575

1,056,345

462,726

1,031,856

582,327

1,123,419

Industrial

201,49

565,026

210,759

593,194

222,603

626,906

274,84

620,502

Commercial

244,13

594,024

238,745

571,98

234,744

556,977

310,292

612,65

Rural

67,571

250,858

79,908

324,892

93,569

405,073

96,174

312,418

Public Utilities

39,879

105,451

40,673

106,732

38,779

100,1

54,824

119,445

Public Ilumination

21,804

91,839

43,68

181,05

36,397

144,562

44,053

149,7

Public Service

29,598

92,041

30,058

92,698

31,564

97,131

38,865

95,331

Own Consumption

688

1,374

400

1,299

530

1,276

711

1,493

Total

1,069,157

2,782,084

1,101,798

2,928,190

1,120,912

2,963,881

1,402,086

3,034,958

 

4.Number of Consumer Units Serviced

 

1Q14

2Q14

3Q14

4Q14

2,641,859

2,665,564

2,688,902

2,716,003

 

5. Network Expansion - number of new connections

 

1Q14

2Q14

3Q14

4Q14

26,994

25,436

22,165

26,857

 

6. Substations

 

1Q14

2Q14

3Q14

4Q14

320

316

319

337

 

7. Fuel used to produce electric energy – N/A

 

8. Losses - % 

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

9.72

2.18

9.95

2.44

9.89

6.33

9.77

3.93

9.83

3.44


9. Extension of Distribution Lines – Km

 

1Q14

2Q14

3Q14

4Q14

203,443

204,231

204,990

211,243

 

 

187


 
 

 

 

10. DEC – Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

13.25

6.71

8.06

12.38

40.40

 

11. FEC – Frequency of interruptions – Number of outages

 

1Q14

2Q14

3Q14

4Q14

2014

7.47

5.47

6.00

8.30

27.24

 

12. TMA – Average response time – in minutes

 

1Q14

2Q14

3Q14

4Q14

2014

359.64

237.06

267.21

360.78

317.26

 

13. Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

379.0

361.6

375.8

455.61

 

14. Main Investments – R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014 Total

2014 Budget

Distribution(Total)

43.4

43.4

61.8

112.3

260.9

456.8

AT and MT Enlargement

14.8

21.4

20.3

68.4

124.9

250.9

Enlargement and Improvments of Urbans Network

9.8

12.6

29.2

21.9

73.5

81.1

Electrification of Rural Properties

4.0

2.9

2.9

2.3

12.1

56.7

Maintenance and Improvement Program of System Facilities

4.6

3.3

2.9

3.2

14.0

29.1

Revenue Management

4.0

1.7

3.3

6.0

15.0

17.4

Corporate Investment

6.3

1.4

3.2

10.5

21.5

21.6

Total

43.4

43.4

61.8

112.3

260.9

456.8

 

15.New Investments – N/A

 

16. Loans and Financing – R$ million

 

Creditor

Balance on

03.31.14

Balance on

06.30.14

Balance on

09.30.14

Balance on

12.31.14

Due

Index

NATIONAL CURRENCY

 

 

 

 

   

Eletrobrás (ECF’s)

60.718

59.209

56.874

54.539

10/30/2018

2.32%p.y.

Banco Santander S/A

0

0

15.578

16.221

07/22/2016

4.78% p.y./CDI

Banco Bicbanco S/A

202.962

196.461

182.155

159.753

08/01/2016

5.32% p.y./CDI

Banco do Brasil S/A

7.432

6.119

4.814

3.503

08/17/2015

3.66% p.y./CDI

Banco Bracce S/A

4.743

3.244

3.087

2.904

12/28/2016

13.02%p.y./CDI

Banco Daycoval S/A

40.194

39.315

34.329

49.396

06/20/2016

6.04% p.y./CDI

Banco Intermedium S/A

0

10.273

10.277

9.599

04/10/2017

6.17% p.y./CDI

CELGPAR S/A

0

0

108.167

109.537

10/15/2027

6.8% p.y.

Banco Panamericano S/A

12.041

9.032

6.027

28.046

04/23/2015

4.99%p.y./CDI

Banco ABC Brasil S/A

128.632

128.613

95.177

61.732

06/09/2015

3.66% p.y./CDI

Banco de Créd e Varejo S/A

0

20.062

53.913

104.309

05/23/2017

5.54% p.y.CDI

FOREIGN CURRENCY

 

 

 

 

 

 

Credit National

2

0.4

0.4

0

12/31/2014

3.5% p.y./Euro

O.E.C.F. (e)

37.104

37.093

30.190

30.325

09/20/2016

3.94% p.y./Ien

 

 

188


 
 

 

 

17. Contracts Obligations – 12.31.14

 

Loans and Financing

(R$ million)

2015

2016

2017

2018

2019

2020

After 2020

Eletrobrás (ECF’s)

9.341

9.341

9.341

8.335

3.443

3.443

11.295

Banco Santander S/A

11.192

5.029

 

 

 

 

 

Banco Bicbanco S/A

125.170

34.583

 

 

 

 

 

Banco do Brasil S/A

3.503

 

 

 

 

 

 

Banco Bracce S/A

2.281

623

 

 

 

 

 

Banco Daycoval S/A

24.229

17.167

8.000

 

 

 

 

Banco Intermedium S/A

4.167

4.074

1.358

 

 

 

 

CELGPAR S/A

1.623

-

1.401

8.409

8.409

8.409

81.286

Banco Panamericano S/A

11.380

16.666

 

 

 

 

 

Banco ABC Brasil S/A

61.732

 

 

 

 

 

 

Banco de Créd e Varejo S/A

37.088

41.517

25.704

 

 

 

 

Credit National

0

 

 

 

 

 

 

O.E.C.F. (e)

15162

15163

 

 

 

 

 

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

1,665,395

1,762,801

1,696,143

1,784,729

1,800,162

1,805,094

1,800,162

MWh

13,658,754

14,464,709

14,274,414

14,980,879

15,197,853

14,466,220

15,197,853

 

18. Default – R$ million

 

Class

R$ million

Residential

67.4

Industrial

15.8

Commercial

24.9

Rural

11.1

Public Utilities

12.7

Public Ilumination

4.1

Public Service

13.3

Others

-

Total

149.3

 

19. Number of employees

 

 

19.1 By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

2

-

-

-

6 to 10

489

486

484

483

11 to 15

4

4

4

4

16 to20

376

376

376

377

21 to 25

6

-

-

-

beyond 25

312

317

314

314

Total

1,189

1,183

1,178

1,178

 

 

189


 
 

 

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

11

11

11

10

6 to 10

269

265

265

266

11 to 15

-

-

-

-

16 to20

17

17

17

16

21 to 25

5

-

-

-

beyond 25

224

230

228

227

Total

526

523

521

519

 

19.2.By region

 

State

 

1Q14

2Q14

3Q14

4Q14

Goiás

1,715

1,706

1,699

1,697

 

19.3.By departments

 

Department

 

1Q14

2Q14

3Q14

4Q14

Field

1,189

1,183

1,178

1,178

Administrative

526

523

521

519

 

20.   Complementary work force

 

Operational

1Q14

2Q14

3Q14

4Q14

4,184

4,184

4,184

4,967

 

21.   Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

293.43

23.24

23.35

14.65

 

 

190


 
 

 

 

Balance Sheet

(R$ thousands)

 

Asset

12.31.14

12.31.13

Current Assets

 

 

Availabilities

24,497

18,098

Clients (Consumers and Resellers)

65,336

43,433

Deferred Fiscal Assets (taxes and Contributions)

7,703

6,857

Income Tax and Social contributions

1,458

910

Reimbursement rights – CCC (12,111 law)

48,382

63,418

Linked Deposits

463

459

Stored material

1,441

2,124

Financial Asset – Indemnitiable Concessions

11,140

-

Others

52,358

22,059

Current Total

212,778

157,358

   

 

Non-current Assets

 

 

Clients (Consumers and Resellers)

20,699

13,128

Deferred Fiscal Assets (Taxes and Contributions)

2,719

3,754

Reimbursement rights – CCC (12,111 law)

237,664

138,178

Linked Deposits

5,311

4,946

Financial Asset – Annual allowed Revenue (Transmission)

314,203

266,652

Others

86

-

Advance to equity participation

-

-

 

580,682

426,658

INVESTMENT

0

0

FIXED ASSET

7,383

5,937

INTANGIBLE

36,343

48,418

   

 

Non-Current Asset Total

624,408

481,013

Total Asset

837,186

638,371

 

191


 
 

 

 

Liabilities and Stockholders Equity

12.31.14

12.31.13

Current Liability

 

 

Suppliers

91,825

69,602

Loans and financing

31,832

37,679

Bonds

-

-

Taxes and social contributions

17,486

14,368

Income tax and Social Contribution

303

-

Reimbursement Obligations – CCC (12,111 law)

-

-

Advance to clients

-

-

Remuneration to shareholders (dividends to pay)

-

-

Estimated obligations

2,866

4,626

Provisions for Contingencies

-

-

Post-employment benefit (Complementary Pension Fund)

866

-

Leasing

-

-

Onerous Contracts

-

-

Sectorial Charges (regulatory taxes)

31,297

29,920

Incentive to personnel retirement

-

-

Others

15,282

21,083

Current Liability Total

191,757

177,278

   

 

Non-current Liability

 

 

Suppliers

236,181

185,235

Loans and financings

201,731

118,627

Taxes and social contributions

5,398

4,971

Income tax and Social Contribution

-

-

Derivatives

-

-

Reimbursement Obligations – CCC (12,111 law)

124,079

118,474

Advance to clients

-

-

Estimated obligations

-

1,366

Provisions for Contingencies

8,926

4,548

Post-employment benefit (Complementary Pension Fund)

1,312

-

Sectorial Charges (regulatory taxes)

-

-

Advance for future capital increase

12,787

236,366

Incentive to personnel retiremnt

-

-

Others

109

1,058

Non-current Liability Total

590,523

670,645

   

 

Stockholders Equity

 

 

Social capital

475,789

245,158

Capital reserves

-

4,277

Profit Reserves

-

-

Additional Proposed Dividend

-

-

Accured losses/profit

-420,461

-458,987

Other comprehensive Income

- 422

-

Non-controlling shareholders participation

-

-

   

 

Stockholders Equity Total

54,906

-209,552

Liabilities and Stockholders’ Equity Total

837,186

638,371

 

 

192


 
 

 

 

Statement of Income

(R$ thousands)

 

 

12.31.14

12.31.13

Operating Revenue

   

Electric Energy Supply - Distribution

461,545

398,663

Construction Revenue - Distribution

46,926

55,301

Other Operating Revenue

4,622

15,023

Deductions of Revenue

-138,948

-126,159

Net Operating Revenue

374,145

342,828

Operating Costs

   

Electric Energy purchased for resale

-125,304

-148,687

Construction Cost

-46,926

-55,301

Operating Expenses

   

Personnel, Material and third-part related Service

-89,836

-108,008

Charges on electric network usage

-2,272

-2,254

Depreciation and Amortization

-14,262

-11,300

Donations and Contributions

-

-

Provisions

12,277

-102,735

Others

-14,166

-19,627

Operating Costs and Expenses

-280,489

-447,912

Operating Result before Financial Result

93,656

-105,084

Financial Result

-59,407

-46,727

Result before Income tax and Social Contribution

34,249

-151,811

Current Income tax and Social Contribution

-

-114

Deferred Income tax and Social Contribution

-

-302

Net Result of the period

34,249

-152,227

 

193


 
 

 

 

Cash Flow

(R$ thousands)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

25,930

-154,714

Depreciation and amortization

14,262

11,300

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

35,204

35,544

Financing charges

20,844

12,917

Equity Method

0

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-414

17,923

Provisions for contingencies

4,378

3,817

Provision for staff realignment

0

0

Provision for impairment of assets

-4,873

20,447

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

0

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

264

61,040

Variation in operating assets / liabilities

-94,953

25,897

Net cash from operating activities

642

34,171

 

   

Financing charges – payment

-20,844

-12,917

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

0

Legal deposits

0

0

Net cash from Operational activities

-20,202

21,254

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

184,727

44,196

Loans and financing payable - principal

-107,678

-40,213

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

0

0

Others

0

0

Net cash from financing activities

77,049

3,983

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-2,071

-1,213

Intangible Asset acquisition

-2,746

-7,298

Concession Asset Acquisition

-45,631

-50,766

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

0

Others

0

0

Net Cash from investment activities

-50,448

-59,277

 

   

Increase (Decrease) in Cash and Cash Equivalents

6,399

-34,040

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

18,098

52,138

Cash and cash equivalents at end of the period – 12/31/14

24,497

18,098

.

6,399

-34,040

 

 

194


 
 

 

 

Analysis of the result

 

4Q14 x 3Q14

 

 

The Company presented a net profit in 4Q14 36.3% lower than reported in the previous quarter, from R$ 7.0 million in 3Q14 to R$ 4.4 million in 4Q14, mainly due to the factors described below.

 

Operating Revenue

 

The net operating revenue increased by 7.5%, from R$ 96.7 million in 3Q14 to R$ 103.9 million in 4Q14, due to higher electricity consumption due to seasonality of the region.

 

Operating Expense

 

The personnel expenses, materials and third-part related service increased by 27.6%, from R$ 20.2 million in 3Q14 to R$ 26.6 million in 4Q14, mainly due to PID and higher levels of third-party services.

The operational provisions decreased by 2,560.3%, from a reversal of R$ 0.2 million in 3Q14 to a provision of R$ 5.1 million in 4Q14, mainly due to recognition of a provision relating to PCLD.

 

Financial Result

 

The net monetary variations increased by 78.5%, from an expense of R$ 14.3 million in 3Q14 to an expense of R$ 3.1 million in 4Q14, mainly due to the restatement of the CCC funding.

The others financial expenses decreased by 868.2%, from R$ 0.8 million in 3Q14 to R$ 8.0 million in 4Q14, mainly due to the payment of interest on overdue with Petrobras and fines.

 

195


 
 

 

 

Market Data

1.  Generation Assets and Energy generated – N/A

 

2.  Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras (SIN)*

MWh

53,182

55,043

58,760

51,213

218,198

R$ million

2.473

2.830

3.021

3.021

11.345

Eletrobras Eletronorte

MWh

124,665

129,028

137,741

127,930

519,364

R$ million

18.994

21.766

23.236

21.581

85.577

Others

MWh

84,534

87,493

93,402

81,405

346,834

R$ million

15.047

17.218

18.381

16.020

66.666

Total

MWh

262.381

271.564

289.903

260.548

1,084.396

R$ million

36,515

41,814

44,638

40,622

163,589

*SIN – Interconnected National System

 

3.  Energy sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$

million

MWh

R$

million

MWh

Residential

58.5

99,878

54.9

97,433

56.9

98,764

57.8

104,166

228.1

400,241

Industrial

4.3

9,334

4.3

8,783

4.3

9,441

4.3

9,347

17.2

36,906

Commercial

27.7

49,265

26.4

47,153

28.0

49,523

30.0

52,557

112.1

198,497

Rural

3.9

9,97

3.6

10,592

4.2

10,363

4.4

10,596

16.1

41,521

Public Utility

13.9

27,52

14.8

28,481

15.6

30,045

15.9

31,232

60.2

117,278

Public Ilumination

2.4

8,692

2.3

11,599

2.4

10,916

2.3

14,888

9.4

46,095

Public Service

3.2

8,597

4.0

8,254

3.6

8,572

4.6

8,324

15.4

33,747

Own Consumption

0.1

302

0.2

290

0.2

294

0.4

300

0.9

1,186

Total

114.0

213,559

110.6

212,585

115.1

217,917

119.7

231,409

459.4

875,47

 

4.  Number of Consumer Units Serviced

 

1Q14

2Q14

3Q14

4Q14

2014

234,677

237,728

239,653

240,039

240,039

 

5.  Network Expansion - number of new connections

 

1Q14

2Q14

3Q14

4Q14

2014

2,965

2,885

1,893

2,874

10,617

 

6.  Quantity of Substations

 

1Q14

2Q14

3Q14

4Q14

2014

15

15

15

15

13

 

7.  Fuel for production of electric energy

 

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Diesel

Litre

12,836,029

40.01

13,334,861

41.32

13,929,975

42.58

14,751,716

47.97

54,862,581

172.15

Total

12,836,029

40.01

13,334,861

41.32

13,929,975

42.58

14,751,716

47.97

54,862,581

172.15

 

 

196


 
 

 

 

8.      Losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

9.85

13.65

9.85

13.05

9.85

13.54

9.85

13.8

9.85

13.8

 

9.      Extension of distribution line – 12.31.14 - Km

 

1Q14

2Q14

3Q14

4Q14

2014

19,017

19,248

19,297

19,052

19,052

 

10.   DEC - Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

24.61

38.43

49.87

63.87

63.87

 

11.   FEC – Frequency of interruptions – Number of outages

 

1Q14

2Q14

3Q14

4Q14

2014

11.30

20.58

30.19

40.85

40.85

 

12.   TMA – Average response time – in minutes

 

1Q14

2Q14

3Q14

4Q14

2014

671.26

561.47

496.35

486.99

486.99

 

13.   Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

516.35

500.27

532.40

505.59

513.69

 

14.   Main investments – R$ thousand 

 

Project

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Distribution

10.532

7.460

15.181

14.137

47.310

65.142

Enlargement RD Rural Distribution light for all

1.288

1.105

2.096

2.521

7.010

7.134

Enlargement RD Urban Distribution

3.932

3.376

3.233

2.592

13.133

13.076

Maintanence of Distribution System

3.515

901

3.229

4.786

12.431

37.474

Energy on Isolated Systems

-

-

-

-

-

-

Modernization and Adequacy of Commercial and Distribution System

1.797

2.078

6.623

4.238

14.736

7.458

Others

200

894

488

726

2.308

4.707

Asset maintenance

200

894

488

726

2.308

4.707

Total

10.732

8.354

15.669

14.863

49.618

69.849

 

197

 
                                                                                                                 

 
 

 

 

15.   New Investments - N/A

 

16.   Loans and financing – R$  

 

Credor

Saldo em 31.03.2014

Saldo em

30.06.14

Saldo em

30.09.14

Saldo em

31.12.14

Vencimento

Indexadores

Eletrobras

675,293.51

675,293.51

675,293.51

-

2015

R$

Eletrobras

15,257,000.00

15,257,000.00

52,000,000.00

52,000,000

2019

R$

Eletrobras

-

2,358,149.00

15,257,000.00

-

2018

R$

Eletrobras

15,778,049.00

15,778,049.00

15,778,049.00

-

2019

R$

Eletrobras

1,189,122.20

1,168,620.09

1,168,620.09

1,206,679

2018

R$

Eletrobras

490,000.00

490,000.00

508,887.02

1,309,373

2019

R$

Eletrobras

35,551,615.70

34,184,245.87

34,184,245.87

33,289,021

2018

R$

Eletrobras

11,733,463.40

10,951,232.50

10,951,232.50

9,095,623

2019

R$

Eletrobras

8,662,861.80

8,408,071.75

8,408,071.75

-

2017

R$

Eletrobras

9,321,670.93

9,047,504.14

9,047,504.14

8,271,178

2017

R$

Eletrobras

12,675,829.62

11,830,774.30

11,196,982.81

10,563,191

2019

RGR

Eletrobras

11,500,000.00

11,250,000.00

11,250,000.00

11,469,057

2018

R$

Eletrobras

12,055,255.32

12,235,567.01

13,050,097.10

17,242,299

2019

IPCA

Eletrobras

7,666,666.62

7,499,999.95

7,499,999.95

7,668,308

2018

R$

Eletrobras

3,710,020.70

3,400,852.30

3,168,976.00

2,937,100

2018

RGR

Eletrobras

10,703,878.08

9,730,798.26

9,000,988.38

8,452,730

2017

RGR

Eletrobras

3,782,090.53

3,438,264.16

3,180,394.36

2,836,634

2017

R$

Eletrobras

1,708,887.78

1,025,332.66

512,666.32

524,069

2014

R$

Eletrobras

-

-

-

62,744,590

2015

R$

Eletrobras

373,264.48

-

-

-

2014

R$

Eletrobras

2,036,802.71

1,745,830.87

-

-

2016

R$

Eletrobras

3,382,140.66

3,163,938.03

1,527,601.99

1,030,863

2018

R$

Eletrobras

53,844.91

16,153.48

3,000,286.08

2,922,525

2014

R$

Total

168,307,757.95

163,655,676.88

211,366,897.39

233,563,240

 

 

 

17.   Contract obligations

 

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

After 2020

10.611

3.447

19.560

46.990

69.242

20.968

62.745

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

 

 

 

 

 

 

 

MWh

 

 

 

 

 

 

 

 

18. Default

 

Class

R$ million

State utilities

-

Industrial

2.5

Residential

21.9

Commercial

11.9

Rural

3.2

Public Utility

16.1

Public Ilumination

8.4

Public Service

0.6

Others

-

Total

64.6

 

 

198


 
 

 

19. Number of employees

 

 

19.1 By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

75

75

74

74

6 to 10

39

39

39

39

11 to 15

-

-

-

-

16 to20

-

-

-

-

21 to 25

17

17

17

-

beyond 25

43

43

43

56

Total

174

174

173

169

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

46

46

45

43

6 to 10

23

23

22

18

11 to 15

-

-

-

6

16 to20

-

-

-

-

21 to 25

9

9

9

-

beyond 25

22

22

21

27

Total

100

100

97

96

 

19.2.By region

 

State

 

1Q14

2Q14

3Q14

4Q14

Acre

274

274

270

263

 

19.3.By departments

 

Departments

 

1Q14

2Q14

3Q14

4Q14

Field

101

101

97

100

Administrative

173

173

173

163

 

22.   Complementary work force

 

Operational

1Q14

2Q14

3Q14

4Q14

49

49

49

49

 

23.   Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

2.18

2.18

0.36

0.083

4.80

 

199


 
 

 

Balance Sheet

(R$ thousands)

 

Assets

12.31.14

12.31.13

Current Assets

 

 

Availabilities

16,426

25,646

Clients (Consumers and Resellers)

279,559

231,241

Marketable Securities

-

-

Fiscal Asset Deferred (taxes and Contributions)

8,466

10,762

Reimbursement Right – CCC (12,111 law)

17,610

-

Linked Deposits

-

-

Stored Materials

5,545

5,040

Financial Asset – Indemnitiable Concessions

67,300

-

Other

77,580

49,946

Current Assets Total

472,486

322,635

 

 

 

Non-Current Assets

 

 

Clients (Consumers and Resellers)

197,314

171,341

Fiscal Asset Deferred (taxes and Contributions)

5,997

5,968

Reimbursement Right – CCC (12,111 law)

-

-

Linked Deposits

39,600

40,852

Financial Asset

781,469

587,852

Other

564

3,948

Advance for equity participation

-

-

 

1,024,944

809,961

INVESTMENT

168

168

FIXED ASSET

23,698

24,088

INTANGIBLE

13,635

43,809

Non-Current Assets Total

1,062,445

878,026

Assets Total

1,534,931

1,200,661

 

200


 
 

 

Liabilities and Stockholders’ Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

175,962

141,121

Loans and financing

233,681

227,310

Taxes and social contributions

81,890

43,970

Income tax and Social Contribution

995

828

Derivatives

-

-

Reimbursement obligations – CCC (12,111 law)

-

-

Advance from clients

-

-

Remuneration to Shareholders (dividends to pay)

-

-

Estimated obligations

7,808

13,650

Provisions for Contingencies

-

-

Post-employment benefits (Complementary Pension Fund)

11,931

14,081

Leasing

-

-

Onerous Contracts

-

-

Concessions to pay - UBP

-

-

Sectorial charges (regulatory taxes)

431

497

Incentive to personnel retirement

-

-

Others

107,629

100,538

Current Total

620,327

541,995

 

 

 

Non-Current Liabilities

 

 

Suppliers

-

6,427

Loans and financing - Principal

718,482

387,582

Taxes and social contributions

-

9,130

Income tax and Social Contribution

-

-

Derivatives

-

-

Reimbursement obligations – CCC (12,111 law)

-

-

Advance from clients

-

-

Estimated Obligations

5,599

6,988

Provisions for Contingencies

88,711

83,473

Provisions for onerous contracts

-

-

Post-employment benefits (Complementary Pension Fund)

46,993

161,099

Sector charges (regulatory taxes)

-

-

Advance for future capital Increase

8,307

7,698

Incentive to personnel retirement

-

-

Others

57,587

17,669

Non-Current Total

925,679

680,066

 

 

 

Stockholders’ Equity

 

 

Social Capital

726,447

726,447

Capital Reserve

-

-

Profit Reserve

-

-

Additional Proposed Dividend

-

-

Accured losses/profit

-678,710

-583,356

Other comprhensive results

-58,812

-164,491

Non-controlling shareholders participation

-

-

 

 

 

Stockholders’ Equity Total

-11,075

-21,400

Total Liabilities and Stockholders’ Equity

1,534,931

1,200,661

201


 
 

 
 

Statement of Income

(R$ thousands)


 

 

12.31.14

12.31.13

Operating Revenue

 

 

Electric Energy Supply - Distribution

1,554,489

1,080,289

Construction Revenue - Distribution

93,192

104,440

Other Operating Revenue

74,318

71,498

Deductions of Revenue

-379,866

-334,771

Net Operating Revenue

1,342,133

921,456

 

 

 

Operational Costs and Expenses

 

 

Electric Energy purchased for resale

-831,566

-504,780

Construction Cost

-93,192

-104,440

Charges on electric network usage

-57,758

-21,464

 

 

 

Operating Expenses

 

 

Personnel, Material and third-part related service

-227,448

-316,836

Depreciation and Amortization

-32,215

-26,359

Donations and Contributions

-142

-147

Provisions

-25,806

72,776

Others

-95,215

-203,681

Operating Costs and Expenses

-1,363,342

-1,104,931

 

 

 

Result before Financial Result

-21,209

-183,475

 

 

 

Financial Result

-81,363

-25,730

Result before Income tax and Social Contribution

-102,572

-209,205

 

 

 

Current Income tax and social Contribution

7,218

-

Deferred Income tax and Social Contribution

-

-

Net Result of the Period

-95,354

-209,205

 

202


 
 

 
 

Cash Flow

(thousands reais)

 

 

Cash Flow

12.31.2014

12.31.2013

OPERATING ACTIVITIES

   

Result before income tax and social contribution

-102,572

-137,149

Depreciation and amortization

32,215

26,359

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

-15,417

-118

Financing charges

81,514

43,933

Equity Method

0

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-19,701

-44,867

Provisions for contingencies

5,238

-7,682

Provision for staff realignment

0

74,532

Provision for impairment of assets

13,960

0

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

-48

48

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

21,731

324,987

Variation in operating assets / liabilities

-231,989

-394,913

Net cash from operating activities

-215,069

-114,870

 

   

Financing charges – payment

0

0

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

0

Legal deposits

0

0

Net cash from Operational activities

-215,069

-114,870

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

673,799

270,359

Loans and financing payable - principal

-368,767

-92,021

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

-8,499

-3,117

Capital increase - receivable

0

21,918

Others

0

0

Net cash from financing activities

296,533

197,139

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-3,578

-2,300

Intangible acquisition

-13,122

-6,651

Intangible acquisition - Concession

-80,070

-97,790

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

0

Others

-721

4,112

Net Cash from investment activities

-97,491

-102,629

 

   

Increase (Decrease) in Cash and Cash Equivalents

-16,027

-20,360

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

25,646

46,006

Cash and cash equivalents at end of the period – 12/31/14

9,619

25,646

 

-16,027

-20,360

 

203


 
 

 
 

Analysis of the result

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 796.4% higher than the registered in the previous quarter, from a loss of R$ 13.2 million in 3Q14 to a R$ 91.6 million profit in 4Q14, mainly due to the factors described below.

 

Operating Revenue

 

The net operating revenue of the company increased by 1,437.9%, from R$ 8.7 million in 3Q14 to R$ 134.1 million in 4Q14, mainly due to the the recognition of regulatory assets (CVA) according to OCPC 08.

 

Operating Expenses

 

The expenses with personnel, materials and third-part related services increased by 8.2%, from R$ 59.3 million in 3Q14 to R$ 64.2 million in 4Q14, mainly due to increased spending on services aimed at improving the service to the final consumer, as well as increasing the number of consumers served.

 

The electric energy purchased for resale increased by 113.9% from R$ 133.4 million in 3Q14 to R$ 285.5 million in 4Q14, mainly due to the increase in energy prices as a result of higher thermal dispatch, due to the low level of the hydroelectric reservoirs.

 

The operational provisions increased by 256.3%, from R$ 5.3 million in 3Q14 to R$ 18.7 million in 4Q14, mainly due to the lawsuit filed by CODEVASF for the CEAL and Energipe dealers not did supply cuts of electricity. According to judicial decision, utilities companies could deduct the appropriate amount of bills for the payment of the amounts of energy acquired from CHESF.

 

Financial Result

 

The net monetary update increased by 128%, from an expense of R$ 14.8 million in 3Q14 to a R$ 33.7 million in 4Q14, mainly due to the installment of overdue customer accounts in period.

 

The debt charges increased by 131.1%, from R$ 16.7 million in  3Q14 to R$ 5.2 million in 4Q14, mainly due to the renegotiation of contracts regular resources during this period.

 

The other revenues net financial expenses decreased by 1,275%, from an expense of R$ 1.7 million in 3Q14, to an expense of R$ 23.8 million in 4Q14, mainly due to the register of the monetary correction and interest action CEAL X Codevasf X CHESF, mentioned above.

 

 

 

 

 

 

204


 
 

 

 

Market Data

1. Generation Assets and Energy generated – N/A

 

2. Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

646,010

706,706

684,132

722,903

2,759,751

R$ million

37.4

48.3

25.2

86.7

197.6

Others

MWh

575,101

471,137

456,088

481,936

1,984,262

R$ million

138.1

189.9

107.2

198.8

634.0

Total

MWh

1,221,111

1,177,843

1,140,220

1,204,839

4,744,013

R$ million

175.5

238.2

132.4

285.5

831.6

 

3. Energy sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Residential

139.3

336,993

132.7

327,07

131.4

309,316

175.3

331,554

578.5

1,304,933

Industrial

32.5

138,543

33.6

144,391

38.9

150,366

48.8

145,97

153.7

579,27

Commercial

80.3

186,942

74.9

183,182

74.9

170,974

101.2

190,884

331.3

731,982

Rural

13.4

78,047

6.5

25,983

5.3

16,727

14.5

58,162

39.7

178,919

Public Utility

18.9

37,446

16.1

37,93

18.8

35,372

25.7

39,818

79.5

150,566

Public Ilumination

11.9

49,819

11.1

50,794

11.2

50,745

15.0

51,224

49.3

202,582

Public Service

9.5

45,918

10.2

44,544

11.4

46,366

13.1

46,736

44.1

183,564

Own Consumption

0.3

949

0.3

1,074

0.2

781

0.4

920

1.2

3,724

Total

306.0

874,657

285.3

814,968

292.1

780,647

394.0

865,268

1.277,4

3,335,540

 

4. Number of Consumer Units Serviced

 

1Q14

2Q14

3Q14

4Q14

2014

991,742

998,785

1,008,010

1,013,971

1,013,971

 

5. Network Expansion - number of new connections

 

1Q14

2Q14

3Q14

4Q14

2014

10,416

6,925

9,348

5,956

32.645

 

6. Substations

 

1Q14

2Q14

3Q14

4Q14

2014

40

40

41

40

40

 

7. Fuel used to produce electricity- N/A

 

8. Losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

10.34

15.13

10.34

14.84

10.34

14.83

10.34

14.44

10.34

14.47

 

 

205

 
                                                                                                                 

 
 

 

 

 

9. Extension of distribution lines – Km

 

2014

41,734

 

10. DEC- Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

10.29

20.87

27.93

36.50

36.50

 

11. FEC – Frequency of interruptions – Number of outages

 

1Q14

2Q14

3Q14

4Q14

2014

6.20

11.69

16.30

22.77

22.77

 

12. TMA – Average response time – in minutes

 

1Q14

2Q14

3Q14

4Q14

2014

296.17

346.73

313.51

304.45

304.45

 

13. Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

250.68

257.92

280.65

336.76

281.79

 

14. Main Investments – R$ million

 

Projectt

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Distribution

16.0

17.1

16.2

40.4

89.5

94.4

Rural Distribution Network Expansion - Light for All

1.2

0.2

0.1

0.1

1.6

2.5

Expansion of Distribution System

4.4

4.2

2.4

-

11.1

14.0

Maintenance of Distribution System

5.0

4.1

3.0

11.7

23.6

24.2

Modernization and Adequacy of Commercial and Distribution System – loss reduction

5.4

8.6

10.5

28.5

53.2

53.7

Others

1.1

0.7

0.5

2.9

5.2

17.0

Maintenance and Adequacy of Goods

-

0.1

0.1

0.5

0.6

2.3

Maintenance and Adequacy of movable property, vehicles, and equipment

-

0.1

-

-

0.2

0.5

Maintenance and Adequacy of computer, information assets and teleprocessing

1.1

0.5

0.4

2.4

4.4

14.2

Total

17.1

17.8

16.4

43.3

94.7

111.4

 

15. New Investments – N/A

 

16. Loans and Financing – R$ million

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due Date

Index

Eletrobras

654

731

761

941

Diverses

Interest Rate

Faceal

13

11

09

6

07.30.2015

INPC

Caixa Econômica Federal

05

05

05

5

12.31.2014

CDI/OVER

Banco do Brasil

05

05

05

5

12.31.2014

CDI/OVER

Lloyds Bank

01

01

01

1

04.10.2024

DOLLAR

 

 

206


 
 
 
17. Contract obligations – 12.31.13

 

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

After 2020

240

123

138

124

92

84

157

 

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

588.4

704.2

755.0

858.8

934.5

934.5

934.5

MWh

5,049,171

5,701,359

5,766,445

6,187,647

6,352,154

6,352,154

6,352,154

 

18. Default

 

Class

R$ thousand

Residential

15.0

Industrial

6.6

Commercial

6.9

Rural

4.6

State Utilities

2.3

Public Ilumination

2.9

Public Service

14.8

Others

0.2

Total

53.3

 

19. Number of employees

 

19.1. By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

391

389

330

303

6 to 10

175

174

217

236

11 to 15

-

-

-

-

16 to20

-

-

-

-

21 to 25

100

100

91

92

beyond 25

227

227

232

221

Total

893

890

870

852

 

Administration 

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

52

52

63

54

6 to 10

47

47

48

51

11 to 15

-

-

-

-

16 to20

-

-

-

-

21 to 25

12

12

10

10

beyond 25

50

50

52

49

Total

161

161

173

164

 

19.2.By region

 

State

 

1Q14

2Q14

3Q14

4Q14

Alagoas

1,054

1,051

1,043

1,016

 

 

207


 
 

 

 

19.3.By departments

 

Departments

 

1Q14

2Q14

3Q14

4Q14

Field

890

890

870

852

Administrative

168

161

173

164

 

20.Complementary work force

 

1Q14

2Q14

3Q14

4Q14

1,014

1,178

1,178

1,031

 

21.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.19

0.14

0.14

2.16

3.26

 

 

 

208


 
 

 

 

Balance Sheet

(R$ thousands)

 

 

Assets

12.31.14

12.31.13

Current Assets

 

 

 

 

 

Availabilities

5,478

22,450

Clients (Consumers and Resellers)

284,504

204,164

Marketable Securities

20,960

-

Fiscal Asset Deferred (taxes and Contributions)

23,355

8,237

Income tax and Social Contribution

5,893

11,492

Reimbursement Rights – CCC (12,111 law)

50,800

9,812

Linked Deposits

-

-

Stored Material

6,130

11,746

Financial Asset – Indemnitiable Concessions

193,808

-

Others

49,301

34,334

Current Asset Total

640,229

302,235

 

 

 

Non-Current Assets

 

 

 

 

 

Clients (Consumers and Resellers)

219,303

167,352

Fiscal Asset Deferred (taxes and Contributions)

4,521

4,594

Reimbursement Rights – CCC (12,111 Law)

-

-

Linked Deposits

12,618

16,267

Financial Asset – Annual allowed revenue (transmission)

651,978

596,843

Others

1,313

1,323

Advance for equity participation

-

-

 

889,733

786,379

Investments

146

146

Fixed Asset

20,531

29,162

Intangible

28,928

13,519

 

 

 

Non-Current Assets Total

939,338

829,206

Total Assets

1,579,567

1,131,441

 

 

 

 

 

 

 

 

209


 
 

 

 

Liabilities and Stockholders Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

165,288

117,411

Loans and Financing

330,198

191,497

Taxes and Social Contribution

143,162

58,670

Income tax and Social Contribution

-

4,991

Reimbursement Obligations – CCC (12,111 law)

-

-

Clients Advance

-

-

Remuneration to Shareholders (dividends to pay)

-

-

Estimated Obligations

37,050

34,277

Provisions for Contingencies

-

-

Post-Employment Benefit (Complementary Pension Fund)

22,974

19,264

Onerous Contract

-

-

Sectorial Charges (regulatory taxes)

13,837

19,065

Incentive to personnel retirement

-

-

Others

46,584

33,130

Current Liabilities Total

759,093

478,305

 

 

 

Non-Current Liabilities

 

 

Suppliers

-

-

Loans and Financing

728,363

603,079

Taxes and Social Contribution

37,866

49,704

Income tax and Social Contribution

-

5,411

Reimbursement Obligations – CCC (12,111 law)

-

-

Advance of clients

-

-

Estimated Obligations

-

2,363

Provision for contingencies

101,574

71,928

Provision for uncovered liabilities on invested companies

-

-

Post-Employment Benefit (Complementary Pension Fund)

32,638

86,031

Leasing

-

-

Sectorial Charges

44,049

32,510

Advance for future capital increase

16,416

15,631

Incentive to personnel retirement

-

-

Others

626

5,956

Non-Current Liabilities Total

961,532

872,613

 

 

 

 

 

 

Stockholders Equity

 

 

Social Capital

1,256,331

1,256,331

Capital Reserves

-

-

Profit Reserves

-

-

Additional proposed Dividend

-

-

Acccumulated Profit/Losses

-1,403,544

-1,441,479

Other comprehensive income

6,155

-34,329

Non-controlling shareholders participation

-

-

Stockholders Equity Total

-141,058

-219,477

 

 

 

Total Liabilities and Stockholders Equity

1,579,567

1,131,441

 

 

 

 

210


 
 

 

 

Statement of Income

(R$ thousands)

 

 

12.31.14

12.31.13

Operating Revenue

 

 

Electric Energy Supply - Distribution

1,438,094

1,052,159

Construction Revenue - Distribution

126,130

196,591

Other Operating Revenue

140,162

148,684

Deductions of Revenue

-412,809

-378,523

Net Operating Revenue

1,291,577

1,018,911

 

 

 

Operational Costs

 

 

Charges on electric energy network usage

-71,823

-15,492

Construction Cost

-126,130

-196,591

Operating Expenses

 

 

Personnel, Material and third-part related service

-273,045

-355,304

Electric Energy purchased for resale

-529,720

-446,348

Depreciation and Amortization

-31,337

-28,876

Donations and Contributions

-

-

Provisions

7,608

-264,196

Others

-97,012

-84,684

Operating Costs and Expenses

-1,121,459

-1,391,491

 

 

 

Operating Result before Financial Result

170,118

-372,580

 

 

 

Financial Result

-169,289

-69,728

Result before Income tax and Social Contribution

829

-442,308

 

 

 

Current Income tax and social Contribution

-

-

Deferred Income tax and Social Contribution

-

-

Fiscal Incentives Revenue

37,106

-

Net Result of the Period

37,935

-442,308

 

211


 

 

 

 
Cash Flow

(reais thousands)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

829

-427,871

Depreciation and amortization

31,337

28,876

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

2,863

1,338

Financing charges

67,195

48,532

Equity Method

0

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-73,110

6,719

Provisions for contingencies

54,935

19,704

Provision for staff realignment

0

0

Provision for impairment of assets

10,567

221,875

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

0

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

22,313

15,990

Variation in operating assets / liabilities

-209,473

-24,294

Net cash from operating activities

-92,544

-109,131

 

   

Financing charges – payment

0

0

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

37,106

0

Complementary pension fund payment

0

0

Lawsuits payment

-25,289

-10,797

Legal deposits

0

0

Net cash from Operational activities

-80,727

-119,928

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

607,414

280,466

Loans and financing payable - principal

-413,487

-123,161

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

785

62,456

Others

0

0

Net cash from financing activities

194,712

219,761

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-2,745

-8,463

Intangible acquisition

-4,132

-11,943

Intangible acquisition - Concession

-119,253

-95,727

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

0

Others

0

0

Net Cash from investment activities

-126,130

-116,133

 

   

Increase (Decrease) in Cash and Cash Equivalents

-12,145

-16,300

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

17,623

33,923

Cash and cash equivalents at end of the period – 12/31/14

5,478

17,623

.

-12,145

-16,300

 

 

212


 
 

 

 

Analysis of the result

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 345.2%, higher than that registered in the previous quarter, from a loss of R$ 51.5 million in 3Q14 to a profit R$ 126.4 million in 4Q14, mainly due to the following factors described.

 

Operating Revenue

 

The operating revenues of the company increased by 118.4%, from R$ 270.3 million in 3Q14 to R$ 590.3 million in 4Q14, mainly due to the recognition of regulatory assets (CVA) as OCPC 08, in the amount of the increasing in the number of customers as well as the average tariff readjustment of 25% from August 28, 2014.

 

The construction revenue increased by 29.2%, from R$ 37 million in 3Q14 to R$ 47.8 million in 4Q14, mainly due to the higher amount of investments in 4Q14.

 

The revenue of the usage of distribution network increased by 6.6%, from R$ 36.1 millionin 3Q14 to R$ 38.5 million in 4Q14 mainly dure to the increase in the revenue with the social tariff for low-income.

 

Operating Expense

 

The electric energy purchased for resale decreased by 163.3% from an expense of R$ 128 million in 3Q14, to a revenue of R$ 81.3 million in 4Q14, mainly due to increase in the price of purchased energy.

 

The charges of electric energy network usage increased by 98.9%, from R$ 21 millionin 3Q14 to R$ 41.9 million in 4Q14, mainly due to the increase in the thermal dispatch, in function of the low level of the reservoir in hydroelectric plant.

 

The personnel expenses, materials and third-part related services increased by 44.9%, from R$ 59.0 million in 3Q14 to R$ 85.5 million in 4Q14, mainly due to lines maintenance services and networks distribution by outsourced labor.

 

The operational provisions increased by 35.7%, from R$ 14.0 million in 3Q14 to R$ 19.0 million in 4Q14, mainly due to the impairment made in 4Q14.

 

The others operating expenses increased by 62.6%, from R$ 28.1 million in 3Q14 to R$ 45.7 million in 4Q14, due predominantly to the losses on receivables in 4Q14.

 

Financial Result

 

The arrears increased by 81.3%, from R$ 10.2 million in 3Q14 to R$ 18.5 million in 4Q14, mainly due to the update of electricity credits for installment campaign and reparcelling occurred in 4Q14.

 

The others net financial revenue and expenses presented a decrease of 4,614.8%, from a revenue of R$ 1.9 million in 3Q14 to an expense of R$ 87 million, mainly due to to the update of regulatory asset/liability according to OCPC 08.

213


 
 

 

 

Market Data

1. Generation Assets and Energy generated – N/A

 

2. Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

412,200.341

397,207.427

401,587.943

520,015.18

1,731,010.89

R$ million

20

21.1

28.9

31.26

101.26

Others

MWh

552,647.16

621,949.77

749,074.75

681,224.99

2,570,136.29

R$ million

108.7

116.3

87.7

132.64

502.34

Total

MWh

964,847.50

1,019,157.20

1,150,662.69

1,201,240.17

4,301,147.18

R$ million

128.70

137.4

116.6

163.9

603.60

 

3. Energy sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Residential

141.9

338,016

144.3

335,685

163.1

368,009

208.3

389,884

657.6

1,431,593

Industrial

15.9

48,94

17.1

52,412

20.8

59,348

24.2

55,088

78.0

215,788

Commercial

64.4

153,187

67.0

157,112

76.5

170,645

96.8

178,522

304.7

659,465

Rural

7.1

29,065

6.8

27,697

10.5

43,966

12.1

41,314

36.5

142,042

Public Utilities

21.3

49,632

23.5

53,394

25.9

56,101

32.6

62,026

103.4

221,152

Public Ilumination

11.2

47,217

11.5

44,961

13.3

46,842

16.8

49,438

52.8

188,457

Public Service

14.6

36,798

14.9

36,919

15.5

39,641

19.0

40,839

64.0

154,196

Own Consumption

0.3

905

0.4

904

0.4

962

0.5

1,007

1.6

3,778

Total

276.7

703,759

285.5

709,083

326.1

785,512

410.3

818,118

1,298.5

3,016,471

 

4. Number of Consumer Units Serviced

 

1Q14

2Q14

3Q14

4Q14

1,113,081

1,121,174

1,133,744

1,444,358

 

5. Network Expansion - number of new connections

 

1Q14

2Q14

3Q14

4Q14

2014

11,338

10,047

13,792

12,881

48.058

 

6. Substations

 

1Q14

2Q14

3Q14

4Q14

2014

81

81

83

83

83

 

7. Fuel used to produce electricity- N/A

 

8. Losses  - %

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

13.01

12.76

12.49

17.26

13.51

17.07

12.52

18.77

12.42

16.92

 

214

 
                                                                                                                 

 
 

 

 

9. Extension of distribution lines – Km

 

4Q14

87,500

     

10. DEC- Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

12.11

18.09

25.91

32.96

32.96

 

11. FEC – Frequency of interruptions – Number of outages

 

1Q14

2Q14

3Q14

4Q14

2014

6.36

11.08

15.24

20.58

20.58

 

12. TMA – Average response time – in minutes

 

1Q14

2Q14

3Q14

4Q14

2014

386.37

392.61

365.06

355.99

355.99

 

13. Average price– R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

338.46

346.44

360.87

442.19

371.99

 

14. Main investments – R$ million

 

Project

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Distribution

 

 

 

 

 

 

Rural Distribution Network Expansion - Light for All Program

10.2

10.9

11.5

7.3

39.9

112.1

Urban Distribution Network Expansion

6.5

5.1

2.9

5.5

20.1

125.9

Distribution System Maintenance

9.5

8.8

9.4

10.3

37.9

76.6

Renovation and Adequacy of Commercial and Distribution System

9.3

6.1

7.7

7.3

30.4

78.5

Others

-

-

-

 

 

34.5

Maintenance of Assets

0.6

0.2

1.8

1.5

4.1

8.0

Total

36.1

31.2

33.3

31.8

132.4

435.6

 

15.New Investments –N/A

16. Loans and financing – R$ million

 

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due

Index

BB

0.399

0.103

-

-

2014

IGPM + 8.46% p.y.

Eletrobras

811.142

863.708

911.466

1,020.658

2027

FINEL/RGR + 5% p.y.

RO + 11.4% p.y.

Morgan

7.758

7.320

8.166

8.840

2024

Dollar + 6% p.y.

CEF

-

-

28.472

29.063

2026

7% p.y.

 

 

215


 
 

 

 

17. Contract obligations – 12.31.14

 

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

After 2020

330.198

155.695

109.320

50.947

25.621

10.547

376.233

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

454,298.74

478,566.49

402,330.76

402,330.75

402,330.76

402,330.75

6,839,622.92

MWh

3,955,770

4,073,356

3,583,525.32

3,583,525.32

3,583,525.32

3,583,525.32

60,919,930.44

 

18. Default – more than 90 days – 12.31.13

 

Class

R$ Million

State utilities

 

Industrial

7.8

Residential

29.6

Commercial

21.3

Rural

5.7

Public Utilities

4.3

Public Ilumination

1.0

Public Service

88.3

Others

8.7

Total

166.7

 

19. Number of employees

 

19.1. By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

406

405

399

301

6 to 10

01

01

01

94

11 to 15

-

-

-

-

16 to 20

01

01

01

01

21 to 25

07

06

06

06

beyond 25

548

546

546

536

Total

963

959

953

938

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

62

59

62

58

6 to 10

01

01

02

10

11 to 15

-

-

-

-

16 to 20

-

-

-

-

21 to 25

07

06

06

06

beyond 25

139

139

139

136

Total

209

205

209

210

 

216


 
 

 

 

19.2.By region

 

State

1Q14

2Q14

3Q14

4Q14

Piauí

1,172

1,164

1,162

1,148

 

19.3.By departments

 

Department

 

1Q14

2Q14

3Q14

4Q14

Field

601

598

598

591

Administrative

571

566

564

557

 

20.Complementary work force

 

1Q14

2Q14

3Q14

4Q14

1,267

1,356

1,538

1,624

 

21.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.38

0.47

0.43

0.69

1.88

 

217


 
 

 

 

Balance Sheet

(R$ thousands)

 

Assets

12.31.14

12.31.13

Current Assets

 

 

 

 

 

Availabilities

4,525

40,894

Clients (Consumers and Resellers)

181,900

176,690

Marketable Securities

17,974

-

Fiscal Asset Deferred (taxes and Contributions)

10,225

10,894

Income Tax and Social Contribution

-

-

Reimbursement Rights – CCC (12,111 law)

34,224

122,530

Linked Deposits

446

1,193

Stored Material

18,124

4,147

Financial Asset – Indemnitiable Concessions

47,065

-

Others

15,506

44,901

Current Asset Total

329,989

401,249

 

 

 

Non-Current Assets

 

 

 

 

 

Clients (Consumers and Resellers)

27,723

25,873

Fiscal Asset Deferred (taxes and Contributions)

8,736

10,132

Reimbursement Rights – CCC (12,111 Law)

2,846,332

1,284,429

Linked Deposits

69,146

60,306

Financial Asset – Annual Allowed revenue (transmission)

776,057

610,949

Others

3,909

4,269

Advance for equity participation

-

-

 

3,731,903

1,995,958

Investments

1,806

1,806

Fixed Asset

29,441

30,416

Intangible

59,035

84,160

 

 

 

Non-Current Assets Total

3,822,185

2,112,340

Total Assets

4,152,174

2,513,589

 

218


 
 

 

 

 

Liabilities and Stockholders Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

630,141

481,590

Loans and Financing

98,396

122,261

Taxes and Social Contribution

37,924

35,810

Income tax and Social Contribution

6,480

-

Reimbursement Obligations – CCC (12,111 law)

11,238

10,653

Clients Advance

-

-

Remuneration to Shareholders (dividends to pay)

-

-

Estimated Obligations

18,073

21,240

Provisions for Contingencies

-

-

Post-Employment Benefit (Complementary Pension Fund)

-

-

Leasing

-

-

Onerous Contracts

-

-

Sectorial Charges (regulatory taxes)

9,565

5,970

Incentive to personnel retirement

-

-

Others

30,889

35,128

Current Liabilities Total

842,706

712,652

 

 

 

Non-Current Liabilities

 

 

Suppliers

967,919

-

Loans and Financing

593,696

359,548

Taxes and Social Contribution

3,595

3,468

Income tax and Social Contribution

-

-

Reimbursement Obligations – CCC (12,111 law)

139,647

134,745

Advance of clients

-

-

Provision for contingencies

131,471

118,236

Provision for onerous contracts

-

-

Post-Employment Benefit (Complementary Pension Fund)

-

-

Sectorial Charges (regulatory charges)

33,249

31,523

Advance for future capital increase

245

233

Others

1,335,580

1,341,838

Non-Current Liabilities Total

3,205,402

1,989,591

 

 

 

 

 

 

Stockholders Equity

 

 

Social Capital

1,325,124

1,325,124

Capital Reserves

-

-

Profit Reserves

-

-

Additional proposed Dividend

-

-

Acccumulated Profit/Losses

-1,221,058

-1,513,778

Other comprehensive income

-

-

Non-controlling shareholders participation

-

-

Stockholders Equity Total

104,066

-188,654

 

 

 

Total Liabilities and Stockholders Equity

4,152,174

2,513,589

 

219


 
 

 

 

Statement of Income

(R$ thousands)

 

 

12.31.14

12.31.13

Operating Revenue

 

 

Electric Energy Supply - Distribution

1,330,988

1,116,293

Construction Revenue - Distribution

166,360

217,309

Other Operating Revenue

188,713

54,680

Deductions of Revenue

-377,122

-318,589

Net Operating Revenue

1,308,939

1,069,693

 

 

 

Operational Costs

 

 

Electric Energy purchased for resale

-444,383

-597,419

Construction Cost

-166,360

-217,309

 

 

 

Operational Expenses

 

 

Personnel, Material and third-part related service

-251,049

-252,503

Charges on electric network usage

-14,674

-12,608

Depreciation and Amortization

-34,182

-31,137

Donations and Contributions

-394

-282

Provisions

1,583

-7,358

Others

14,490

-229,901

Operational Costs and Expenses

-894,969

-1,348,517

 

 

 

Operating Result before Financial Result

413,970

-278,824

 

 

 

Financial Result

-99,347

-44,326

Result before Income tax and Social Contribution

314,623

-323,150

 

 

 

Current Income tax and social Contribution

-21,903

-

Deferred Income tax and Social Contribution

-

-

Net Result of the Period

292,720

-323,150

 

 

 

 

 

 

 

 

 

 

220


 
 

 

 

Cash Flow

(thousands reais)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

314,623

-313,912

Depreciation and amortization

34,182

31,137

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

5,321

14,668

Financing charges

61,603

33,514

Equity Method

0

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

-6,524

-78,367

Provisions for contingencies

7,203

8,587

Provision for staff realignment

0

5,945

Provision for impairment of assets

0

88,245

Provision for losses with onerous contracts

0

-131,200

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

0

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

57,991

280,296

Variation in operating assets / liabilities

-482,642

-56,041

Net cash from operating activities

-8,243

-117,128

 

   

Financing charges – payment

-36,141

-34,354

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

0

Legal deposits

-1,972

91,578

Net cash from Operational activities

-46,356

-59,904

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

474,430

227,669

Loans and financing payable - principal

-294,729

-20,128

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

0

43,000

Others

0

0

Net cash from financing activities

179,701

250,541

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-820

-6,630

Intangible acquisition

-7,262

-16,117

Intangible acquisition - Concession

-161,632

-202,328

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

0

Others

0

0

Net Cash from investment activities

-169,714

-225,075

 

   

Increase (Decrease) in Cash and Cash Equivalents

-36,369

-34,438

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

40,894

75,332

Cash and cash equivalents at end of the period – 12/31/14

4,525

40,894

.

-36,369

-34,438

 

221


 
 

 

Marketletter

Analysis of the result

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a net profit 913.1% higher than that registered in the previous quarter, from a loss of R$ 35.1 million in 3Q14 to a R$ 285.4 million profit in 4Q14, mainly due to the following factors described.

 

Operating Revenue

 

The revenues of the company increased by 52.4%, from R$ 300.0 million in 3Q14 to R$ 457.1 million in 4Q14, mainly due to the recognition of regulatory assets (CVA) as OCPC 08.

 

Operating Expenses

 

The personnel expenses, material and services decreased by 8.5%, from R$ 66.3 million in 3Q14 to R$ 60.7 million in 4Q14, mainly due to adjustments made in previous quarter

 

The electric energy purchased for resale decreased by 61.3% from R$ 182.8 million in 3Q14 to R$ 70.8 million in 4Q14, mainly due to the power purchase agreement with Termonorte II.  In this quarter, as the company consumed less energy than had hired, there was compensation in the amounts of purchased energy.

 

The operational provisions decreased by 543.4%, from a provision of R$ 2.6 million in 3Q14, to a reversal of R$ 11.7 million in 4Q14, mainly due to the reversal of provision of doubtful credits.

 

The other operating expenses decreased by 470.8% from an expense of R$ 25.2 million in 3Q14 to a R$ 93.5 million in 4Q14, mainly due to reimbursement of the cost of amounts non-compensated ICMS and PIS / PASEP and COFINS, in the fuel purchase transaction.

 

Financial Result

 

The other financial income increased by 1,628%, from R$ 1.9 million in 3Q14 to R$ 33.8 million in 4Q14, mainly due to interest accrual of credits with the CCC funding.

The other financial expenses increased by 925.7%, from R$ 9.0 million in 3Q14 to R$ 92.4 million in 4Q14, mainly due to debt interest with Petrobras.

222


 
 

 

 

Market Data

 

1. Generation Assets and Energy generated

 

Own assets

 

Plant

Installed Capacity

(MW)

Guaranteed energy

(MW Avg)

Energy Generated (MWh)

 

1Q14

2Q14

3Q14

4Q14

2014

SHU – Rio Vermelho

2.6

2.0

5,075.3

2,536.19

-

1,238.17

8,849.66

 

Plant

Location

(State)

Beginning of Operation

End of Operation

SHU – Rio Vermelho

RO

11/1986

Under Operation

 

2. Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras (SIN)

MWh

556,127

591,913

761,389

665,548

2,574,977

R$ million

85.1

29.5

160.8

31.3

306.7

Others

MWh

361,846

385,089

284,023

349,034

1,379,992

R$ million

55.4

19.1

59.3

16.9

150.7

Total

MWh

917,973

977,002

1,045,412

1,014,582

3,954,969

R$ million

140.5

48,6

220.1

48.2

457.4

 

3. Energy sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$ million

MWh

Residential

138.6

275,766

141.2

278,24

149.3

295,371

157.4

308,068

586.4

1,157,444

Industrial

45.6

122,601

48.1

135,01

44.7

133,343

49.4

134,708

187.8

525,662

Commercial

72.5

147,073

73.7

152,843

78.5

163,919

81.5

168,541

306.2

632,376

Rural

22.0

68,029

23.2

69,498

24.4

74,409

24.5

73,739

94.1

285,676

Public Utilities

20.0

44,629

22.7

51,728

24.5

56,57

24.1

55,563

91.3

208,49

Public Ilumination

3.7

33,435

3.8

31,896

3.9

32,237

3.8

32,324

15.1

129,892

Public Service

8.7

11,761

8.8

12,129

8.7

12,319

8.9

12,34

35.1

48,549

Own Consumption

0.4

900

0.5

1,073

0.5

989

0.5

1,003

1.9

3,966

Total

311.5

704,195

322.0

732,417

334.5

769,158

350.1

786,286

1,318

2,992,056

                                                                                                                        

4. Number of Consumer Units Serviced  

 

1Q14

2Q14

3Q14

4Q14

567,612

569,867

575,356

580,859

 

5. Network Expansion - number of new connections

 

1Q14

2Q14

3Q14

4Q14

2014

5,531

6,153

6,976

8,715

27,375

 

6. Substations

1Q14

2Q14

3Q14

4Q14

2014

57

57

57

57

57

 

 

223

 
                                                                                                                 

 
 

 

 

7. Fuel used to produce electricity

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Amount

R$ Million

Diesel oil

Litre

126,011.5

310.99

133,118.5

319.90

116,708.0

296.48

127,997.0

345.94

493,835,000

1,273.31

 

8. Losses - % 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

11.15

11.27

11.15

12.04

11.15

12.75

11.15

10.13

11.15

12.09

 

9. Extension of distribution lines

4Q14

57,129

 

10. DEC- Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

6.82

10.80

17.15

28.79

28.79

 

11. FEC – Frequency of interruptions – Number of outages

1Q14

2Q14

3Q14

4Q14

2014

6.23

10.49

16.71

24.52

24.52

 

12. TMA – Average response time – in minutes

1Q14

2Q14

3Q14

4Q14

2014

238.39

229.43

231.84

258.27

258.27

 

13. Average price – R$/MWh

 

1Q14

2Q14

3Q14

4Q14

2014

352.49

336.94

350.83

355.50

348,94

 

14. Main investments – R$ million  

Project

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Distribution

 

 

 

 

 

 

Rural Expansion of distribution - Light for All Project

0.43

1.13

0.02

0.15

1.73

100.00

Expansion of Urban distribution

24.58

26.23

26.99

21.11

98.91

268.02

Maintenance of the distribution system

17.78

8.09

9.66

12.28

47.81

38.73

Isolated system - energy

0.00

0.00

0.00

0.00

0.00

0.00

Renovation – Distribution and Comercialization System

2.69

4.48

5.21

4.12

16.50

89.77

Others

 

 

 

 

 

 

Maintenance and Adjustment of property / IT assets

0.55

2.72

1.11

0.22

4.60

11.02

Total

46.03

42.65

42.99

37.88

169.55

507.54

 

 

224


 
 
 
15. New Investments– N/A

16. Loans and financing – R$ million

Creditor

Balance

03.31.14

Balance

06.30.14

Balance

09.30.14

Balance

12.31.14

Due

Index

Eletrobras

512.1

554.7

630.8

695.5

2025

IPCA/FINEL/RGR + 5 % py.

 

17. Contract obligations - 12.31.14

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

After 2020

99.8

118.8

117.8

66.8

49.4

37.3

205.6

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

702.267

780.914

842.551

1,060.572

1,124.206

1,190.593

4,016.843

MWh

4,661,341

4,889,967

4,977,287

5,910,592

5,910,592

5,905,307

17,731,776

 

18.Default

Class

R$ million

Residential

13.5

Industrial

17.6

Commercial

8.2

Rural

4.0

Public Utilities

6.0

Public Ilumination

7.1

Public Service

15.4

Others

-

Total

71.8

 

19.Number of employees

 

19.1.By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

138

136

142

133

6 to 10

159

162

146

150

11 to 15

01

-

-

-

16 to 20

39

41

39

36

21 to 25

36

36

35

37

beyond 25

201

200

185

185

Total

574

575

547

541

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

22

22

25

21

6 to 10

63

58

60

58

11 to 15

2

2

2

02

16 to 20

6

4

6

04

21 to 25

8

26

8

07

beyond 25

98

81

113

95

Total

199

193

214

187

 

 

225


 
 

 

 

19.2.By region

 

State

 

1Q14

2Q14

3Q14

4Q14

Rondônia

773

768

761

728

 

19.3.By departments

 

Department

 

1Q14

2Q14

3Q14

4Q14

Field

574

575

547

541

Administrative

199

193

214

187

 

20.Complementary work force

 

1Q14

2Q14

3Q14

4Q14

1,140

1,140

1,195

1,055

 

21.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

0.38

0.26

0.52

0.85

1.99

 

 

 

 

 

226


 
 

 

 

Balance Sheet

(R$ thousands)

 

 

Assets

12.31.14

12.31.13

Current Assets

 

 

 

 

 

Availabilities

7,286

7,501

Clients (Consumers and Resellers)

51,871

69,505

Marketable Securities

-

-

Fiscal Asset Deferred (taxes and Contributions)

8,796

5,116

Income tax and Social Contribution

-

-

Reimbursement Rights – CCC (12,111 Law)

146,857

56,864

Linked Deposits

-

-

Stored Material

1,709

1,731

Financial Asset – Indemnitiable Concessions

469

-

Others

12,590

7,133

Current Asset Total

229,578

147,850

 

 

 

Non-Current Assets

 

 

 

 

 

Clients (Consumers and Resellers)

3,502

4,920

Fiscal Asset Deferred (taxes and Contributions)

1,792

7,812

Reimbursement Rights – CCC (12,111 Law)

66,185

-

Linked Deposits

17,937

16,464

Financial Asset – Annual Allowed revenue (transmission)

172,523

146,160

Others

3,197

1,575

Advance for equity participation

-

-

 

265,136

176,931

Investments

0

0

Fixed Asset

11,746

11,449

Intangible

19,086

7,299

 

 

 

Non-Current Assets Total

295,968

195,679

Total Assets

525,546

343,529

 

 

 

227


 
 

 

 

 

Liabilities and Stockholders’ Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

228,317

147,485

Loans and Financing

7,905

7,743

Taxes and Social Contribution

6,446

4,524

Income tax and Social Contribution

-

-

Reimbursement Obligations – CCC (12,111 law)

-

-

Advance from clients

-

-

Remuneration to Shareholders (dividends to pay)

-

-

Estimated Obligations

15,161

17,761

Provisions for Contingencies

-

-

Post-Employment Benefit (Complementary Pension Fund)

-

-

Onerous Contracts

-

-

Concessions to pay - UBP

-

-

Sectorial Charges (regulatory taxes)

-

-

Incentive to personnel retirement

-

-

Others

45,614

3,948

Current Liabilities Total

303,443

181,461

 

 

 

Non-Current Liabilities

 

 

Suppliers

128,541

-

Loans and Financing

36,543

17,495

Taxes and Social Contribution

-

-

Income tax and Social Contribution

-

-

Reimbursement Obligations – CCC (12,111 law)

57,209

55,066

Advance from clients

-

-

Estimated Obligations

198

-

Provision for contingencies

47,713

21,912

Provision for onerous contract

-

-

Post-Employment Benefit (Complementary Pension Fund)

2,851

1,053

Sectorial Charges (regulatory charges)

-

-

Advance for future capital increase

-

-

Others

18,774

58,248

Non-Current Liabilities Total

291,829

153,774

 

 

 

 

 

 

Stockholders Equity

 

 

Social Capital

684,204

684,204

Capital Reserves

-

-

Profit Reserves

-

-

Additional proposed Dividend

-

-

Acccumulated Profit/Losses

-750,425

-674,534

Other comprehensive income

-3,505

-1,376

Non-controlling shareholders participation

-

-

Stockholders’ Equity Total

-69,726

8,294

 

 

 

Total Liabilities and Stockholders’ Equity

525,546

343,529


 

 

 

228


 
 

 

 

Statement of Income

(R$ thousands)

 

 

 

12.31.14

12.31.13

Operating Revenue

 

 

Supply

-

29,147

Electric Energy Supply - Distribution

240,293

194,384

Construction Revenue - Distribution

15,046

14,648

Other Operating Revenue

9,378

4,715

Deductions of Revenue

-57,618

-53,237

Net Operating Revenue

207,099

189,657

 

 

 

Operational Costs

 

 

Electric Energy purchased for resale

-97,966

-101,830

Charges on electric network usage

-

-

Construction Cost

-15,046

-14,648

Fuel

-23,230

-14,933

 

 

 

Operational Expenses

 

 

Personnel, Material and third-part related service

-85,786

-88,474

Depreciation and Amortization

-9,395

-8,899

Donations and Contributions

-

-

Provisions

-32,708

65,922

Others

-7,006

-2,983

Operating Costa and Expenses

-271,137

-165,845

 

 

 

Operating Result before Financial Result

-64,038

23,812

 

 

 

Financial Result

-11,853

5,333

Result before Income tax and Social Contribution

-75,891

29,145

 

 

 

Current Income tax and social Contribution

-

-

Deferred Income tax and Social Contribution

-

-

Net Result of the Period

-75,891

29,145

 

229


 
 

 

 

Cash Flow

(thousands of reais)

 

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

-51,689

53,253

Depreciation and amortization

9,395

9,306

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

0

0

Financing charges

4,214

2,695

Equity Method

0

0

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

29,932

-49,771

Provisions for contingencies

4,756

1,455

Provision for staff realignment

0

0

Provision for impairment of assets

0

0

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

0

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

-23,217

-24,578

Variation in operating assets / liabilities

30,136

33,770

Net cash from operating activities

3,527

26,130

 

   

Financing charges – payment

-2,409

-2,495

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

0

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

0

0

Complementary pension fund payment

0

0

Lawsuits payment

0

0

Legal deposits

0

0

Net cash from Operational activities

1,118

23,635

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

45,122

9,142

Loans and financing payable - principal

-27,717

-3,289

Payment of Shareholders remuneration

0

0

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

0

0

Others

0

0

Net cash from financing activities

17,405

5,853

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-12,247

-1,173

Intangible acquisition

-4,770

-2,370

Concession Asset Acquisition

-1,722

-33,184

Advance for future capital increase

0

0

Acquisition of equity participation investment

0

0

Others

0

0

Net Cash from investment activities

-18,739

-36,727

 

   

Increase (Decrease) in Cash and Cash Equivalents

-216

-7,239

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

7,502

14,741

Cash and cash equivalents at end of the period – 12/31/14

7,286

7,502

,

-216

-7,239

 

 

 

 

 

230


 
 

 

 

Analysis of the result

 

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a result 80% higher than that registered in the previous quarter, from a loss of R$ 25.9 million in 3Q14 to a loss of R$ 5.2 million in 4Q14, mainly due to the factors described below.

 

Operating Revenue

 

In Generation:

 

The electric energy supply for distributors increased by 85.1%, from R$ 5.8 million in 3Q14 to R$ 10.7 million in 4Q14, mainly due to the average increase of 16.95% in energy sales in 4Q14 and the adjustment in the sale of energy in previous quarters.

 

In Distribution:

 

The supply of electric energy increased by 27.6%, from R$ 49.2 million in 3Q14 to R$ 62.7 million in 4Q14, mainly due to the average increase of 16.95% in energy sales in 4Q14, the influence of charge two malls opened in the service area in 4Q14.

 

Operating Expenses

 

The personnel expenses, materials and third-part related service ncreased by 22.5%, from R$ 19.3 million in 3Q14 to R$ 23.7 million in 4Q14, mainly due to the hiring of new employees and hiring services data processing maintenance.

 

The fuel used for electric network production net in CCC increased by 67.2% from  $ 5.0 million in 3Q14 to R$ 8.4 million in 4Q14, mainly due to the increase of own generation due to reduction of energy purchased for resale from Venezuela.

 

The operational provisions increased by 80%, from R$ 8.9 million in 3Q14 to R$ 16.0 million in 4Q14, mainly due to the provision for doubtful credits of R$ 5.1 million and other provisions in R$ 2 million.

 

The others operating expenses decreased by 4,177.1%, from an expense of R$ 0.5 million in 3Q14, to a R$ 21.0 million in 4Q14, mainly due to the reversal of the impairment in the amount of R$ 23.4 million.

 

Financial Result

 

The debt charges increased by 647.8%, from R$ 0.3 million in 3Q14 to R$ 2.1 million in 4Q14, mainly due to the entry of new loan and financing contracts from Eletrobras.

 

The others revenues and net financial expenses decreased by 726.9%, from an expense of R$ 0.2 million in 3Q14 to an expense of R$ 1.9 million in 4Q14, mainly due to the correction of receivables amounts from reimbursement of CCC registered in 4Q14.

 

 

 

 

 

 

231


 
 

 

 

Market Data

 

1. Generation Assets and Energy generated (IPPs contract)

 

Plant

InstalledCapacity (MW)

Energy generated (MWh)

Beginning of Operation

End of Concession

1Q14

2Q14

3Q14

4Q14

2014

Floresta

40MW

15.924

16.393

16.001

27.150

75.468

Apr/2010

Apr/2015

Distrito

20MW

15.952

19.943

19.251

28.300

83.446

Apr/2010

Apr/2015

 

2. Electric energy purchased for resale

 

System

Unit

1Q14

2Q14

3Q14

4Q14

2014

Eletrobras

MWh

199,305

202,663

213,744

217,803

833,515

R$ million

40.5

40.5

43.0

44.8

168.9

Others

MWh

-

-

-

 

 

R$ million

-

-

-

 

 

Total

MWh

199,305

202,663

213,744

217,803

833,515

R$ million

40.5

40.5

43.0

44.8

168.9

 

3. Energy sold

 

Distribution to

1Q14

2Q14

3Q14

4Q14

2014

R$ million

MWh

R$ million

MWh

R$ million

MWh

R$

million

MWh

R$ million

MWh

Residential

29.0

89,889

29.0

91,183

28.7

89,634

35.1

102,26

121.8

372,966

Industrial

1.3

3,566

1.4

4,189

1.4

4,24

1.5

4,53

5.6

16,525

Commercial

11.9

38,258

11.9

38,499

12.2

39,862

14.8

45,093

50.8

161,713

Rural

1.3

5,273

0.8

2,972

0.8

3,08

1.3

5,286

4.3

16,611

Public Utilities

11.1

18,294

6.4

22,105

6.2

21,475

7.4

22,934

31.1

84,808

Public Ilumination

0.9

6,624

0.9

7,156

0.9

7,168

1.2

7,215

3.8

28,163

Public Service

1.1

4,642

1.2

4,665

1.8

5,054

1.4

5,318

5.5

19,679

Own Consumption

0.2

290

0.1

280

0.2

287

0.2

316

0.6

1,173

Total

56.7

166,836

51.7

171,049

52.2

170,8

62.9

192,952

223.5

701,637

 

4. Number of Consumer Units Serviced

 

1Q14

2Q14

3Q14

4Q14

98,936

100,546

101,559

102,078

 

5. Network Expansion - number of new connections

1Q14

2Q14

3Q14

4Q14

2014

3,602

1,820

2,000

1,650

9,072

 

6. Substations

1Q14

2Q14

3Q14

4Q14

2014

03

03

03

03

03

 

7. Fuel used to produce electricity

 

Type

Unit

1Q14

2Q14

3Q14

4Q14

2014

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Amount

R$ million

Diesel oil

Litre/ million

11.4

33.8

10.3

30.5

11.2

33.1

15.62

46.16

48.52

143.56

232

 
                                                                                                                 

 
 

 

 

8. Losses - %

 

1Q14

2Q14

3Q14

4Q14

2014

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

Technical

Commercial

7.04

4.67

7.04

2.49

7.04

5.98

7.04

4.49

7.04

4.49

 

9. Extension of distribution lines – 09.30.13

 

4Q14

3,508

 

10. DEC- Duration of interruptions - in hours

 

1Q14

2Q14

3Q14

4Q14

2014

2.28

4.36

7.53

14.70

14.70

 

11. FEC – Frequency of interruptions – Number of outages

1Q14

2Q14

3Q14

4Q14

2014

3.92

6.33

10.94

19.83

19.83

 

12. TMA – Average response time – in minutes

1Q14

2Q14

3Q14

4Q14

2014

76.06

80.57

84.74

88.65

88.65

 

13. Average price– R$/MWh

1Q14

2Q14

3Q14

4Q14

2014

263.957

260.831

260.965

270.124

263.969

 

14. Main investments – R$ million

Project

1Q14

2Q14

3Q14

4Q14

2014

2014 Budget

Distribution

2.01

4.08

3.40

6.42

15.90

32.78

Expansion of Urban Distribution (Light for All Program)

-

-

0.11

0

0.11

0.8

Expansion of Urban Distribution (regular)

1.13

0.99

1.62

3.06

6.81

16.5

Maintenance of energy distribution system

0.65

1.23

1.00

1.14

4.00

6.76

Modernization and adaptation of energy distribution and Energy trading system

0.23

1.86

0.67

2.22

4.98

8.72

Others

0.02

0.17

0.24

4.43

4.86

12.74

Maintenance and adjustment of property

-

-

-

-

-

0.89

Maintenance and adjustment of goods

-

-

0.24

0.66

0.90

4.42

Maintenance and adjustment of thechnological activity

0.02

0.17

-

3.77

3.96

7.43

Total

2.03

4.25

3.64

10.85

20.76

45.52

 

15. New Investments

 

Project

1Q14

2Q14

3Q14

4Q14

2014 Budget

Extension of Urban Network Distribution

1.13

0.99

1.62

3.06

16.5

 

 

233


 
 

 

 

16. Loans and financing – R$ million

 

Creditor

Balance on

03.31.14

Balance on

06.30.14

Balance on

09.30.14

Balance on

12.31.14

Date Due

Index

Eletrobras

23.48

41.27

38.78

42.42

Up to 2019

According to ECF (Diverses)

 

17.Contract obligations –12.31.14

 

Loans and financing

R$ million

2015

2016

2017

2018

2019

2020

After 2020

21.78

4.06

1.76

1.82

2.25

2.01

3.98

 

Energy Purchase Contracts

2015

2016

2017

2018

2019

2020

After 2020

R$ million

284.9

338.4

386.9

474.1

525.5

581.1

7.222

MWh

953

1,032

1,093

1,155

1,216

1,278

13,398

 

18. Default

Class

R$ million

State utilities

12.35

Industrial

0.04

Residential

0.51

Commercial

0.13

Others

25.54

Total

38.56

 

 

19.Number of employees

 

19.1.By tenure

 

Distribution

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

18

13

31

33

6 to 10

60

43

39

39

11 to 15

-

23

24

24

16 to 20

-

1

-

-

21 to 25

25

13

-

-

beyond 25

33

40

56

56

Total

136

133

150

152

 

 

234


 
 

 

 

 

Administration

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

10

07

12

12

6 to 10

86

42

43

43

11 to 15

-

43

43

43

16 to 20

-

2

1

01

21 to 25

9

9

3

03

beyond 25

19

19

24

23

Total

124

122

126

125

 

19.2.By region

 

State

 

1Q14

2Q14

3Q14

4Q14

Roraima

260

255

276

277

 

19.3.By departments

 

Department

 

1Q14

2Q14

3Q14

4Q14

Field

136

133

150

152

Administrative

124

122

126

125

 

20.Complementary work force                                            

1Q14

2Q14

3Q14

4Q14

269

267

267

197

 

21.Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

0.00

0.01

0.038

0.0072

 

 

235


 
 

 

 

 

 

Balance Sheet

(R$ thousands)

 

 

Assets

12.31.14

12.31.13

Current Assets

 

 

 

 

 

Availabilities

14,529

54,240

Clients (Consumers and Resellers)

-

-

Loans and Financing

-

-

Marketable Securities

42,075

-

Dividends to receive (remuneration of equity participation)

552

1,211

Fiscal Asset Deferred (taxes and Contributions)

2,518

1,803

Income tax and Social Contribution

-

-

Linked Deposits

-

-

Stored Material

-

-

Financial Asset

-

-

Others

-

-

Current Asset Total

59,674

57,254

 

 

 

 

 

 

Non-Current Assets

 

 

 

 

 

Clients (Consumers and Resellers)

-

-

Loans and Financing

-

-

Marketable Securities

-

-

Fiscal Asset Deferred (taxes and Contributions)

2,741

-

Income tax and Social Contribution

-

2,741

Linked Deposits

51

48

Others

-

-

Advance for equity participation

-

-

 

2,792

2,789

 

 

 

Investments

91,009

92,546

Fixed Asset

57

28

Intangible

19

19

 

 

 

Non-Current Assets Total

93,877

95,382

Total Assets

153,551

152,636

 

236


 
 

 

 

 

 

Liabilities and Stockholders Equity

12.31.14

12.31.13

Current Liabilities

 

 

Suppliers

876

817

Loans and Financing

-

-

Taxes and Social Contribution

81

33

Income tax and Social Contribution

53

-

Derivatives

-

-

Remuneration to Shareholders (dividends to pay)

-

801

Estimated Obligations

211

220

Provisions for Contingencies

-

-

Post-Employment Benefit (Complementary Pension Fund)

-

-

Leasing

-

-

Onerous Contracts

-

-

Others

-

-

Current Liabilities Total

1,221

1,871

 

 

 

Non-Current Liabilities

 

 

Suppliers

-

-

Loans and Financing

-

-

Bonds

-

-

Taxes and Social Contribution

-

-

Income tax and Social Contribution

11,428

8,860

Derivatives

-

-

Estimated Obligations

-

-

Provision for contingencies

-

-

Provision for uncovered liabilities on invested companies

-

-

Provision for onerous contract

-

-

Post-Employment Benefit (Complementary Pension Fund)

-

-

Sectorial Charges (regulatory charges)

-

-

Advance for future capital increase

-

-

Others

-

-

Non-Current Liabilities Total

11,428

8,860

 

 

 

 

 

 

Stockholders Equity

 

 

Social Capital

118,054

118,054

Capital Reserves

-

-

Profit Reserves

3,159

3,159

Additional proposed Dividend

-

2,401

Acccumulated Profit/Losses

-2,944

-

Other comprehensive income

22,633

18,291

Non-controlling shareholders participation

-

-

Stockholders Equity Total

140,902

141,905

 

 

 

Total Liabilities and Stockholders Equity

153,551

152,636

 

 

237


 
 

 

 

 

Statement of Income

(R$ thousands)

 

 

 

12.31.14

12.31.13

Operating Revenue

 

 

Equity Participation Revenue

10,521

2,976

Operating Revenue Total

10,521

2,976

 

 

 

Operational Costs and Expenses

 

 

Personnel, Material and third-part related service

-3,195

-3,467

Depreciation and Amortization

-20

-14

Donations and Contributions

-

-

Provisions

-13,935

1,712

Others

-1,461

-2,681

Operating Costs and Expenses

-18,611

-4,450

 

 

 

Operating Result before Financial Result

-8,090

-1,474

 

 

 

Financial Result

5,665

3,416

Result before Income tax and Social Contribution

-2,425

1,942

 

 

 

Current Income tax and social Contribution

-519

-

Deferred Income tax and Social Contribution

-

-9

Net Result of the Period

-2,944

1,933

 

 

 

 

 

238


 
 

 

 

 

Cash Flow

(thousands Reais)

Cash Flow

12.31.14

12.31.13

OPERATING ACTIVITIES

   

Result before income tax and social contribution

-2,425

3,372

Depreciation and amortization

20

13

Intangible Amortization – Distribution / Transmission

0

0

Monetary and Exchange net variations

0

0

Financing charges

0

0

Equity Method Result

-747

-679

Provision for uncovered liability

0

0

Provision for credits of doubtful liquidation

0

0

Provisions for contingencies

0

-1,713

Provision for losses with Investments

0

0

Provision for impairment of assets

13,935

0

Provision for losses with onerous contracts

0

0

Provision for Financial Asset loss

0

0

Global reversal reserve charges

0

0

Present value adjustment

0

0

Minority Participation in Result

0

0

Charges on shareholders funds

0

0

Financial asset revenue by IRR

0

0

Derivative financial instruments

0

0

Others

-4,769

0

Variation in operating assets / liabilities

-40,435

-828

Net cash from operating activities

-34,420

165

 

   

Financing charges – payment

0

0

Payment of charges of global reversal reserve

0

0

Financial charges receivable

0

0

Remuneration from equity participation

0

1,331

Financial asset revenue by AAR

0

0

Financial Asset on receiving indemnities

0

0

Payment of income tax and social contribution

-519

-9

Complementary pension fund payment

0

0

Lawsuits payment

0

0

Legal deposits

0

1,730

Net cash from Operational activities

-34,939

3,216

 

   

FINANCING ACTIVITIES

   

Loans and financing obtained

0

0

Loans and financing payable - principal

0

0

Payment of Shareholders remuneration

-3,202

-12,775

Refinancing of taxes and contributions payment - principal

0

0

Capital increase - receivable

0

0

Others

0

7

Net cash from financing activities

-3,202

-12,768

 

   

INVESTMENT ACTIVITIES

   

Fixed Asset acquisition

-50

-14

Intangible acquisition

0

0

Concession asset acquisition

0

0

Advance for future capital increase

0

0

Acquisition of equity participation investment

-1,520

0

Others

0

0

Net Cash from investment activities

-1,570

-14

 

   

Increase (Decrease) in Cash and Cash Equivalents

-39,711

-9,566

 

   

Cash and cash equivalents at beginning of the period – 12/31/13

54,240

63,804

Cash and cash equivalents at end of the period – 12/31/14

14,529

54,240

,

-39,711

-9,564

 

239


 
 

 

 

 

Analysis of the Result

 

4Q14 x 3Q14

 

The Company presented in 4Q14 a profit 93.7% lower than the reported in the previous quarter, from a R$ 6.3 million profit in 3Q14 to a R$ 0.4 million profit in 4Q14.

 

Participation Equity Revenue

 

The Result of Investments in Equity decreased by 97.6%, from a gain of R$ 6.8 million in 3Q14 to a gain of R$ 0.2 million in 4Q14 due to reversal of provision for EMAE held in 3Q14.

 

 

240


 
 

 

 

 

Market Data

 

1.    Investments

 

Company

Type

Amount

Participation (%)

CTEEP

PN

1,060,225

0.65

Eletropaulo

PNB

2,095,644

1.25

EMAE

PN

523,911

1.42

Energias do Brasil

ON

1,485,678

0.31

CPFL Energia

ON

1,703,600

0.18

 

2. Number of employees (including requested employees from other Eletrobras companies/excluding employees assigned to other  Eletrobras companies)

 

2.1.By tenure

 

Composition of employees by tenure (Years)

1Q14

2Q14

3Q14

4Q14

Up to 5

02

02

02

02

6 to 10

02

02

02

02

11 to15

-

-

-

-

16 to 20

-

-

-

-

21 to 25

-

-

-

-

Beyond 25

-

-

-

-

Total

04

04

04

04

 

2.1.By region

 

State

.

1Q14

2Q14

3Q14

4Q14

RJ

04

04

04

04

 

3. Complementary work force

 

1Q14

2Q14

3Q14

4Q14

06

06

06

06

 

4. Turn-over - %

 

1Q14

2Q14

3Q14

4Q14

2014

-

-

-

-

-

 

 

 

241

 

SIGNATURE
 
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

Date: April 9, 2015
CENTRAIS ELÉTRICAS BRASILEIRAS S.A. - ELETROBRÁS
By:
/SArmando Casado de Araujo
 
Armando Casado de Araujo
Chief Financial and Investor Relation Officer
 
 

 

 
FORWARD-LOOKING STATEMENTS

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will actually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.